Directory of Power Plants in California
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Arica Solar | Arica Solar, LLC | Desert Center, CA | California Independent System Operator (CISO) | 740.4 GWh | Feb 2024 | May 2026 | Solar |
| Victory Pass | Victory Pass I, LLC | Desert Center, CA | California Independent System Operator (CISO) | 568.8 GWh | Feb 2024 | May 2026 | Solar |
| Canal Energy S23, LLC | Canal Energy S23, LLC | Hanford, CA | California Independent System Operator (CISO) | 10.0 GWh | Nov 2021 | Dec 2025 | Solar |
| Oberon II Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 580.5 GWh | Aug 2023 | May 2026 | Solar |
| Oberon Solar Project | Intersect USA, LLC | Desert Center, CA | California Independent System Operator (CISO) | 570.1 GWh | Aug 2023 | May 2026 | Solar |
| POM Beverage Solar | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 4.4 GWh | Jun 2021 | Dec 2025 | Solar |
| POM Juice Solar | Wonderful Renewable Energy, LLC. | Fresno, CA | California Independent System Operator (CISO) | 3.6 GWh | Jun 2021 | Dec 2025 | Solar |
| Edwards Sanborn S4 | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 93.0 GWh | Oct 2022 | May 2026 | Solar |
| CD4 | CD4 | Mammoth Lakes, CA | California Independent System Operator (CISO) | 236.3 GWh | Jun 2022 | Dec 2025 | Geothermal |
| Clovis High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.6 GWh | Mar 2018 | Dec 2025 | Solar |
| IGS OXR1 | Greenbacker Renewable Energy Corporation | Oxnard, CA | California Independent System Operator (CISO) | 9.3 GWh | Jul 2024 | Dec 2025 | Solar |
| Baldy Mesa Solar & Storage | AES Clean Energy | Adelanto, CA | California Independent System Operator (CISO) | 313.3 GWh | Apr 2024 | May 2026 | Solar |
| BCE Los Alamitos 1 | Bright Canyon Energy | Los Alamitos, CA | California Independent System Operator (CISO) | 19.1 GWh | Jul 2023 | Dec 2024 | Solar |
| CA Manteca 730 Spreckels Ave | Catalyze Manteca 730 Spreckels Avenue Microgrid LLC | Manteca, CA | California Independent System Operator (CISO) | 100.0 MWh | Aug 2024 | Dec 2025 | Solar |
| West Tambo Clean Power II | West Tambo Clean Power II | Livingston, CA | California Independent System Operator (CISO) | 4.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Henry Miller RD | Henry Miller Reclamation District | Dos Palos, CA | California Independent System Operator (CISO) | 3.0 GWh | Sep 2018 | Dec 2025 | Solar |
| CA Jurupa Valley 3251 De Forest Circle | Catalyze Mira Loma 3251 De Forest Circle Microgrid LLC | Jurupa Valley, CA | California Independent System Operator (CISO) | 8.5 GWh | Mar 2024 | Dec 2025 | Solar |
| San Manuel Central Plant Cogens | Yuhaaviatam of San Manuel Nation | Highland, CA | California Independent System Operator (CISO) | 18.0 GWh | May 2021 | Dec 2025 | Natural Gas |
| Clovis North High School | Tesla Inc. | Fresno, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2017 | Dec 2025 | Solar |
| Clovis East High School | Tesla Inc. | Clovis, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2018 | Dec 2025 | Solar |
| Resurgence Solar II | Resurgence Solar II | Boron, CA | California Independent System Operator (CISO) | 133.2 GWh | Jul 2023 | May 2026 | Solar |
| Taylor Farms - Schilling Place | Bloom Energy | Salinas, CA | California Independent System Operator (CISO) | 8.1 GWh | Jun 2019 | Dec 2025 | Natural Gas |
| Redlands Community Hospital | Bloom Energy | Redlands, CA | California Independent System Operator (CISO) | 8.6 GWh | May 2021 | Dec 2025 | Natural Gas |
