Gilead Foster City Solar Project
309 Velocity Way, Foster City, CA 94404Plant Summary Information
Gilead Foster City Solar Project is ranked #661 out of 816 solar farms in California in terms of total annual net electricity generation.
Gilead Foster City Solar Project generated 290.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Gilead Foster City Solar Project |
---|---|
Utility Name | Gilead Sciences Inc. Foster City |
Location | San Mateo County, CA |
Initial Operation Date | April 2021 |
Last Update | Dec 2024 |
Annual Generation | 1.9 GWh |
Annual Consumption | 7.0 k MMBtu |
Ranked #10,377 out of 12,288 Power Plants Nationwide | |
Ranked #5,127 out of 6,174 Solar Power Plants Nationwide | |
Ranked #1,385 out of 1,564 California Power Plants | |
Ranked #661 out of 816 California Solar Power Plants | |
Fuel Types | Solar |
Map of Gilead Foster City Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Gilead Foster City Solar Project.
Monthly Net Generation for Gilead Foster City Solar Project
Gilead Foster City Solar Project Details
Summary Information | |
---|---|
Plant Name | Gilead Foster City Solar Project (65409) |
Plant Address | 309 Velocity Way, Foster City, CA 94404 |
Utility | Gilead Sciences Inc. Foster City (64755) |
Latitude, Longitude | 37.5686, -122.27797 |
Generation Dates on File | Apr 2021 to Dec 2024 |
Initial Operation Date | April 2021 |
Annual Generation | 1.9 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 0.48 kV |
Energy Storage | Yes |
Generator GFCS1 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 5 |
DC Net Capacity | 1.1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.1 MW |
Virtual Net Metering Agreement | No |
Generator GFCS2 Details Operating April 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.2 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.1 MW |
Winter Capacity | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Tilt Angle | 10 |
DC Net Capacity | 0.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 0.2 MW |
Virtual Net Metering Agreement | No |
Generator GFCSB Details Operating April 2021
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Nameplate Power Factor | 1 |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2021 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 12H |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 0.9 |
---|---|
Maximum Charge Rate | 0.5 MW |
Maximum Discharge Rate | 0.5 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 1.1 |
Storage Enclosure Type | CT |
System Peak Shaving | P |
Excess Wind And Solar Generation | Yes |
Ac Coupled | Yes |
Direct Support Of Another Unit | No |
Direct Support Plant Id | 65409 |
Direct Support Gen Id | GFCS1 |
Support T D Asset | No |
Gilead Foster City Solar Project Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#5117 | Perdue Bridgeville Photovoltaic | Bridgeville, DE | 2.0 GWh |
#5118 | Westminster Renewables, LLC CSG | Westminster, MA | 2.0 GWh |
#5119 | Lowry CSG2, LLC | Glenwood, MN | 2.0 GWh |
#5120 | USS Franklin Solar LLC | Franklin, MN | 2.0 GWh |
#5121 | Andresen Solar | Clara City, MN | 2.0 GWh |
#5122 | Broadway 2 - Tucson Phase II | Tucson, AZ | 2.0 GWh |
#5123 | Salt Palace Solar Gen Plant | Salt Lake City, UT | 2.0 GWh |
#5124 | Pivot Solar 15 LLC (CSG) | Brush, CO | 2.0 GWh |
#5125 | Homer Street East | Olean, NY | 2.0 GWh |
#5126 | 4 Applegate Solar LLC | Robbinsville, NJ | 2.0 GWh |
#5128 | Ace Solar | Piedmont, SC | 2.0 GWh |
#5129 | Medline Ind. Phase 2 Tracy | Tracy, CA | 2.0 GWh |
#5130 | Bizer Creek | Getzville, NY | 2.0 GWh |
#5131 | USS Wells Creek Solar LLC | Goodhue, MN | 2.0 GWh |
#5132 | Silver City WWTP PV Project | Silver City, NM | 2.0 GWh |
#5133 | Montgomery County Correctional Facility | Boyds, MD | 2.0 GWh |
#5134 | USS KVPV Solar LLC CSG | Fulton, MN | 2.0 GWh |
#5135 | Cenergy - Kiger | Embden, ME | 2.0 GWh |
#5136 | Slayton Solar | Slayton, MN | 2.0 GWh |
#5137 | California PV Energy at ISD WWTP | Oakley, CA | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Gilead Foster City Solar Project.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Alameda | Alameda, CA | 3.1 GWh | 15.2 mi |
Ameresco Ox Mountain | Half Moon Bay, CA | 81.1 GWh | 8.2 mi |
AT&T - Hayward | Hayward, CA | 8.2 GWh | 11.7 mi |
AT&T - Redwood City | Redwood City, CA | 5.6 GWh | 7.4 mi |
City of Hayward WWTP | Hayward, CA | 11.3 GWh | 8.8 mi |
City of Palo Alto | Palo Alta, CA | 20.6 MWh | 12.9 mi |
Dynegy Oakland Power Plant | Oakland, CA | 2.5 GWh | 15.8 mi |
Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 38.3 GWh | 16.3 mi |
Franklin Templeton San Mateo | San Mateo, CA | 9.3 GWh | 2 mi |
KSR028 Merced Fuel Cell | San Leandro, CA | 15.7 GWh | 11.4 mi |
One Market Plaza | San Francisco, CA | 177.0 MWh | 16.8 mi |
Parnassus Central Utility Plant | San Francisco, CA | 68.8 GWh | 16.6 mi |
Preferred Freezer San Leandro | San Leandro, CA | 3.2 GWh | 12.1 mi |
Russell City Energy Center | Hayward, CA | 1.6 TWh | 9.1 mi |
SF Southeast Cogen Plant | San Francisco, CA | 3.9 GWh | 13.4 mi |
Shelter Creek Condominiums Solar | San Bruno, CA | 3.5 GWh | 9 mi |
Silicon Valley Clean Water | Redwood City, CA | 7.0 GWh | 3.1 mi |
Solar Star Palo Alto I, LLC | Palo Alto, CA | 2.0 GWh | 13 mi |
SRI International Cogen Project | Menlo Park, CA | 24.4 GWh | 9.7 mi |
Stanford Campus Solar | Stanford, CA | 5.9 GWh | 11.3 mi |