Gilead Sciences La Verne Rooftop Solar
1800 Wheeler Ave, La Verne, CA 91750Plant Summary Information
Gilead Sciences La Verne Rooftop Solar is ranked #655 out of 885 solar farms in California in terms of total annual net electricity generation.
Gilead Sciences La Verne Rooftop Solar generated 416.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Gilead Sciences La Verne Rooftop Solar |
|---|---|
| Utility Name | Gilead Sciences, Inc. - La Verne |
| Location | Los Angeles County, CA |
| Initial Operation Date | July 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 2.5 GWh |
| Annual Consumption | 8.9 k MMBtu |
| Ranked #10,325 out of 13,081 Power Plants Nationwide | |
| Ranked #5,257 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,326 out of 1,606 California Power Plants | |
| Ranked #655 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Gilead Sciences La Verne Rooftop Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilead Sciences La Verne Rooftop Solar.
Monthly Net Generation for Gilead Sciences La Verne Rooftop Solar
Monthly Plant Fuel Consumption for Gilead Sciences La Verne Rooftop Solar
Gilead Sciences La Verne Rooftop Solar Details
| Summary Information | |
|---|---|
| Plant Name | Gilead Sciences La Verne Rooftop Solar (65569) |
| Plant Address | 1800 Wheeler Ave, La Verne, CA 91750 |
| Utility | Gilead Sciences, Inc. - La Verne (64845) |
| Latitude, Longitude | 34.09623, -117.78187 |
| Generation Dates on File | Jul 2021 to Dec 2025 |
| Initial Operation Date | July 2021 |
| Annual Generation | 2.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Miscellaneous Manufacturing (339) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | Yes |
Generator GSRBA Details Operating July 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 1.1 MW |
| Summer Capacity | 1.1 MW |
| Winter Capacity | 1.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 2.1 |
|---|---|
| Maximum Charge Rate | 1.1 MW |
| Maximum Discharge Rate | 1.1 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.1 |
| Storage Enclosure Type | CS |
| System Peak Shaving | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Direct Support Plant Id | 65569 |
| Direct Support Gen Id | GSRSP |
| Support T D Asset | No |
Generator GSRSP Details Operating July 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.7 MW |
| Summer Capacity | 1.6 MW |
| Winter Capacity | 1.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2021 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | No |
|---|---|
| East West Fixed Tilt | Yes |
| DC Net Capacity | 2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2 MW |
| Virtual Net Metering Agreement | No |
Gilead Sciences La Verne Rooftop Solar Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5247 | Chambers 3 - Lewis County | Lowville, NY | 2.5 GWh |
| #5248 | Kettleman Solar Project | Lodi, CA | 2.5 GWh |
| #5249 | ISU Customer Hosted 1MW Solar Project | Ames, IA | 2.5 GWh |
| #5250 | 46 Meadowlands Parkway | Secaucus, NJ | 2.5 GWh |
| #5251 | Kings Park Solar II | Kings Park, NY | 2.5 GWh |
| #5252 | DG Florham Park Solar LLC | Florham Park, NJ | 2.5 GWh |
| #5253 | East Amwell | East Amwell Twp, NJ | 2.5 GWh |
| #5254 | Barnhill Road Solar, LLC | Elizabeth City, NC | 2.5 GWh |
| #5255 | Lafayette 2 - Internal Services Dept | Los Angeles, CA | 2.5 GWh |
| #5256 | GreenStruxure BBU004, LLC | Montebello, CA | 2.5 GWh |
| #5258 | Barton Solar Farm | Barton, VT | 2.5 GWh |
| #5259 | Ogema | Ogema, WI | 2.5 GWh |
| #5260 | Tranquillity ID | Tranquillity, CA | 2.5 GWh |
| #5261 | Division 1 | Lancaster, CA | 2.5 GWh |
| #5262 | Barrette Outdoor Living, Inc. | Egg Harbor City, NJ | 2.5 GWh |
| #5263 | The GSI Group LLC at Assumption | Assumption, IL | 2.5 GWh |
| #5264 | Bayer - Whippany, NJ | Whippany, NJ | 2.5 GWh |
| #5265 | ASA Gouverneur NY Solar I LLC | Richville, NY | 2.5 GWh |
| #5266 | City of Hayward WWTP | Hayward, CA | 10.5 GWh |
| #5267 | Sigmon Catawba Farm | Newton, NC | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilead Sciences La Verne Rooftop Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| 9150 Hermosa Solar GM | Rancho Cucamonga, CA | 2.8 GWh | 11.2 mi |
| Blacksand Generating Facility | Brea, CA | 30.5 GWh | 12 mi |
| Brea Expansion Plant | Brea, CA | 245.8 GWh | 11.8 mi |
| CamChino Leasing LLC | Chino, CA | 6.9 GWh | 9.4 mi |
| Chaffey College Rancho Cucamonga Campus | Rancho Cucamonga, CA | 6.9 GWh | 12.6 mi |
| Industry MetroLink PV 1 | Industry, CA | 1.4 GWh | 7.1 mi |
| Irwindale Brew Yard, LLC | Irwindale, CA | 517.0 MWh | 9.1 mi |
| Kaiser Ontario | Ontario, CA | 7.7 GWh | 10.8 mi |
| KP Ontario Vineyard Solar | Ontario, CA | 2.7 GWh | 10.8 mi |
| MM West Covina | West Covina, CA | 40.4 GWh | 8.3 mi |
| Oltmans SCE at Jurupa | Ontario, CA | 2.4 GWh | 11.1 mi |
| San Antonio Regional Hospital | Upland, CA | 12.7 GWh | 8.2 mi |
| San Antonio West Solar Rooftop | Chino, CA | 2.3 GWh | 11.4 mi |
| San Dimas | San Dimas, CA | 10.3 GWh | 2.3 mi |
| San Dimas Wash Generating Station | San Dimas, CA | 1.2 GWh | 2.3 mi |
| San Gabriel Hydro Project | Azusa, CA | 2.3 GWh | 8.6 mi |
| Terra Francesco | Ontario, CA | 2.2 GWh | 10.8 mi |
| Walnut Creek Energy Park | Industry, CA | 38.3 GWh | 11.1 mi |
| Walnut Unified School District Walnut HS | Walnut, CA | 327.0 MWh | 6.5 mi |
| Weymouth Solar Plant | La Verne, CA | 3.3 GWh | 0.9 mi |