Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| CFF Rice Mill Solar Plant | California Family Foods | Arbuckle, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 145.0 MWh | Nov 2025 | Dec 2025 | Solar |
| Siphon Drop Power Plant | Yuma County Water User's Association | Winterhaven, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 11.6 GWh | Aug 1987 | Dec 2025 | Water |
| Parker Dam | U S Bureau of Reclamation | Parker, CA | Western Area Power Administration - Desert Southwest Region (WALC) | 363.5 GWh | Nov 1942 | May 2026 | Water |
| Almond Power Plant | Turlock Irrigation District | Modesto, CA | Turlock Irrigation District (TIDC) | 137.4 GWh | Mar 1996 | May 2026 | Natural Gas |
| Turlock Lake | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.2 GWh | Jun 1980 | Dec 2025 | Water |
| Hickman | Turlock Irrigation District | Hickman, CA | Turlock Irrigation District (TIDC) | 3.6 GWh | Aug 1979 | Dec 2025 | Water |
| Upper Dawson | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 8.9 GWh | Oct 1983 | Dec 2025 | Water |
| Don Pedro | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 285.7 GWh | Apr 1971 | May 2026 | Water |
| Walnut Energy Center | Turlock Irrigation District | Turlock, CA | Turlock Irrigation District (TIDC) | 1.5 TWh | Jan 2006 | May 2026 | Natural Gas |
| La Grange | Turlock Irrigation District | La Grange, CA | Turlock Irrigation District (TIDC) | 6.6 GWh | Nov 1924 | Dec 2025 | Water |
| Enchanted Rock Turlock Irrigation Distri | Enchanted Rock | Patterson, CA | Turlock Irrigation District (TIDC) | 2.5 GWh | Apr 2024 | Dec 2025 | Natural Gas |
| Blue Skies Solar, LLC | Headwater Energy, LLC | Arvin, CA | PacifiCorp West (PACW) | 2.0 GWh | Nov 2021 | Dec 2024 | Solar |
| Adapture CA2, LLC | Adapture Renewables, Inc. | Orland, CA | PacifiCorp West (PACW) | 3.2 GWh | Feb 2016 | Dec 2025 | Solar |
| Bakersfield 111 | Bakersfield 111 LLC | Bakersfield, CA | PacifiCorp West (PACW) | 1.9 GWh | Jun 2015 | Dec 2024 | Solar |
| Roseburg Forest Products Biomass | Roseburg Forest Products | Weed, CA | PacifiCorp West (PACW) | 48.9 GWh | Nov 1989 | Dec 2025 | Wood/Wood Waste Solids |
| Fall Creek | PacifiCorp | Hornbrook, CA | PacifiCorp West (PACW) | 5.9 GWh | Aug 1903 | Dec 2025 | Water |
| Box Canyon Dam | Siskiyou Power Authority | Mount Shasta, CA | PacifiCorp West (PACW) | 22.5 GWh | May 1986 | Dec 2025 | Water |
| Slate Creek | Central Rivers Power US, LLC | Lakehead, CA | PacifiCorp West (PACW) | 12.2 GWh | Apr 1990 | Dec 2025 | Water |
| Stampede | U S Bureau of Reclamation | Truckee, CA | Nevada Power Company (NEVP) | 12.2 GWh | Dec 1987 | May 2026 | Water |
| Pine Tree Wind Power Project | Los Angeles Department of Water & Power | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 123.0 GWh | May 2009 | Dec 2025 | Wind |
| Castaic | Los Angeles Department of Water & Power | Castaic, CA | Los Angeles Department of Water and Power (LDWP) | 129.1 GWh | Dec 1971 | May 2026 | Water |
| Control Gorge | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 46.4 GWh | Mar 1952 | Dec 2025 | Water |
| Toyon Power Station | Toyon Landfill Gas Conversion, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 5.0 GWh | Dec 1985 | Dec 2025 | Landfill Gas |
| Cottonwood | Los Angeles Department of Water & Power | Lone Pine, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Oct 1908 | Dec 2025 | Water |
| Haiwee | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 11.0 GWh | Jun 1927 | Sep 2025 | Water |
| Harbor | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 86.6 GWh | Jun 1949 | May 2026 | Natural Gas |
