North Juvenile Detention Center Solar

11200 Avenue 368, Visalia, CA 93291

Plant Summary Information

North Juvenile Detention Center Solar is ranked #665 out of 817 solar farms in California in terms of total annual net electricity generation.

North Juvenile Detention Center Solar generated 143.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameNorth Juvenile Detention Center Solar
Utility NameSoCore Energy LLC
LocationTulare County, CA
Initial Operation DateNovember 2019
Last Update Dec 2024
Annual Generation 2.0 GWh
Annual Consumption 6.7 k MMBtu
Ranked #10,378 out of 12,299 Power Plants Nationwide
Ranked #5,155 out of 6,182 Solar Power Plants Nationwide
Ranked #1,383 out of 1,566 California Power Plants
Ranked #665 out of 817 California Solar Power Plants
Fuel Types Solar

Map of North Juvenile Detention Center Solar

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for North Juvenile Detention Center Solar.

Create Your Account Today

Monthly Net Generation for North Juvenile Detention Center Solar

320320240240160160808000Jan '24Jan '24Feb '24Feb '24Mar '24Mar '24Apr '24Apr '24May '24May '24Jun '24Jun '24Jul '24Jul '24Aug '24Aug '24Sep '24Sep '24Oct '24Oct '24Nov '24Nov '24Dec '24Dec '24
Download SVG
Download PNG
Download CSV

North Juvenile Detention Center Solar Details

Summary Information
Plant NameNorth Juvenile Detention Center Solar (68266)
Plant Address11200 Avenue 368, Visalia, CA 93291
UtilitySoCore Energy LLC (60520)
Latitude, Longitude36.461, -119.32
Generation Dates on FileJan 2024 to Dec 2024
Initial Operation DateNovember 2019
Annual Generation 2.0 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number19-787-001
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water SourceNA
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 12.00 kV
Energy StorageYes

Generator BA1 Details Operating November 2019

TechnologyBatteries
Prime MoverBattery
OwnershipSingle Owner
Nameplate Capacity0.3 MW
Summer Capacity0.3 MW
Winter Capacity0.3 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Energy Storage Details
Nameplate Energy Capacity MWH0.5
Maximum Charge Rate0.3 MW
Maximum Discharge Rate0.3 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.3
Storage Enclosure TypeCS
Frequency RegulationYes
Load ManagementP
Voltage Or Reactive Power SupportYes
Direct Support Of Another UnitNo
Support T D AssetYes

Generator PV1 Details Operating November 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity1.1 MW
Summer Capacity1.1 MW
Winter Capacity1.1 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2019
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solar Details
Single Axis TrackingYes
Azimuth Angle180
Tilt Angle26
DC Net Capacity1.3 MW
Crystalline SiliconYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

North Juvenile Detention Center Solar Plant Owners

Owner NameAddressGeneratorOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#5145Slayton SolarSlayton, MN2.0 GWh
#5146Cenergy - KigerEmbden, ME2.0 GWh
#5147CUA West Campus - North (CSG)Washington, DC2.0 GWh
#5148RC Energy AA LLC Solar FacilityAlbuquerque, NM2.0 GWh
#5149California PV Energy at ISD WWTPOakley, CA2.0 GWh
#5150USS Webster Solar CSGWebster, MN2.0 GWh
#5151USS Kost Trail Solar CSGNorth Branch, MN2.0 GWh
#5152Honeysuckle Solar, LLCLester Prairie, MN2.0 GWh
#5153South Cary WRF Solar ArrayApex, NC2.0 GWh
#5154East Springfield Solar PVSpringfield, MA2.0 GWh
#5156USS Milkweed Solar LLC CSGPaynesville, MN2.0 GWh
#5157Flodquist Community Solar LLC CSGLindstrom, MN2.0 GWh
#5158US GSA - SacramentoSacramento, CA2.0 GWh
#5159Rich Mountain Electric CooperativeMena, AR2.0 GWh
#5160Forrest City- Eldridge RoadForrest City, AR2.0 GWh
#5161Bibb JonesMacon, GA2.0 GWh
#5162USS Pheasant Solar LLC CSGClara City, MN2.0 GWh
#5163USS Rockpoint Solar CSGStacy, MN2.0 GWh
#5164USS Reindeer Solar LLC CSGSauk Rapids, MN2.0 GWh
#5165Hayfield Solar III LLC CSGHayfield, MN2.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding North Juvenile Detention Center Solar.

Plant NamePlant LocationAnnual GenerationDistance
Agriculture Capital - Legacy PackingDinuba, CA3.9 GWh8.5 mi
Bob Wiley Detention CenterVisalia, CA2.8 GWh0.7 mi
Civic Center EastVisalia, CA2.7 GWh9.1 mi
Dinuba Wastewater Treatment PlantDinuba, CA1.4 GWh8 mi
Double J Dairy ArrayVisalia, CA8.5 GWh9 mi
Dover DairyHanford, CA2.7 GWh13.4 mi
FTF-PackingShedReedley, CA581.0 MWh8.5 mi
Government Plaza SolarVisalia, CA1.7 GWh12.6 mi
Ivanhoe SolarVisalia, CA5.6 GWh6.2 mi
Kaweah Delta District HospitalVisalia, CA21.3 GWh9.3 mi
Kingsburg SolarKingsburg, CA6.0 GWh12.6 mi
MM Tulare EnergyVisalia, CA9.7 GWh6.5 mi
Moonlight Packing - Phase 2Reedley, CA2.6 GWh12 mi
POM Beverage SolarDel Rey, CA4.5 GWh5.3 mi
POM Juice SolarFresno, CA3.2 GWh5 mi
RE-VFO LLCVisalia, CA1.8 GWh8.7 mi
Reedley Community College SolarReedley, CA4.0 GWh12.6 mi
Still Water PowerHanford, CA674.0 MWh12.1 mi
Tulare Akers Professional CenterVisalia, CA1.6 GWh9.8 mi
Visalia CSG LLCTulare, CA6.4 GWh11.5 mi