| Anheuser Busch - Fairfield | Bloom Energy | Fairfield, CA | California Independent System Operator (CISO) | 20.9 GWh | Nov 2022 | Dec 2025 | Natural Gas |
| Wonderful Kings | Wonderful Renewable Energy, LLC. | Lost Hills, CA | California Independent System Operator (CISO) | 7.6 GWh | Jul 2022 | Dec 2025 | Solar |
| Wonderful Firebaugh | Wonderful Renewable Energy, LLC. | Firebaugh, CA | California Independent System Operator (CISO) | 10.2 GWh | Jul 2022 | Dec 2025 | Solar |
| Proxima | Proxima Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 464.5 GWh | Mar 2024 | May 2026 | Solar |
| Lake Elsinore Canopies - Lakeside HS | Standard Solar | Lake Elsinore, CA | California Independent System Operator (CISO) | 2.0 GWh | Feb 2022 | Dec 2025 | Solar |
| POM Plant 2 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 3.4 GWh | Nov 2021 | Dec 2025 | Solar |
| POM Plant 1 | Wonderful Renewable Energy, LLC. | Del Rey, CA | California Independent System Operator (CISO) | 5.1 GWh | Nov 2021 | Dec 2025 | Solar |
| Pivot Energy PPA 22 | Pivot Energy | Visalia, CA | California Independent System Operator (CISO) | 2.2 GWh | Sep 2024 | Dec 2025 | Solar |
| Avalon Dairy | Renewable Solar, Inc | Wasco, CA | California Independent System Operator (CISO) | 792.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Sutter Home Winery TCC | REC SHW, LLC | Paso Robles, CA | California Independent System Operator (CISO) | 1.7 GWh | Apr 2024 | Dec 2025 | Solar |
| Sutter Home Winery GIR | Westbound Solar 3, LLC | American Canyon, CA | California Independent System Operator (CISO) | 1.9 GWh | Jul 2023 | Dec 2025 | Solar |
| Kern Del Oro | REC KDO, LLC | Bakersfield, CA | California Independent System Operator (CISO) | 1.5 GWh | Nov 2024 | Dec 2025 | Solar |
| Central San | REC CSD, LLC | Martinez, CA | California Independent System Operator (CISO) | 3.0 GWh | Dec 2024 | Dec 2025 | Solar |
| North Kern 3 | Madison Energy Investments LLC | Bakersfield, CA | California Independent System Operator (CISO) | 13.6 GWh | Nov 2023 | Dec 2025 | Solar |
| Community Solar Utica 1, LLC | AETS OpCo Holdings LLC | Kettleman, CA | California Independent System Operator (CISO) | 2.3 GWh | Feb 2025 | Dec 2025 | Solar |
| Tipton 2 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Tipton 1 - (CA) | CleanCapital Holdings | Tipton, CA | California Independent System Operator (CISO) | 167.0 MWh | Nov 2024 | Dec 2024 | Solar |
| Blue Moon Farms | Bravo REC Management LLC | Tipton, CA | California Independent System Operator (CISO) | 2.0 GWh | Jul 2024 | Dec 2025 | Solar |
| Oaks HOA | Onyx Asset Services Group | Ione, CA | California Independent System Operator (CISO) | 1.7 GWh | Mar 2025 | Dec 2025 | Solar |
| JD Foods - JD Foods | Barrier Solar Inc | Fresno, CA | California Independent System Operator (CISO) | 2.5 GWh | Sep 2020 | Dec 2025 | Solar |
| Open Sky Dairy | Renewable Solar, Inc | Riverdale, CA | California Independent System Operator (CISO) | 418.8 MWh | Jun 2024 | Dec 2025 | Solar |
| Sutter Santa Rosa Solar | Sutter Santa Rosa Solar LLC | Santa Rosa, CA | California Independent System Operator (CISO) | 2.1 GWh | Aug 2019 | Dec 2025 | Solar |
| Wheeler Ridge 2 | Madison Energy Investments LLC | Arvin, CA | California Independent System Operator (CISO) | 13.8 GWh | Oct 2023 | Dec 2025 | Solar |
| CA OXNARD 2600 Sakioka Dr | Catalyze Oxnard 2600 Sakioka Drive Microgrid, LLC | Oxnard, CA | California Independent System Operator (CISO) | 2.7 GWh | Jun 2025 | Dec 2025 | Solar |
| Civic Center East | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 2020 | Dec 2025 | Solar |
