Blythe Solar III, LLC Hybrid
4000 Dracker Drive, Blythe, CA 92225Plant Summary Information
Blythe Solar III, LLC Hybrid is ranked #49 out of 852 solar farms in California in terms of total annual net electricity generation.
Blythe Solar III, LLC Hybrid generated 66.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Blythe Solar III, LLC Hybrid |
|---|---|
| Utility Name | Blythe Solar III, LLC |
| Location | Riverside County, CA |
| Initial Operation Date | May 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 354.6 GWh |
| Annual Consumption | 1.3 M MMBtu |
| Ranked #1,775 out of 12,613 Power Plants Nationwide | |
| Ranked #193 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #141 out of 1,603 California Power Plants | |
| Ranked #49 out of 852 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blythe Solar III, LLC Hybrid
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blythe Solar III, LLC Hybrid.
Monthly Net Generation for Blythe Solar III, LLC Hybrid
Monthly Plant Fuel Consumption for Blythe Solar III, LLC Hybrid
Blythe Solar III, LLC Hybrid Details
| Summary Information | |
|---|---|
| Plant Name | Blythe Solar III, LLC Hybrid (60094) |
| Plant Address | 4000 Dracker Drive, Blythe, CA 92225 |
| Utility | Blythe Solar III, LLC (59844) |
| Latitude, Longitude | 33.656, -114.742 |
| Generation Dates on File | May 2020 to Dec 2025 |
| Initial Operation Date | May 2020 |
| Annual Generation | 354.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 220.00 kV |
| Energy Storage | Yes |
Generator BLSL3 Details Operating May 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 136.8 MW |
| Summer Capacity | 136.8 MW |
| Winter Capacity | 136.8 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 154 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator BLST3 Details Operating May 2021
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 115 MW |
| Summer Capacity | 115 MW |
| Winter Capacity | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 538.6 |
|---|---|
| Maximum Charge Rate | 115 MW |
| Maximum Discharge Rate | 115 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 126.9 |
| Storage Enclosure Type | CS |
| Arbitrage | Yes |
| Frequency Regulation | P |
| Ramping Spinning Reserve | Yes |
| Load Management | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Blythe Solar III, LLC Hybrid Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #183 | Dry Lake Solar Energy Center | Moapa, NV | 362.3 GWh |
| #184 | RE Roserock | Fort Stockton, TX | 378.0 GWh |
| #185 | Rambler | San Angelo, TX | 376.9 GWh |
| #186 | Raceway Solar & Storage | Lancaster, CA | 368.1 GWh |
| #187 | Big Star Solar, LLC (Hybrid) | Rosanky, TX | 372.1 GWh |
| #188 | Grant County | Town of Potosi, WI | 376.2 GWh |
| #189 | Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh |
| #190 | Edwards Sanborn E1B | Mojave, CA | 354.7 GWh |
| #191 | Long Lake Solar, LLC | West Helena, AR | 371.4 GWh |
| #192 | Zier Solar | Brackettville, TX | 364.4 GWh |
| #194 | Maverick Solar, LLC | Desert Center, CA | 369.7 GWh |
| #195 | Corazon Energy LLC | Rachito Las Lomas, TX | 369.1 GWh |
| #196 | Lund Hill Solar | Bickleton, WA | 367.3 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 366.5 GWh |
| #198 | BigBeau Solar, LLC | Rosamond, CA | 362.2 GWh |
| #199 | Markum Solar Farm | Valley Mills, TX | 364.6 GWh |
| #200 | Bright Arrow Solar, LLC | Sulphur Springs, TX | 359.1 GWh |
| #201 | Solar Gen 2 Solar Facility | Calipatria, CA | 364.2 GWh |
| #202 | Hardy Hills Solar Energy LLC | Frankfort, IN | 363.1 GWh |
| #203 | Hillcrest Solar | Mt. Orab, OH | 362.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blythe Solar III, LLC Hybrid.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arlington Energy Center II | Blythe, CA | 633.5 GWh | 3.1 mi |
| Arlington Energy Center III | Blythe, CA | 320.9 GWh | 3.1 mi |
| Blythe Energy Inc | Blythe, CA | 315.2 GWh | 4.2 mi |
| Blythe Mesa Solar II | Blythe, CA | 585.5 GWh | 3.7 mi |
| Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh | 1.7 mi |
| Blythe Solar II, LLC | Blythe, CA | 337.0 GWh | 1.8 mi |
| Blythe Solar IV, LLC | Blythe, CA | 346.8 GWh | 2.3 mi |
| Chuckawalla Solar | Blythe, CA | 7.1 GWh | 11.8 mi |
| Chuckawalla Valley State Prison | Blythe, CA | 1.4 GWh | 11.2 mi |
| Desert Quartzite | Blythe, CA | 822.9 GWh | 6.3 mi |
| Genesis Solar Energy Project | Blythe, CA | 607.9 GWh | 14.7 mi |
| Ironwood Solar LLC | Blythe, CA | 7.5 GWh | 11.9 mi |
| McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh | 2.7 mi |
| Palo Verde College | Blythe, CA | 2.0 GWh | 5.2 mi |
| Solar Blythe 2 | Blythe, CA | 38.1 GWh | 3.7 mi |
| Solar Blythe LLC | Blythe, CA | 41.8 GWh | 4.4 mi |
| SunEdison Ironwood State Prison | Blythe, CA | 996.0 MWh | 11.8 mi |
| Venable Solar 1 | Blythe, CA | 3.4 GWh | 10.6 mi |
| Venable Solar 2 | Blythe, CA | 3.4 GWh | 10.6 mi |
| Victory Pass | Desert Center, CA | 574.6 GWh | 33.2 mi |