CA - Madera USD - Madera South HS
705 W Pecan Ave, Madera, CA 93637Plant Summary Information
CA - Madera USD - Madera South HS is ranked #648 out of 849 solar farms in California in terms of total annual net electricity generation.
CA - Madera USD - Madera South HS generated 325.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | CA - Madera USD - Madera South HS |
|---|---|
| Utility Name | Forefront Power, LLC |
| Location | Madera County, CA |
| Initial Operation Date | September 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 2.3 GWh |
| Annual Consumption | 8.2 k MMBtu |
| Ranked #10,096 out of 12,539 Power Plants Nationwide | |
| Ranked #4,917 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,364 out of 1,600 California Power Plants | |
| Ranked #648 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of CA - Madera USD - Madera South HS
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA - Madera USD - Madera South HS.
Monthly Net Generation for CA - Madera USD - Madera South HS
CA - Madera USD - Madera South HS Details
| Summary Information | |
|---|---|
| Plant Name | CA - Madera USD - Madera South HS (65615) |
| Plant Address | 705 W Pecan Ave, Madera, CA 93637 |
| Utility | Forefront Power, LLC (62856) |
| Latitude, Longitude | 36.95, -120.05 |
| Generation Dates on File | Sep 2023 to Dec 2024 |
| Initial Operation Date | September 2023 |
| Annual Generation | 2.3 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 21.00 kV |
| Energy Storage | No |
Generator 19009 Details Operating September 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.2 MW |
| Summer Capacity | 1.2 MW |
| Winter Capacity | 1.2 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 7 |
| DC Net Capacity | 1.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.5 MW |
| Virtual Net Metering Agreement | No |
CA - Madera USD - Madera South HS Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4907 | Whately Solar | Whately, MA | 2.3 GWh |
| #4908 | Washington St Community Solar Farm #4 | Ogden, NY | 2.3 GWh |
| #4909 | 456 Lower | Minisink, NY | 2.3 GWh |
| #4910 | Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.3 GWh |
| #4911 | Buidling L | Santa Fe Springs, CA | 2.3 GWh |
| #4912 | Sutter Santa Rosa Solar | Santa Rosa, CA | 2.3 GWh |
| #4913 | COU Solar I, LLC | Lisbon, NY | 2.3 GWh |
| #4914 | County of San Diego SBRC | Chula Vista, CA | 2.3 GWh |
| #4915 | Chatham Landfill | Chatham, MA | 2.3 GWh |
| #4916 | Munson-DS&O | Junction City, KS | 2.3 GWh |
| #4918 | 5601 Westside CDG | North Bergen, NJ | 2.3 GWh |
| #4919 | Arrache 4006 | Palmdale, CA | 2.3 GWh |
| #4920 | Sue Cleveland High School | Rio Rancho, NM | 2.3 GWh |
| #4921 | Hewlett-Packard (HP) - Andover, MA | Andover, MA | 2.3 GWh |
| #4922 | Acushnet-Braley Road 1 | Freetown, MA | 2.3 GWh |
| #4923 | Building F | Santa Fe Springs, CA | 2.3 GWh |
| #4924 | Americus | Emporia, KS | 2.3 GWh |
| #4925 | Rockland Solar CSG | Rockland, MA | 2.3 GWh |
| #4926 | CREE | Racine, WI | 2.3 GWh |
| #4927 | Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA - Madera USD - Madera South HS.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Avenue 26 Solar | Chowchilla, CA | 4.5 GWh | 14.1 mi |
| Borden Solar Farm | Madera, CA | 121.0 GWh | 5 mi |
| Chowchilla II | Chowchilla, CA | 16.5 GWh | 15.4 mi |
| City of Madera WWTP | Madera, CA | 1.4 GWh | 6 mi |
| Clovis North High School | Fresno, CA | 1.5 GWh | 17.8 mi |
| Costa View Farms | Madera, CA | 5.1 GWh | 14.5 mi |
| DGS Central California Womens Facility | Chowchilla, CA | 3.8 GWh | 11.1 mi |
| DGS Valley State Prison | Chowchilla, CA | 3.9 GWh | 11.9 mi |
| Five H Farms Solar Array | Merced, CA | 1.3 GWh | 17.8 mi |
| Fresno Bullard High School Hybrid | Fresno, CA | 2.1 GWh | 16.1 mi |
| Fresno Hoover High School Hybrid | Fresno, CA | 2.0 GWh | 17.9 mi |
| Madera 1 PV | Madera, CA | 3.6 GWh | 9.8 mi |
| Madera Community Hospital | Madera, CA | 72.0 MWh | 0.6 mi |
| Pacific Ethanol Madera Solar Array | Madera, CA | 1.6 GWh | 4.9 mi |
| Saint Agnes Medical Center | Fresno, CA | 33.0 GWh | 17.6 mi |
| SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh | 18.1 mi |
| Sealed Air Madera Solar Project | Madera, CA | 6.1 GWh | 0.5 mi |
| Site 980 65 | Madera, CA | 4.9 GWh | 11.1 mi |
| Wonderful Firebaugh | Firebaugh, CA | 10.0 GWh | 16.9 mi |
| Wonderful Orchards - New Columbia | Firebaugh, CA | 9.7 GWh | 17.1 mi |