Blythe Solar III, LLC Hybrid
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar III, LLC Hybrid is ranked #54 out of 885 solar farms in California in terms of total annual net electricity generation.
Blythe Solar III, LLC Hybrid generated 95.9 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Blythe Solar III, LLC Hybrid |
|---|---|
| Utility Name | Blythe Solar III, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | May 2020 |
| Last Update | May 2026 |
| Annual Generation | 347.5 GWh |
| Annual Consumption | 1.4 M MMBtu |
| Ranked #1,835 out of 13,081 Power Plants Nationwide | |
| Ranked #231 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #146 out of 1,606 California Power Plants | |
| Ranked #54 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blythe Solar III, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar III, LLC Hybrid.
Monthly Net Generation for Blythe Solar III, LLC Hybrid
Monthly Plant Fuel Consumption for Blythe Solar III, LLC Hybrid
Blythe Solar III, LLC Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Blythe Solar III, LLC Hybrid (60094) |
| Plant Address | 4000 Dracker Drive, Blythe, CA 92225 |
| Utility | Blythe Solar III, LLC (59844) |
| Latitude, Longitude | 33.656, -114.742 |
| Generation Dates on File | May 2020 to May 2026 |
| Initial Operation Date | May 2020 |
| Annual Generation | 347.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator BLSL3 Details Operating May 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 136.8 MW |
| Summer Capacity | 136.8 MW |
| Winter Capacity | 136.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 154 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLST3 Details Operating May 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 115 MW |
| Summer Capacity | 115 MW |
| Winter Capacity | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 538.6 |
|---|---|
| Maximum Charge Rate | 115 MW |
| Maximum Discharge Rate | 115 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 126.9 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Frequency Regulation | P |
| Ramping Spinning Reserve | Yes |
| Load Management | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Blythe Solar III, LLC Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #221 | RE Roserock | Fort Stockton, TX | 369.0 GWh |
| #222 | Calhoun Solar | Battle Creek, MI | 368.8 GWh |
| #223 | Rambler | San Angelo, TX | 368.7 GWh |
| #224 | Hillcrest Solar | Mt. Orab, OH | 367.5 GWh |
| #225 | Markum Solar Farm | Valley Mills, TX | 367.0 GWh |
| #226 | Lund Hill Solar | Bickleton, WA | 366.7 GWh |
| #227 | Darien Solar | Darien, WI | 366.3 GWh |
| #228 | Fifth Standard Solar PV, LLC (Hybrid) | Huron, CA | 338.5 GWh |
| #229 | Roaring Springs, LLC | Motley, TX | 361.9 GWh |
| #230 | North Rosamond Solar LLC | Rosamond, CA | 361.7 GWh |
| #232 | Hardy Hills Solar Energy LLC | Frankfort, IN | 359.5 GWh |
| #233 | Castle Gap Solar Hybrid | McCarney, TX | 359.0 GWh |
| #234 | Diver Solar, LLC | Thornton, TX | 359.2 GWh |
| #235 | Skeleton Creek Energy Center Hybrid | Carrier, OK | 1.3 TWh |
| #236 | Camilla Solar Energy Project | Camilla, GA | 359.0 GWh |
| #237 | Imperial Solar Energy Center West | Seeley, CA | 357.0 GWh |
| #238 | Spanish Peaks Solar | Trinidad, CO | 354.9 GWh |
| #239 | Zier Solar | Brackettville, TX | 348.8 GWh |
| #240 | Arlington Energy Center III | Blythe, CA | 334.1 GWh |
| #241 | Newport Solar Project | Newport, AR | 353.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar III, LLC Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 640.9 GWh | 3.1 mi |
| Arlington Energy Center III | Blythe, CA | 334.1 GWh | 3.1 mi |
| Blythe Energy Inc | Blythe, CA | 315.9 GWh | 4.2 mi |
| Blythe Mesa Solar II | Blythe, CA | 578.3 GWh | 3.7 mi |
| Blythe Solar 110, LLC | Blythe, CA | 283.6 GWh | 1.7 mi |
| Blythe Solar II, LLC | Blythe, CA | 329.1 GWh | 1.8 mi |
| Blythe Solar IV, LLC | Blythe, CA | 343.3 GWh | 2.3 mi |
| Chuckawalla Solar | Blythe, CA | 7.3 GWh | 11.8 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 502.0 MWh | 11.2 mi |
| Desert Quartzite | Blythe, CA | 855.4 GWh | 6.3 mi |
| Genesis Solar Energy Project | Blythe, CA | 600.0 GWh | 14.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.3 GWh | 11.9 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 638.7 GWh | 2.7 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 5.2 mi |
| Solar Blythe 2 | Blythe, CA | 40.7 GWh | 3.7 mi |
| Solar Blythe LLC | Blythe, CA | 38.8 GWh | 4.4 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 1.4 GWh | 11.8 mi |
| Venable Solar 1 | Blythe, CA | 3.7 GWh | 10.6 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 10.6 mi |
| Victory Pass | Desert Center, CA | 568.8 GWh | 33.2 mi |