PSREC/SIAD Solar
74 C Street, Herlong, CA 96113Plant Summary Information
PSREC/SIAD Solar is ranked #382 out of 818 solar farms in California in terms of total annual net electricity generation.
PSREC/SIAD Solar generated 905.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | PSREC/SIAD Solar |
---|---|
Utility Name | Plumas Sierra Rural Electric Coop |
Location | Lassen County, CA |
Initial Operation Date | September 2018 |
Last Update | Dec 2024 |
Annual Generation | 6.2 GWh |
Annual Consumption | 21.6 k MMBtu |
Ranked #7,482 out of 12,312 Power Plants Nationwide | |
Ranked #2,788 out of 6,191 Solar Power Plants Nationwide | |
Ranked #1,025 out of 1,568 California Power Plants | |
Ranked #382 out of 818 California Solar Power Plants | |
Fuel Types | Solar |
Map of PSREC/SIAD Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for PSREC/SIAD Solar.
Monthly Net Generation for PSREC/SIAD Solar
PSREC/SIAD Solar Details
Summary Information | |
---|---|
Plant Name | PSREC/SIAD Solar (63493) |
Plant Address | 74 C Street, Herlong, CA 96113 |
Utility | Plumas Sierra Rural Electric Coop (57353) |
Latitude, Longitude | 40.15006, -120.12335 |
Generation Dates on File | Jan 2019 to Dec 2024 |
Initial Operation Date | September 2018 |
Annual Generation | 6.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Plumas-Sierra Rural Elec Coop (15308) CA |
Grid Voltage | 12.47 kV / 72.00 kV |
Energy Storage | No |
Generator SIAD Details Operating September 2018
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2.5 MW |
Nameplate Power Factor | 0.8 |
Summer Capacity | 2.4 MW |
Winter Capacity | 1.6 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | September 2018 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
DC Net Capacity | 3.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
PSREC/SIAD Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2778 | Granite Peak Solar Plant | Milford, UT | 6.2 GWh |
#2779 | Milford Flat Solar Plant | Milford, UT | 6.2 GWh |
#2780 | Brick Church Solar | Brunswick, NY | 6.2 GWh |
#2781 | Railroad Solar Farm, LLC | Pembroke, NC | 6.2 GWh |
#2782 | Linden Hawk Rise Solar CSG | Linden, NJ | 6.2 GWh |
#2783 | Wilkinson DeFore | Gordon, GA | 6.2 GWh |
#2784 | Shiloh Hwy Solar | Shiloh, NC | 6.2 GWh |
#2785 | Nutting Ridge Solar, LLC | Otisfield, ME | 6.2 GWh |
#2786 | Kilroy Solar | San Diego, CA | 6.2 GWh |
#2787 | Ventura Solar | Fillmore, CA | 6.2 GWh |
#2789 | South Goshen Community Solar | Goshen, NY | 6.1 GWh |
#2790 | Bellisario Solar 2 | Lapeer, NY | 6.2 GWh |
#2791 | Belafonte | Calypso, NC | 6.2 GWh |
#2792 | Syncarpha Freetown | Freetown, MA | 6.2 GWh |
#2793 | Springfield Solar PV | Springfield, MA | 6.2 GWh |
#2794 | Murdock Solar | Clayton, NC | 6.2 GWh |
#2795 | Middlesex Apple Orchard Solar | North Brunswick, NJ | 6.1 GWh |
#2796 | Catskill | Triangle, NY | 6.1 GWh |
#2797 | Arba Solar Energy Storage | Hamlet, NC | 6.0 GWh |
#2798 | NY Lancaster Shisler Rd Site 2 Solar CSG | Lancaster, NY | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding PSREC/SIAD Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Caribou 1 | Belden, CA | 221.0 GWh | 54.3 mi |
Caribou 2 | Belden, CA | 346.3 GWh | 54.4 mi |
Dodge Flat | Reno, NV | 551.5 GWh | 52 mi |
Fish Springs | Reno, NV | 218.6 GWh | 9.4 mi |
Haypress | Sierra City, CA | 17.6 GWh | 47.1 mi |
High Sierra Cogeneration Plant | Susanville, CA | 36.7 GWh | 26 mi |
HL Power | Wendel, CA | 204.8 GWh | 16.8 mi |
HL Solar | Wendel, CA | 11.5 GWh | 17.1 mi |
North Valley | Gerlach, NV | 211.2 GWh | 38.1 mi |
San Emidio | Gerlach, NV | 83.8 GWh | 41.3 mi |
Sierra Pacific Quincy Facility | Quincy, CA | 192.5 GWh | 44 mi |
Stampede | Truckee, CA | 13.8 GWh | 47 mi |
Steamboat II | Reno, NV | 62.7 GWh | 55.8 mi |
Steamboat III | Reno, NV | 69.4 GWh | 55.9 mi |
Tesla Reno GigaFactory | Sparks, NV | 8.7 GWh | 55.6 mi |
Tracy | Sparks, NV | 4.2 TWh | 51.5 mi |
Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 50.2 mi |
Turquoise Nevada, LLC | Sparks, NV | 108.2 GWh | 50.9 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 52.6 mi |
Western 102 Power Plant | McCarran, NV | 450.7 GWh | 52.1 mi |