| Haynes | Los Angeles Department of Water & Power | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 TWh | Aug 1962 | May 2026 | Natural Gas |
| Middle Gorge | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 48.0 GWh | Apr 1952 | Dec 2025 | Water |
| Big Pine Creek | Los Angeles Department of Water & Power | Big Pine, CA | Los Angeles Department of Water and Power (LDWP) | 10.5 GWh | Jun 1925 | Oct 2025 | Water |
| Wilmington Hydrogen Plant | Air Products & Chemicals Inc | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 179.0 GWh | Feb 1996 | May 2026 | Waste Heat |
| Foothill | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 37.1 GWh | Sep 1971 | Dec 2025 | Water |
| Los Angeles Refinery Wilmington | Phillips 66 - Los Angeles | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 365.4 GWh | Apr 1984 | Nov 2025 | Other Gas : 58.4% Natural Gas : 41.6% |
| Los Angeles Harbor College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 313.0 MWh | Sep 2010 | Dec 2025 | Solar |
| Metro Support Services Center Solar | Los Angeles County Metropolitan Transportation Authority | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 25.0 MWh | Mar 2005 | Oct 2025 | Solar |
| Occidental College Solar Project | Occidental College | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Jan 2013 | Dec 2025 | Solar |
| Maclay Solar Project | Los Angeles Department of Water & Power | Sylmar, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Mar 2017 | Dec 2024 | Solar |
| Pine Tree Solar Project | Los Angeles Department of Water & Power | Owenyo, CA | Los Angeles Department of Water and Power (LDWP) | 7.4 GWh | Feb 2013 | Dec 2025 | Solar |
| Adelanto Solar Project | Los Angeles Department of Water & Power | Adelanto, CA | Los Angeles Department of Water and Power (LDWP) | 4.1 GWh | May 2012 | Dec 2025 | Solar |
| Grayson | City of Glendale - (CA) | Glendale, CA | Los Angeles Department of Water and Power (LDWP) | 8.6 GWh | Nov 1953 | May 2026 | Natural Gas |
| Scattergood | Los Angeles Department of Water & Power | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 TWh | Nov 1958 | May 2026 | Natural Gas |
| Pleasant Valley Hydro | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 6.3 GWh | Jan 1958 | Sep 2025 | Water |
| Equilon Los Angeles Refining | Tesoro Refining and Marketing Company | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 239.9 GWh | Nov 1982 | Nov 2025 | Other Gas : 97.9% Natural Gas : 2.1% |
| San Francisquito 2 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 33.7 GWh | Jun 1920 | Dec 2025 | Water |
| San Francisquito 1 | Los Angeles Department of Water & Power | Saugus, CA | Los Angeles Department of Water and Power (LDWP) | 125.4 GWh | Mar 1917 | Dec 2025 | Water |
| UCLA So Campus Cogen Project | University of California-LA | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 235.0 GWh | Sep 1993 | May 2026 | Natural Gas |
| Magnolia Power Project | City of Burbank Water and Power - (CA) | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 TWh | Aug 2005 | May 2026 | Natural Gas |
| Lake One | City of Burbank Water and Power - (CA) | Burbank, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | May 2002 | Dec 2025 | Natural Gas |
| Valley (CA) | Los Angeles Department of Water & Power | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 TWh | Jul 2001 | May 2026 | Natural Gas |
| Upper Gorge | Los Angeles Department of Water & Power | Bishop, CA | Los Angeles Department of Water and Power (LDWP) | 51.9 GWh | May 1953 | Dec 2025 | Water |
| ATT Ventura Blvd | Bloom Energy | Sherman Oaks, CA | Los Angeles Department of Water and Power (LDWP) | 8.3 GWh | Oct 2019 | Dec 2025 | Natural Gas |