| Bob Wiley Detention Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.8 GWh | Aug 2020 | Dec 2025 | Solar |
| Tulare Akers Professional Center | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.6 GWh | Oct 2019 | Dec 2025 | Solar |
| Government Plaza Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 1.8 GWh | Oct 2020 | Dec 2025 | Solar |
| North Juvenile Detention Center Solar | SoCore Energy LLC | Visalia, CA | California Independent System Operator (CISO) | 2.3 GWh | Oct 2019 | Dec 2025 | Solar |
| Sun Pacific - Lerdo | JKB Energy | Shafter, CA | California Independent System Operator (CISO) | 6.0 GWh | Sep 2020 | Dec 2025 | Solar |
| Lakeside Pipeline | Maas Energy Works | Hanford, CA | California Independent System Operator (CISO) | 8.3 GWh | Jun 2023 | Dec 2025 | Solar |
| Legoland CA Phase I | Onyx Asset Services Group | Carlsbad, CA | California Independent System Operator (CISO) | 1.4 GWh | May 2025 | Dec 2025 | Solar |
| Amazon - SAN5 | Onyx Asset Services Group | San Diego, CA | California Independent System Operator (CISO) | 530.0 MWh | Oct 2025 | Dec 2025 | Solar |
| Las Positas College | Chabot Las Positas Community College District | Livermore, CA | California Independent System Operator (CISO) | 1.7 GWh | Jul 2018 | Dec 2025 | Solar |
| Palm Springs DAC PV | Palm Springs USD | Palm Springs, CA | California Independent System Operator (CISO) | 1.3 GWh | Mar 2021 | Dec 2025 | Solar |
| GreenStruxure BBU004, LLC | ClearGen LLC | Montebello, CA | California Independent System Operator (CISO) | 2.5 GWh | Nov 2023 | Dec 2025 | Solar |
| KP Ontario Vineyard Solar | KP Ontario Vineyard O.P. Surgicenter B Solar LLC | Ontario, CA | California Independent System Operator (CISO) | 2.7 GWh | Nov 2024 | Dec 2025 | Solar |
| Amazon Visalia (FAT2) | Madison Energy Investments LLC | Visalia, CA | California Independent System Operator (CISO) | 3.7 GWh | Feb 2023 | Dec 2025 | Solar |
| Sutter Home Winery Westside | REC SHW, LLC | Lodi, CA | California Independent System Operator (CISO) | 295.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Thermo Fisher Pleasanton | TotalEnergies Renewables USA LLC | Pleasanton, CA | California Independent System Operator (CISO) | 1.5 GWh | Jun 2025 | Dec 2025 | Solar |
| South County Detention Center Solar | SoCore Energy LLC | Porterville, CA | California Independent System Operator (CISO) | 2.4 GWh | Oct 2019 | Dec 2025 | Solar |
| AVI Bakersfield | Anthony Vineyards, Inc. | Bakersfield, CA | California Independent System Operator (CISO) | 2.8 GWh | May 2022 | Dec 2025 | Solar |
| Visalia - (CA) | CleanCapital Holdings | Visalia, CA | California Independent System Operator (CISO) | 3.2 GWh | May 2025 | Dec 2025 | Solar |
| P66 Rodeo Solar | P66 Rodeo Solar | Rodeo, CA | California Independent System Operator (CISO) | 58.0 GWh | Mar 2023 | May 2026 | Solar |
| Angela Solar Project | Angiola East LLC | Alpaugh, CA | California Independent System Operator (CISO) | 11.0 GWh | - | May 2026 | Solar |
| Edwards Sanborn 1C | Terra-Gen Operating Co-Hybrid | Mojave, CA | California Independent System Operator (CISO) | 205.9 GWh | Oct 2025 | May 2026 | Solar |
| Google Bayhill Solar PV and Microgrid | Google, Inc. | San Bruno, CA | California Independent System Operator (CISO) | 651.0 MWh | Mar 2024 | Dec 2025 | Solar |
| Tracy 18 - SLCVA418 | Prologis Logistics Services Incorporated | Tracy, CA | California Independent System Operator (CISO) | 182.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Chatsworth Industrial Center 1-SLLAX601 | Prologis Logistics Services Incorporated | Chatsworth, CA | California Independent System Operator (CISO) | 132.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Superior Almond Hulling | Renewable Solar, Inc | Cantua Creek, CA | California Independent System Operator (CISO) | 472.0 MWh | Aug 2024 | Dec 2025 | Solar |
