Lerdo Detention Facility - Solar 2, 3
17695 Industrial Farm Rd, Bakersfield, CA 93308Plant Summary Information
Lerdo Detention Facility - Solar 2, 3 is ranked #713 out of 885 solar farms in California in terms of total annual net electricity generation.
Lerdo Detention Facility - Solar 2, 3 generated 99.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Lerdo Detention Facility - Solar 2, 3 |
|---|---|
| Utility Name | County of Kern - (CA) |
| Location | Kern County, CA |
| Initial Operation Date | November 2021 |
| Last Update | Dec 2025 |
| Annual Generation | 2.0 GWh |
| Annual Consumption | 8.1 k MMBtu |
| Ranked #10,860 out of 13,081 Power Plants Nationwide | |
| Ranked #5,732 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,392 out of 1,606 California Power Plants | |
| Ranked #713 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
County of Kern (2021 to 2024) County of Kern - (CA) (2025 to 2025) |
Map of Lerdo Detention Facility - Solar 2, 3
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Lerdo Detention Facility - Solar 2, 3.
Monthly Net Generation for Lerdo Detention Facility - Solar 2, 3
Monthly Plant Fuel Consumption for Lerdo Detention Facility - Solar 2, 3
Lerdo Detention Facility - Solar 2, 3 Details
| Summary Information | |
|---|---|
| Plant Name | Lerdo Detention Facility - Solar 2, 3 (65464) |
| Plant Address | 17695 Industrial Farm Rd, Bakersfield, CA 93308 |
| Utility | County of Kern - (CA) (64731) |
| Latitude, Longitude | 35.51094, -119.10994 |
| Generation Dates on File | Nov 2021 to Dec 2025 |
| Initial Operation Date | November 2021 |
| Annual Generation | 2.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator LDF2 Details Operating November 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3.1 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 2.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 3.4 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 2.4 MW |
| Virtual Net Metering Agreement | No |
Generator LDF3 Details Operating November 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 2.1 MW |
| Summer Capacity | 2.1 MW |
| Winter Capacity | 1.7 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2021 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 3.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.3 MW |
| Virtual Net Metering Agreement | No |
Lerdo Detention Facility - Solar 2, 3 Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5722 | Woburn | Woburn, MA | 2.0 GWh |
| #5723 | Agawam Solar | Agawam, MA | 2.0 GWh |
| #5724 | Palo Verde College | Blythe, CA | 2.0 GWh |
| #5725 | Plympton Lake Street Solar | Plympton, MA | 2.0 GWh |
| #5726 | Town of Foxborough - Landfill (SREC II) | Foxborough, MA | 2.0 GWh |
| #5727 | Oneida - South | Whitestown, NY | 2.0 GWh |
| #5728 | USS Big Lake 1 Solar CSG | Big Lake, MN | 2.0 GWh |
| #5729 | SCCCD - Clovis Community College | Fresno, CA | 2.0 GWh |
| #5730 | Brooten CSG1, LLC | Brooten, MN | 2.0 GWh |
| #5731 | Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh |
| #5733 | Mercer Mall | Lawrenceville, NJ | 2.0 GWh |
| #5734 | USS B&B Solar LLC CSG | Morgan, MN | 2.0 GWh |
| #5735 | Building G | Santa Fe Springs, CA | 2.0 GWh |
| #5736 | SolarClub 30 (CSG) | Eden Valley, MN | 2.0 GWh |
| #5737 | Westminster Renewables, LLC CSG | Westminster, MA | 2.0 GWh |
| #5738 | Bloomfield Municipal Utilities Solar | Bloomfield, IA | 2.0 GWh |
| #5739 | Primrose Solar, LLC | Mankato, MN | 2.0 GWh |
| #5740 | USS Horne South Solar LLC CSG | Felton, MN | 2.0 GWh |
| #5741 | USS Norelius Solar CSG | North Branch, MN | 2.0 GWh |
| #5742 | Port Reading 8 Solar | Carteret, NJ | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Lerdo Detention Facility - Solar 2, 3.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon Bakersfield 1 Solar Project | Bakersfield, CA | 8.3 GWh | 5.5 mi |
| Badger Creek Limited | Bakersfield, CA | 4.5 GWh | 4.9 mi |
| Broadway 4 - Target Shafter | Shafter, CA | 2.8 GWh | 5.5 mi |
| Calibrant Bakersfield LLC | Bakersfield, CA | 3.9 GWh | 4.8 mi |
| Double C Generation Limited Partnership | Bakersfield, CA | 5.6 GWh | 3.7 mi |
| E&B Resources | Bakersfield, CA | 2.0 GWh | 3.2 mi |
| Frontier HS Solar Project | Bakersfield, CA | 2.3 GWh | 6.8 mi |
| High Sierra Limited | Bakersfield, CA | 5.6 GWh | 4.5 mi |
| Improvement Dst No. 4 | Bakersfield, CA | 12.0 MWh | 8.5 mi |
| Kern Front Limited | Bakersfield, CA | 5.4 GWh | 3.9 mi |
| Kern River Cogeneration | Bakersfield, CA | 100.3 GWh | 8.1 mi |
| Kern River Eastridge Cogen | Bakersfield, CA | 217.5 GWh | 9.7 mi |
| Live Oak Limited | Bakersfield, CA | 20.1 GWh | 4.9 mi |
| North Kern 1 | Shafter, CA | 6.9 GWh | 4.4 mi |
| North Kern 2 | City of Shafter, CA | 6.1 GWh | 3.9 mi |
| North Kern 3 | Bakersfield, CA | 13.6 GWh | 5.2 mi |
| Shafter Solar LLC | Bakersfield, CA | 41.2 GWh | 8.2 mi |
| Sun Pacific - Lerdo | Shafter, CA | 6.0 GWh | 2.1 mi |
| Sycamore Cogeneration | Bakersfield, CA | 148.2 GWh | 8.1 mi |
| Western Power & Steam Inc | Bakersfield, CA | 17.7 GWh | 7.3 mi |