| IGS SBD1 | Altus Power America Management, LLC | Bloomington, CA | Los Angeles Department of Water and Power (LDWP) | 4.9 GWh | Jan 2023 | Dec 2025 | Solar |
| IGS SBD2 | Altus Power America Management, LLC | San Bernardino, CA | Los Angeles Department of Water and Power (LDWP) | 4.9 GWh | Jan 2023 | Dec 2025 | Solar |
| PAC Aviation Solar | PAC Aviation | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2024 | Dec 2025 | Solar |
| 20701 Plummer PV, LLC | Valta Energy | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.8 GWh | Jun 2022 | Dec 2025 | Solar |
| SSI West Riverside Landfill LLC | Standard Solar | Riverside, CA | Los Angeles Department of Water and Power (LDWP) | 4.1 GWh | Oct 2020 | Dec 2025 | Solar |
| 20333 Normandie PV, LLC | TRITEC Americas | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 5.3 GWh | Nov 2021 | Dec 2024 | Solar |
| 8500 Balboa PV, LLC | 8500 Balboa PV, LLC | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 3.3 GWh | Jan 2022 | Dec 2025 | Solar |
| Alta Sea | Signal Street Operating, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Nov 2023 | Dec 2025 | Solar |
| Prairie | Altus Power America Management, LLC | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Mar 2021 | Dec 2025 | Solar |
| City of Long Beach Airport Lot A & B | Solar DG CA Long Beach, LLC | Long Beach, CA | Los Angeles Department of Water and Power (LDWP) | 3.4 GWh | Jan 2024 | Dec 2025 | Solar |
| Pacific Aviation | Onyx Asset Services Group | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 2.9 GWh | Mar 2025 | Dec 2025 | Solar |
| Las Virgenes | Greenbacker Renewable Energy Corporation | Calabasas, CA | Los Angeles Department of Water and Power (LDWP) | 7.2 GWh | Nov 2020 | Dec 2025 | Solar |
| Francisco St. Solar | AES Distributed Energy | Torrance, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Nov 2018 | Dec 2025 | Solar |
| RE Barren Ridge 1 | RE Barren Ridge 1, LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 164.4 GWh | Jul 2016 | Dec 2025 | Solar |
| Springbok Solar Farm 2 | 63SU 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 397.1 GWh | Aug 2016 | Dec 2025 | Solar |
| Westmont 301 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 3.0 GWh | Oct 2017 | Dec 2025 | Solar |
| CSU Northridge Plant | California State University, Northridge | Northridge, CA | Los Angeles Department of Water and Power (LDWP) | 1.6 GWh | Nov 2001 | Dec 2025 | Solar |
| Westmont 401 | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 4.6 GWh | Oct 2017 | Dec 2025 | Solar |
| Central Utilities Plant LAX 2 | LAX Airport | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 31.8 GWh | Sep 2015 | May 2026 | Natural Gas |
| CBS Television City | Televison City Studios, LLC. | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 977.0 MWh | Jun 2013 | Dec 2024 | Solar |
| VA Sepulveda Ambulatory Care Center | VA Sepulveda Ambulatory Care Center | North Hills, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Sep 2014 | Dec 2025 | Solar |
| Pierce College | Los Angeles Community College District | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 143.0 MWh | Dec 2012 | Dec 2025 | Solar |
| Xebec 1 | AES Distributed Energy | Sun Valley, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2018 | Dec 2025 | Solar |
| Westmont 300B | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.3 GWh | Nov 2016 | Dec 2025 | Solar |
| CFW Solar X LLC - Vaughn | Valta Energy | San Fernando, CA | Los Angeles Department of Water and Power (LDWP) | 465.0 MWh | Nov 2018 | Dec 2025 | Solar |
| Little Rock Pham Solar | Terraform Arcadia | Palmdale, CA | Los Angeles Department of Water and Power (LDWP) | 9.0 GWh | Nov 2015 | Dec 2025 | Solar |
