CA - Fresno County - Juvenile Hall

3333 E American Ave, Fresno, CA 93725

Plant Summary Information

CA - Fresno County - Juvenile Hall is ranked #795 out of 816 solar farms in California in terms of total annual net electricity generation.

CA - Fresno County - Juvenile Hall generated 552.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameCA - Fresno County - Juvenile Hall
Utility NameForefront Power, LLC
LocationFresno County, CA
Initial Operation DateMarch 2022
Last Update Dec 2024
Annual Generation 552.0 MWh
Annual Consumption 2.0 k MMBtu
Ranked #11,414 out of 12,288 Power Plants Nationwide
Ranked #6,028 out of 6,174 Solar Power Plants Nationwide
Ranked #1,532 out of 1,564 California Power Plants
Ranked #795 out of 816 California Solar Power Plants
Fuel Types Solar

Map of CA - Fresno County - Juvenile Hall

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA - Fresno County - Juvenile Hall.

Create Your Account Today

Monthly Net Generation for CA - Fresno County - Juvenile Hall

1k1k80080060060040040020020000Jul '22Jul '2220232023Jul '23Jul '2320242024Jul '24Jul '24
Download SVG
Download PNG
Download CSV

CA - Fresno County - Juvenile Hall Details

Summary Information
Plant NameCA - Fresno County - Juvenile Hall (65528)
Plant Address3333 E American Ave, Fresno, CA 93725
UtilityForefront Power, LLC (62856)
Latitude, Longitude36.66111, -119.72598
Generation Dates on FileMar 2022 to Dec 2024
Initial Operation DateMarch 2022
Annual Generation 552.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number22-540-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerPacific Gas & Electric Co. (14328) CA
Grid Voltage 21.00 kV
Energy StorageNo

Generator 17031 Details Operating March 2022

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity2.8 MW
Summer Capacity2.8 MW
Winter Capacity2.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateMarch 2022
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
East West Fixed TiltYes
Azimuth Angle180
DC Net Capacity3.8 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity3.8 MW
Virtual Net Metering AgreementNo

CA - Fresno County - Juvenile Hall Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6018NY Hermon 1040 County Rd 21Hermon, NY589.0 MWh
#6019FTF-PackingShedReedley, CA581.0 MWh
#6020Irwindale Brew Yard, LLCIrwindale, CA576.0 MWh
#6021DE Solar 657 Brigham RdGreensboro, NC580.0 MWh
#6022DSI Don SolarRenville, MN579.0 MWh
#6023IMPA Richmond Solar ParkRichmond, IN578.0 MWh
#6024Hopewell Valley High School HybridPennington, NJ570.0 MWh
#6025Hamlet Solar Energy StorageHamlet, NC550.0 MWh
#6026Arlington MicrogridArlington, WA532.0 MWh
#6027VA- US Foods- ManassasManassas, VA552.0 MWh
#6029Lightfoot Solar, LLCLuzerne, MI548.0 MWh
#60303100 Valleyview DriveColumbus, OH548.0 MWh
#6031USS Rosewood Solar LLC (CSG)Montevideo, MN544.0 MWh
#6032Dairy FarmAnson, ME542.0 MWh
#6033Division 2Lancaster, CA541.0 MWh
#6034Yolo County Solar ProjectWoodland, CA534.0 MWh
#6035Marshalltown Generating StationMarshalltown, IA3.4 TWh
#6036Grand Prix SolarMt. Kisco, NY527.0 MWh
#6037Villa Roma Rd #3 CSGDelaware, NY519.0 MWh
#6038M. G. Emmett J. Bean Federal CenterIndianapolis, IN519.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding CA - Fresno County - Juvenile Hall.

Plant NamePlant LocationAnnual GenerationDistance
Algonquin Power Sanger LLCSanger, CA10.0 GWh9.8 mi
Clovis East High SchoolClovis, CA1.5 GWh10.7 mi
Clovis High SchoolClovis, CA826.0 MWh11.1 mi
CSU Fresno Solar ProjectFresno, CA1.4 GWh10.3 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh11.8 mi
Fresno Community SolarFresno, CA15.4 GWh9.1 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh11.1 mi
Fresno Sunnyside High School HybridFresno, CA2.5 GWh5.1 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh8.4 mi
JD Foods - JD FoodsFresno, CA455.0 MWh3 mi
Kingsburg CogenKingsburg, CA11.0 GWh11.7 mi
La Joya Del SolFresno, CA1.4 GWh4.1 mi
Malaga Power LLCFresno, CA14.1 GWh2.1 mi
National RaisinFowler, CA4.8 GWh3.9 mi
OK Produce Fresno CarportFresno, CA3.6 GWh5.1 mi
POM Plant 1Del Rey, CA5.2 GWh7.8 mi
POM Plant 2Del Rey, CA3.5 GWh7.4 mi
Rio Bravo FresnoFresno, CA108.4 GWh1.9 mi
Saint Agnes Medical CenterFresno, CA26.2 GWh12.2 mi
SCCCD - Fresno Community CollegeFresno, CA3.8 GWh8.3 mi