| Lone Oak | Bravo REC Management LLC | Hanford, CA | California Independent System Operator (CISO) | 6.0 GWh | Feb 2023 | Dec 2025 | Solar |
| Kern Sunset 1886-WD | Standard Solar | Bakersfield, CA | California Independent System Operator (CISO) | 4.5 GWh | Oct 2024 | Dec 2025 | Solar |
| Terry 1818-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 10.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Nachtigall 1836-WD | Standard Solar | Wasco, CA | California Independent System Operator (CISO) | 11.0 GWh | Nov 2024 | Dec 2025 | Solar |
| Highway 43 1887-WD | Standard Solar | Shafter, CA | California Independent System Operator (CISO) | 3.3 GWh | Oct 2024 | Dec 2025 | Solar |
| Bishop Ranch BR 1-X | Bollinger Canyon Road BR 1-X Solar Project 2020 | San Ramon, CA | California Independent System Operator (CISO) | 1.6 GWh | Feb 2022 | Dec 2024 | Solar |
| Rio Vista Solar | Rio Vista Executive Boat & RV Storage, LLC | Rio Vista, CA | California Independent System Operator (CISO) | 3.1 GWh | Mar 2025 | Dec 2025 | Solar |
| River Ranch Dairy | Renewable Solar, Inc | Hanford, CA | California Independent System Operator (CISO) | 995.0 MWh | May 2024 | Dec 2025 | Solar |
| Zonneveld Oak Grove | Renewable Solar, Inc | Laton, CA | California Independent System Operator (CISO) | 388.0 MWh | May 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1281 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 34.5 GWh | Nov 2024 | Dec 2025 | Solar |
| RB Inyokern Solar WDAT 1203 (CSG) | Dimension Energy LLC | Ridgecrest, CA | California Independent System Operator (CISO) | 58.3 GWh | Nov 2024 | Dec 2025 | Solar |
| Rosamond South 1 | Golden Fields Solar IV, LLC | Rosamond, CA | California Independent System Operator (CISO) | 324.0 GWh | Jul 2025 | May 2026 | Solar |
| Grossmont College | Forefront Power, LLC | El Cajon, CA | California Independent System Operator (CISO) | 4.4 GWh | Feb 2023 | Dec 2024 | Solar |
| Double J Dairy Array | Bravo REC Management LLC | Visalia, CA | California Independent System Operator (CISO) | 8.5 GWh | Oct 2023 | Dec 2025 | Solar |
| Tejon Castac Water District Solar | CTMW Solar, LLC | Arvin, CA | California Independent System Operator (CISO) | 2.5 GWh | Apr 2024 | Dec 2024 | Solar |
| Foster Clean Power A | Foster Clean Power A, LLC | Arcata, CA | California Independent System Operator (CISO) | 846.0 MWh | Sep 2025 | Dec 2025 | Solar |
| Dos Palos Clean Power | Dos Palos Clean Power LLC | Dos Palos, CA | California Independent System Operator (CISO) | 5.7 GWh | Feb 2025 | Dec 2025 | Solar |
| Bishop Ranch - BR 15-DD | Alcosta Boulevard BR 15-DD Solar Project 2020, LLC | San Ramon, CA | California Independent System Operator (CISO) | 62.0 MWh | Feb 2025 | May 2025 | Solar |
| Mesa Wind Repower | Mesa Wind Repower | Whitewater, CA | California Independent System Operator (CISO) | 80.1 GWh | May 2024 | Dec 2024 | Wind |
| Cabrillo College | Forefront Power, LLC | Aptos, CA | California Independent System Operator (CISO) | 4.3 GWh | Nov 2023 | Dec 2024 | Solar |
| Amazon SAN3 Solar Project | Solar Star Prime 4 LLC | San Diego, CA | California Independent System Operator (CISO) | 6.1 GWh | Apr 2024 | Dec 2024 | Solar |
| Paulsell | Crow Creek Solar, LLC | Crows Landing, CA | California Independent System Operator (CISO) | 47.5 GWh | May 2024 | May 2026 | Solar |
