Gilead Oceanside Solar Project
4010 Ocean Ranch Blvd, Oceanside, CA 92056Plant Summary Information
Gilead Oceanside Solar Project is ranked #641 out of 849 solar farms in California in terms of total annual net electricity generation.
Gilead Oceanside Solar Project generated 325.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Gilead Oceanside Solar Project |
|---|---|
| Utility Name | Gilead Sciences Inc. |
| Location | San Diego County, CA |
| Initial Operation Date | December 2021 |
| Last Update | Dec 2024 |
| Annual Generation | 2.4 GWh |
| Annual Consumption | 8.5 k MMBtu |
| Ranked #10,042 out of 12,539 Power Plants Nationwide | |
| Ranked #4,870 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,356 out of 1,600 California Power Plants | |
| Ranked #641 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Gilead Oceanside Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilead Oceanside Solar Project.
Monthly Net Generation for Gilead Oceanside Solar Project
Gilead Oceanside Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Gilead Oceanside Solar Project (65408) |
| Plant Address | 4010 Ocean Ranch Blvd, Oceanside, CA 92056 |
| Utility | Gilead Sciences Inc. (64754) |
| Latitude, Longitude | 33.21314, -117.30417 |
| Generation Dates on File | Jan 2022 to Dec 2024 |
| Initial Operation Date | December 2021 |
| Annual Generation | 2.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator GOSSB Details Operating December 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.7 MW |
| Summer Capacity | 0.7 MW |
| Winter Capacity | 0.7 MW |
| Minimum Load | 0.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 12H |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 3 |
|---|---|
| Maximum Charge Rate | 0.7 MW |
| Maximum Discharge Rate | 0.7 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1.1 |
| Storage Enclosure Type | CT |
| Arbitrage | Yes |
| Frequency Regulation | P |
| System Peak Shaving | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 65408 |
| Direct Support Gen Id | GOSSP |
| Support T D Asset | No |
Generator GOSSP Details Operating December 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 1.4 MW |
| Winter Capacity | 0.9 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| East West Fixed Tilt | Yes |
| Azimuth Angle | 122.6 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.8 MW |
| Virtual Net Metering Agreement | No |
Gilead Oceanside Solar Project Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4860 | MA-Dighton-A | Dighton, MA | 2.4 GWh |
| #4861 | Bryant Road Solar | Spartanburg, SC | 2.4 GWh |
| #4862 | EAFB - South Base | Edwards Air Force Bas, CA | 2.4 GWh |
| #4863 | Pierce College | Wilmington, CA | 2.4 GWh |
| #4864 | 301 Chestnut Solar NG | East Longmeadow, MA | 2.4 GWh |
| #4865 | Rutgers Busch Livingston Lot B & C | Piscataway, NJ | 2.4 GWh |
| #4866 | Chesapeake College | Wye Mills, MD | 2.4 GWh |
| #4867 | Smith & Wesson at Springfield MA PV | Springfield, MA | 2.4 GWh |
| #4868 | L-8 Solar Project | Palmdale, CA | 2.4 GWh |
| #4869 | Lakeland Electric Co. (FL)-Airport 1 | Lakeland, FL | 2.4 GWh |
| #4871 | St. Paul-Howard Greeley | St. Paul, NE | 2.4 GWh |
| #4872 | DeGraff Butler Electric | Burns, KS | 2.4 GWh |
| #4873 | Mound | Mound Valley, KS | 2.4 GWh |
| #4874 | Oskaloosa | Oskaloosa, KS | 2.4 GWh |
| #4875 | Munich Re Plaza | Princeton, NJ | 2.4 GWh |
| #4876 | Kearsarge Johnstown 1 CSG | Johnstown, NY | 2.4 GWh |
| #4877 | TJX Las Vegas | North Las Vegas, NV | 2.4 GWh |
| #4878 | Schull CSG | Mapleton, MN | 2.4 GWh |
| #4879 | Oltmans SCE at Jurupa | Ontario, CA | 2.4 GWh |
| #4880 | Lindsborg | Lindsborg, KS | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilead Oceanside Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bear Valley | Escondido, CA | 4.2 GWh | 16.9 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 6.1 GWh | 12.5 mi |
| Carlsbad Energy Center | Carlsbad, CA | 264.4 GWh | 5.3 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.2 GWh | 6.8 mi |
| Escondido Energy Center | Escondido, CA | 9.4 GWh | 12.4 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 20.6 GWh | 0.3 mi |
| Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh | 0.3 mi |
| Goal Line LP | Escondido, CA | 8.3 GWh | 13.5 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 5.3 mi |
| NLP Granger | Valley Center, CA | 4.8 GWh | 14.7 mi |
| Orange Grove Peaking Facility | Pala, CA | 23.6 GWh | 15 mi |
| Palomar Energy | Escondido, CA | 1.4 TWh | 12.6 mi |
| Red Mountain | Fallbrook, CA | 34.3 GWh | 14.2 mi |
| San Diego - NCRC at Vista | Vista, CA | 2.9 GWh | 3.2 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.3 GWh | 7.7 mi |
| Vallecitos Water District | San Marcos, CA | 3.2 GWh | 7.3 mi |
| Valley Center | Valley Center, CA | 4.7 GWh | 16.5 mi |
| Valley Center 1 | Valley Center, CA | 3.6 GWh | 17.5 mi |
| Valley Center 2 | Valley Center, CA | 11.4 GWh | 17.5 mi |
| Watkins Manufacturing Co. | San Diego, CA | 7.4 GWh | 6.2 mi |