Google Moffett Park Solar Project
237 Moffett Park Dr, Sunnyvale, CA 94089Plant Summary Information
Google Moffett Park Solar Project is ranked #646 out of 885 solar farms in California in terms of total annual net electricity generation.
Google Moffett Park Solar Project generated 377.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Google Moffett Park Solar Project |
|---|---|
| Utility Name | Google, Inc. |
| Location | Santa Clara County, CA |
| Initial Operation Date | March 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 2.5 GWh |
| Annual Consumption | 9.0 k MMBtu |
| Ranked #10,286 out of 13,081 Power Plants Nationwide | |
| Ranked #5,207 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,319 out of 1,606 California Power Plants | |
| Ranked #646 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Google Moffett Park Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Google Moffett Park Solar Project.
Monthly Net Generation for Google Moffett Park Solar Project
Monthly Plant Fuel Consumption for Google Moffett Park Solar Project
Google Moffett Park Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Google Moffett Park Solar Project (65568) |
| Plant Address | 237 Moffett Park Dr, Sunnyvale, CA 94089 |
| Utility | Google, Inc. (64846) |
| Latitude, Longitude | 37.40531, -122.0175 |
| Generation Dates on File | Mar 2021 to Dec 2025 |
| Initial Operation Date | March 2021 |
| Annual Generation | 2.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator GMSP1 Details Operating March 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.9 MW |
| Summer Capacity | 0.9 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | No |
|---|---|
| East West Fixed Tilt | Yes |
| DC Net Capacity | 1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1 MW |
| Virtual Net Metering Agreement | No |
Generator GMSP2 Details Operating March 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.4 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 165 |
| Tilt Angle | 3 |
| DC Net Capacity | 0.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.9 MW |
| Virtual Net Metering Agreement | No |
Generator GMSPB Details Operating March 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2021 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.1 |
|---|---|
| Maximum Charge Rate | 0.6 MW |
| Maximum Discharge Rate | 0.6 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 0.8 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| System Peak Shaving | Yes |
| Excess Wind And Solar Generation | P |
| DC Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65568 / 65568 |
| Direct Support Gen Id | GMSP1 / GMSP2 |
| Support T D Asset | No |
Google Moffett Park Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5197 | Broadway 3 - UCSB Lot 38 | Santa Barbara, CA | 2.6 GWh |
| #5198 | Tuttle | Tuttle, OK | 2.6 GWh |
| #5199 | Santa Fe Springs Rooftop Solar BLDG M | Santa Fe Springs, CA | 2.6 GWh |
| #5200 | WMATA - Naylor Rd. Metro | Temple Hills, MD | 2.6 GWh |
| #5201 | EAFB - North Base | Edwards Air Force Bas, CA | 2.6 GWh |
| #5202 | Park Meridian #1 | Riverside, CA | 2.6 GWh |
| #5203 | Walton 2 Solar Facility | Walton, KY | 2.6 GWh |
| #5204 | Pearl II | Batavia, NY | 2.6 GWh |
| #5205 | CCBC-Catonsville | Catonsville, MD | 2.6 GWh |
| #5206 | UMES (MD) - Princess Anne | Princess Anne, MD | 2.6 GWh |
| #5208 | Acushnet-Braley Road 1 | Freetown, MA | 2.6 GWh |
| #5209 | Windsor Floating Solar | Windsor, CA | 2.6 GWh |
| #5210 | Jefferson-Lewis BOCES Solar | Watertown, NY | 2.6 GWh |
| #5211 | Clif Bar Bakery of Twin Falls | Twin Falls, ID | 2.6 GWh |
| #5212 | East Chicago | East Chicago, IN | 2.6 GWh |
| #5213 | Citizens Agawam Landfill Solar | Agawam, MA | 2.6 GWh |
| #5214 | KP South Sacramento Hospital Solar | Sacramento, CA | 2.6 GWh |
| #5215 | Call Farms 3 | Batavia, NY | 2.5 GWh |
| #5216 | West Bridgewater AB CSG | West Bridgewater, MA | 2.5 GWh |
| #5217 | DG AMP Solar Piqua Staunton | Piqua, OH | 2.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Google Moffett Park Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Agnews Power Plant | San Jose, CA | 8.6 GWh | 5 mi |
| AGT000 Stevens Creek Fuel Cell | Santa Clara, CA | 17.4 GWh | 5.6 mi |
| Apple Campus 2 Fuel Cell | Cupertino, CA | 31.3 GWh | 5.2 mi |
| Apple Campus 2 PV | Cupertino, CA | 16.2 GWh | 5.2 mi |
| AT&T Holger | San Jose, CA | 1.1 GWh | 4.1 mi |
| CST001 McCarthy Fuel Cell | Milpitas, CA | 9.0 GWh | 5.5 mi |
| Donald Von Raesfeld Power Plant | Santa Clara, CA | 873.5 GWh | 4.2 mi |
| Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 38.7 GWh | 2 mi |
| EQX011 Duane Fuel Cell | Santa Clara, CA | 31.2 GWh | 3.9 mi |
| Gianera | Santa Clara, CA | 15.1 GWh | 2.7 mi |
| Intel Santa Clara | Santa Clara, CA | 6.9 GWh | 3.3 mi |
| JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 8.8 GWh | 0.6 mi |
| Juniper Networks Sunnyvale | Sunnyvale, CA | 3.9 GWh | 0.5 mi |
| Los Esteros Critical Energy Center | San Jose, CA | 167.2 GWh | 4.9 mi |
| Maxim | San Jose, CA | 6.9 GWh | 3.7 mi |
| Mission College Blvd. Fuel Cell | Santa Clara, CA | 36.3 GWh | 3.3 mi |
| SC 1 Data Center, Phase 2 | Santa Clara, CA | 392.0 MWh | 5.1 mi |
| SJ/SC WPCP | San Jose, CA | 69.4 GWh | 4.4 mi |
| Sunnyvale City of WPCP | Sunnyvale, CA | 7.5 GWh | 1 mi |
| Zero Waste Energy Development Co LLC | San Jose, CA | 1.8 GWh | 4 mi |