| Harris Farms Solar Facility | Harris Farms Inc | Coalinga, CA | California Independent System Operator (CISO) | 3.2 GWh | Feb 2024 | Dec 2025 | Solar |
| North Kern 1 | Madison Energy Investments LLC | Shafter, CA | California Independent System Operator (CISO) | 6.9 GWh | May 2023 | Dec 2025 | Solar |
| North Kern 2 | Madison Energy Investments LLC | City of Shafter, CA | California Independent System Operator (CISO) | 6.1 GWh | Jun 2024 | Dec 2025 | Solar |
| Mountain View Ind Park 1-sline001 | Prologis Logistics Services Incorporated | Fontana, CA | California Independent System Operator (CISO) | 371.0 MWh | Aug 2023 | Dec 2025 | Solar |
| Allied Potato | Renewable Solar, Inc | Bakersfield, CA | California Independent System Operator (CISO) | 309.9 MWh | Apr 2025 | Dec 2025 | Solar |
Browse Power Plants By California Counties
Figures are based on December 2025 generation numbers.| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| Glenn County, CA | # 55 | 2 | 12.1 GWh |
| Mendocino County, CA | # 54 | 6 | 12.3 GWh |
| Marin County, CA | # 53 | 3 | 28.1 GWh |
| Sierra County, CA | # 52 | 3 | 29.3 GWh |
| Napa County, CA | # 51 | 11 | 51.2 GWh |
| Tehama County, CA | # 50 | 7 | 52.9 GWh |
| Santa Cruz County, CA | # 49 | 6 | 60.8 GWh |
| Siskiyou County, CA | # 48 | 8 | 77.3 GWh |
| San Francisco County, CA | # 47 | 10 | 79.8 GWh |
| San Mateo County, CA | # 46 | 11 | 131.4 GWh |
| Yolo County, CA | # 45 | 15 | 196.2 GWh |
| Nevada County, CA | # 44 | 12 | 225.0 GWh |
| San Benito County, CA | # 43 | 6 | 257.6 GWh |
| Mariposa County, CA | # 42 | 2 | 272.7 GWh |
| Santa Barbara County, CA | # 41 | 18 | 300.1 GWh |
| Lassen County, CA | # 40 | 9 | 337.3 GWh |
| Humboldt County, CA | # 39 | 10 | 442.1 GWh |
| Merced County, CA | # 38 | 33 | 484.8 GWh |
| Trinity County, CA | # 37 | 5 | 488.3 GWh |
| Calaveras County, CA | # 36 | 6 | 502.3 GWh |
| Mono County, CA | # 35 | 9 | 597.8 GWh |
| Amador County, CA | # 34 | 8 | 610.5 GWh |
| Ventura County, CA | # 33 | 33 | 672.3 GWh |
| Lake County, CA | # 32 | 10 | 896.8 GWh |
| Inyo County, CA | # 31 | 23 | 1.1 TWh |
| Madera County, CA | # 30 | 28 | 1.2 TWh |
| San Joaquin County, CA | # 29 | 53 | 1.5 TWh |
| Yuba County, CA | # 28 | 5 | 1.5 TWh |
| County | State Rank | Active Plants | Dec 2025 Generation |
|---|---|---|---|
| El Dorado County, CA | # 27 | 15 | 1.6 TWh |
| Tulare County, CA | # 26 | 71 | 1.6 TWh |
| Sutter County, CA | # 25 | 8 | 1.7 TWh |
| Placer County, CA | # 24 | 24 | 1.8 TWh |
| Colusa County, CA | # 23 | 4 | 2.2 TWh |
| Plumas County, CA | # 22 | 13 | 2.2 TWh |
| Monterey County, CA | # 21 | 29 | 2.3 TWh |
| Orange County, CA | # 20 | 59 | 2.5 TWh |
| Alameda County, CA | # 19 | 51 | 2.6 TWh |
| Stanislaus County, CA | # 18 | 25 | 2.7 TWh |
| Tuolumne County, CA | # 17 | 23 | 2.9 TWh |
| Solano County, CA | # 16 | 41 | 3.1 TWh |
| Butte County, CA | # 15 | 25 | 3.5 TWh |
| Santa Clara County, CA | # 14 | 76 | 3.5 TWh |
| Kings County, CA | # 13 | 58 | 4.0 TWh |
| San Diego County, CA | # 12 | 156 | 4.3 TWh |
| Sonoma County, CA | # 11 | 26 | 5.0 TWh |
| Sacramento County, CA | # 10 | 67 | 5.6 TWh |
| Shasta County, CA | # 9 | 46 | 7.2 TWh |
| Fresno County, CA | # 8 | 127 | 7.3 TWh |
| Imperial County, CA | # 7 | 84 | 9.9 TWh |
| San Bernardino County, CA | # 6 | 208 | 12.0 TWh |
| Contra Costa County, CA | # 5 | 59 | 12.7 TWh |
| Riverside County, CA | # 4 | 162 | 14.1 TWh |
| Los Angeles County, CA | # 3 | 319 | 16.8 TWh |
| San Luis Obispo County, CA | # 2 | 22 | 20.5 TWh |
| Kern County, CA | # 1 | 317 | 34.2 TWh |