Berrenda Mesa Water District
14823 CA-33, Lost Hills, CA 93249Plant Summary Information
Berrenda Mesa Water District is ranked #284 out of 849 solar farms in California in terms of total annual net electricity generation.
Berrenda Mesa Water District generated 3.6 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Berrenda Mesa Water District |
|---|---|
| Utility Name | The Greater Light USA LLC |
| Location | Kern County, CA |
| Initial Operation Date | July 2023 |
| Last Update | Dec 2024 |
| Annual Generation | 16.5 GWh |
| Annual Consumption | 56.3 k MMBtu |
| Ranked #5,504 out of 12,539 Power Plants Nationwide | |
| Ranked #1,511 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #740 out of 1,600 California Power Plants | |
| Ranked #284 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Tesla Inc. (2021 to 2023) The Greater Light USA LLC (2024 to 2024) |
Map of Berrenda Mesa Water District
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Berrenda Mesa Water District.
Monthly Net Generation for Berrenda Mesa Water District
Berrenda Mesa Water District Details
| Summary Information | |
|---|---|
| Plant Name | Berrenda Mesa Water District (65073) |
| Plant Address | 14823 CA-33, Lost Hills, CA 93249 |
| Utility | The Greater Light USA LLC (65155) |
| Latitude, Longitude | 35.61334, -119.86676 |
| Generation Dates on File | Jan 2024 to Dec 2024 |
| Initial Operation Date | July 2023 |
| Annual Generation | 16.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 3.44 kV |
| Energy Storage | No |
Generator PV1 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 6.4 MW |
| Summer Capacity | 6.4 MW |
| Winter Capacity | 6.4 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2023 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | Yes |
| Azimuth Angle | 90 |
| Tilt Angle | 52 |
| DC Net Capacity | 7.7 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Berrenda Mesa Water District Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1501 | Tracy Solar | Bailey, NC | 16.8 GWh |
| #1502 | Anderson 3 | Anderson, IN | 16.8 GWh |
| #1503 | Brighter Future Solar | Granite Falls, NC | 16.8 GWh |
| #1504 | Northern Cardinal Solar SCS IL 1, LLC | Champaign, IL | 16.7 GWh |
| #1505 | Cinnaminson Landfill Solar | Cinnaminson, NJ | 16.7 GWh |
| #1506 | Centinela State Prison | Sacramento, CA | 16.7 GWh |
| #1507 | Eddy II | Eddy, TX | 16.6 GWh |
| #1508 | Gaston Solar I - SC | Gaston, SC | 16.6 GWh |
| #1509 | Pittsfield Solar LLC | Pittsfield, ME | 16.5 GWh |
| #1510 | Calipatria State Prison | Calipatria, CA | 16.5 GWh |
| #1512 | Bovine | Wallis, TX | 16.5 GWh |
| #1513 | Ash Mesa Solar, LLC | Olathe, CO | 16.4 GWh |
| #1514 | TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh |
| #1515 | Sierra Pacific Industries (2042-RD) | Red Bluff, CA | 16.3 GWh |
| #1516 | Bronson Solar | Bronson, FL | 16.2 GWh |
| #1517 | Suwannee Solar Facility | Live Oak, FL | 16.2 GWh |
| #1518 | New Road Solar, LLC | S Brunswick, NJ | 16.2 GWh |
| #1519 | Cardinal Solar LLC | Marion, SC | 16.2 GWh |
| #1520 | Hope Farm Solar, LLC | Cranston, RI | 16.0 GWh |
| #1521 | Indy Solar I, LLC | Indianapolis, IN | 16.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Berrenda Mesa Water District.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Blackwell Solar Park | Lost Hills, CA | 31.3 GWh | 1.2 mi |
| Chevron - Lost Hills Hybrid | Lost Hills, CA | 67.5 GWh | 9.9 mi |
| Coronal Lost Hills | Lost Hills, CA | 37.4 GWh | 8.1 mi |
| Cottonwood Solar, LLC (Goose Lake) | Lost Hills, CA | 31.5 GWh | 16.2 mi |
| Elk Hills Cogen | Tupman, CA | 29.2 GWh | 11.8 mi |
| Lost Hills Cogeneration Plant | Lost Hills, CA | 9.2 GWh | 6.7 mi |
| Lost Hills Oilfield | Lost Hills, CA | 4.5 GWh | 2.7 mi |
| Lost Hills/Blackwell | Lost Hills, CA | 80.6 GWh | 1 mi |
| Morelos del Sol | Lost Hills, CA | 29.9 GWh | 8.6 mi |
| Nickel 1 Solar Facility | Lost Hills, CA | 2.3 GWh | 8.8 mi |
| Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 3 mi |
| South Belridge Cogeneration Facility | McKittrick, CA | 466.8 GWh | 15 mi |
| Wildwood Solar I, LLC | Wasco, CA | 41.9 GWh | 16.2 mi |
| Wildwood Solar II | Wasco, CA | 38.5 GWh | 16.5 mi |
| Wonderful Huller & Shelling | Lost Hills, CA | 3.5 GWh | 5.1 mi |
| Wonderful Kings | Lost Hills, CA | 7.7 GWh | 10.8 mi |
| Wonderful Lost Hills | Lost Hills, CA | 48.2 GWh | 3.9 mi |
| Wonderful Orchards - Belridge | Lost Hills, CA | 11.9 GWh | 10.2 mi |
| Wonderful Orchards - West Valley | Blackwells Corner, CA | 1.4 GWh | 6.7 mi |
| Wonderful Orchards - Westside | Lost Hills, CA | 12.7 GWh | 10.7 mi |