| Beacon Solar Plant Site 5 | Sune Beacon Site 5, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 84.8 GWh | Nov 2017 | May 2026 | Solar |
| Beacon Solar Plant Site 2 | Sune Beacon Site 2, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 107.0 GWh | Nov 2017 | May 2026 | Solar |
| Hecate Energy Beacon Solar 1 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 125.6 GWh | Mar 2017 | May 2026 | Solar |
| Hecate Energy Beacon Solar 3 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 118.9 GWh | Nov 2016 | May 2026 | Solar |
| Disney Prospect | Bloom Energy | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 8.0 GWh | Feb 2017 | Dec 2025 | Natural Gas |
| Hecate Energy Beacon Solar 4 | AES Distributed Energy | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 114.7 GWh | Nov 2016 | May 2026 | Solar |
| ATT Van Nyus | Bloom Energy | Van Nuys, CA | Los Angeles Department of Water and Power (LDWP) | 7.5 GWh | Jun 2017 | Dec 2025 | Natural Gas |
| Eland Solar & Storage Center, Phase 1 Hy | 68SF 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 717.3 GWh | Oct 2024 | May 2026 | Solar |
| Forever 21 Retail, Inc. | Mission Owner LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Jan 2015 | Dec 2024 | Solar |
| Valero Wilmington Cogeneration Plant | Valero Wilmington | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 211.3 GWh | Oct 2017 | Dec 2025 | Natural Gas |
| Valley Sanitary District WTP Solar | Tesla Inc. | Indio, CA | Los Angeles Department of Water and Power (LDWP) | 1.3 GWh | Nov 2016 | Mar 2025 | Solar |
| Hyperion Treatment Plant CHP Plant | Constellation New Energy Inc. | Playa del Rey, CA | Los Angeles Department of Water and Power (LDWP) | 155.9 GWh | Mar 2017 | May 2026 | Other Biomass Gas : 64.6% Natural Gas : 35.4% |
| Owens Valley Solar Project 11 | Los Angeles Department of Water & Power | Olancha, CA | Los Angeles Department of Water and Power (LDWP) | 2.7 GWh | Nov 2016 | Dec 2025 | Solar |
| Springbok 3 Solar Farm Hybrid | 64KT 8me LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 239.4 GWh | Jun 2019 | May 2026 | Solar |
| Colon PV | Los Angeles Department of Water & Power | Wilmington, CA | Los Angeles Department of Water and Power (LDWP) | 1.2 GWh | Nov 2015 | Dec 2024 | Solar |
| Eland Solar & Storage Center, Phase 2 Hy | 69SV 8me LLC | Mojave, CA | Los Angeles Department of Water and Power (LDWP) | 512.9 GWh | Jun 2025 | May 2026 | Solar |
| Westmont 300A | Altus Power America Management, LLC | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 5.2 GWh | Feb 2017 | Dec 2025 | Solar |
| Port of LA Solar FiT Project | Los Angeles Department of Water & Power | San Pedro, CA | Los Angeles Department of Water and Power (LDWP) | 1.4 GWh | Sep 2015 | Dec 2025 | Solar |
| Westmont 400A | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.5 GWh | Jun 2017 | Dec 2025 | Solar |
| Nordhoff Place | Los Angeles Department of Water & Power | Chatsworth, CA | Los Angeles Department of Water and Power (LDWP) | 1.1 GWh | Aug 2014 | Dec 2024 | Solar |
| Westmont 400B | Altus Power America Management, LLC | Los Angeles, CA | Los Angeles Department of Water and Power (LDWP) | 3.8 GWh | Jun 2017 | Dec 2025 | Solar |
| Springbok Solar Farm 1 | 62SK 8me, LLC | Cantil, CA | Los Angeles Department of Water and Power (LDWP) | 280.4 GWh | Jun 2016 | Dec 2025 | Solar |
| Citizens Imperial Solar | Citizens Enterprises Corporation | Calipatria, CA | Imperial Irrigation District (IID) | 60.6 GWh | Jul 2019 | May 2026 | Solar |
| SEPV Imperial Dixieland East | AES Distributed Energy | Imperial, CA | Imperial Irrigation District (IID) | 5.3 GWh | Nov 2016 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |