PSREC/SIAD Solar
74 C Street, Herlong, CA 96113Plant Summary Information
PSREC/SIAD Solar is ranked #395 out of 849 solar farms in California in terms of total annual net electricity generation.
PSREC/SIAD Solar generated 905.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | PSREC/SIAD Solar |
|---|---|
| Utility Name | Plumas Sierra Rural Electric Coop |
| Location | Lassen County, CA |
| Initial Operation Date | September 2018 |
| Last Update | Dec 2024 |
| Annual Generation | 6.2 GWh |
| Annual Consumption | 21.6 k MMBtu |
| Ranked #7,562 out of 12,539 Power Plants Nationwide | |
| Ranked #2,871 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,027 out of 1,600 California Power Plants | |
| Ranked #395 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of PSREC/SIAD Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PSREC/SIAD Solar.
Monthly Net Generation for PSREC/SIAD Solar
PSREC/SIAD Solar Details
| Summary Information | |
|---|---|
| Plant Name | PSREC/SIAD Solar (63493) |
| Plant Address | 74 C Street, Herlong, CA 96113 |
| Utility | Plumas Sierra Rural Electric Coop (57353) |
| Latitude, Longitude | 40.15006, -120.12335 |
| Generation Dates on File | Jan 2019 to Dec 2024 |
| Initial Operation Date | September 2018 |
| Annual Generation | 6.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Plumas-Sierra Rural Elec Coop (15308) CA |
| Grid Voltage | 12.47 kV / 72.00 kV |
| Energy Storage | No |
Generator SIAD Details Operating September 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.5 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 2.4 MW |
| Winter Capacity | 1.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2018 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 3.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
PSREC/SIAD Solar Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2861 | Beetle Solar | Mooresboro, NC | 6.2 GWh |
| #2862 | Granite Peak Solar Plant | Milford, UT | 6.2 GWh |
| #2863 | Amazon SAN3 Solar Project | San Diego, CA | 6.1 GWh |
| #2864 | Milford Flat Solar Plant | Milford, UT | 6.2 GWh |
| #2865 | Railroad Solar Farm, LLC | Pembroke, NC | 6.2 GWh |
| #2866 | Shiloh Hwy Solar | Shiloh, NC | 6.2 GWh |
| #2867 | Wilkinson DeFore (Safari Energy) | Gordon, GA | 6.2 GWh |
| #2868 | Nutting Ridge Solar, LLC | Otisfield, ME | 6.2 GWh |
| #2869 | Kilroy Solar | San Diego, CA | 6.2 GWh |
| #2870 | Ventura Solar | Fillmore, CA | 6.2 GWh |
| #2872 | Holdrege Solar Center | Lincoln, NE | 6.2 GWh |
| #2873 | South Goshen Community Solar | Goshen, NY | 6.1 GWh |
| #2874 | Bellisario Solar 2 | Lapeer, NY | 6.2 GWh |
| #2875 | Belafonte | Calypso, NC | 6.2 GWh |
| #2876 | Syncarpha Freetown | Freetown, MA | 6.2 GWh |
| #2877 | Wheatfield | Sanborn, NY | 6.2 GWh |
| #2878 | Murdock Solar | Clayton, NC | 6.2 GWh |
| #2879 | Middlesex Apple Orchard Solar | North Brunswick, NJ | 6.1 GWh |
| #2880 | Catskill | Triangle, NY | 6.1 GWh |
| #2881 | Arba Solar Energy Storage | Hamlet, NC | 6.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PSREC/SIAD Solar.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Caribou 1 | Belden, CA | 221.0 GWh | 54.3 mi |
| Caribou 2 | Belden, CA | 364.4 GWh | 54.4 mi |
| Dodge Flat | Reno, NV | 547.3 GWh | 52 mi |
| Fish Springs | Reno, NV | 216.0 GWh | 9.4 mi |
| Haypress | Sierra City, CA | 17.6 GWh | 47.1 mi |
| High Sierra Cogeneration Plant | Susanville, CA | 36.7 GWh | 26 mi |
| HL Power | Wendel, CA | 204.8 GWh | 16.8 mi |
| HL Solar | Wendel, CA | 11.5 GWh | 17.1 mi |
| North Valley | Gerlach, NV | 202.8 GWh | 38.1 mi |
| San Emidio | Gerlach, NV | 83.8 GWh | 41.3 mi |
| Sierra Pacific Quincy Facility | Quincy, CA | 192.5 GWh | 44 mi |
| Stampede | Truckee, CA | 15.6 GWh | 47 mi |
| Steamboat II | Reno, NV | 62.7 GWh | 55.8 mi |
| Steamboat III | Reno, NV | 69.4 GWh | 55.9 mi |
| Tesla Reno GigaFactory | Sparks, NV | 8.7 GWh | 55.6 mi |
| Tracy | Sparks, NV | 4.0 TWh | 51.5 mi |
| Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 50.2 mi |
| Turquoise Nevada, LLC | Sparks, NV | 107.4 GWh | 50.9 mi |
| Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 52.6 mi |
| Western 102 Power Plant | McCarran, NV | 405.0 GWh | 52.1 mi |