Walnut Unified School District Walnut HS is ranked #871 out of 885 solar farms in California in terms of total annual net electricity generation.

Walnut Unified School District Walnut HS generated -6.0 MWh during the 3-month period between March 2025 to June 2025.

Plant NameWalnut Unified School District Walnut HS
Utility NameTesla Inc.
LocationLos Angeles County, CA
Initial Operation DateFebruary 2020
Last Update Jun 2025
Annual Generation 327.0 MWh
Annual Consumption 1.2 k MMBtu
Ranked #12,394 out of 13,081 Power Plants Nationwide
Ranked #6,886 out of 7,015 Solar Power Plants Nationwide
Ranked #1,587 out of 1,606 California Power Plants
Ranked #871 out of 885 California Solar Power Plants
Fuel Types Solar

Map of Walnut Unified School District Walnut HS

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Unified School District Walnut HS.

Create Your Account Today

Monthly Net Generation for Walnut Unified School District Walnut HS

Monthly Plant Fuel Consumption for Walnut Unified School District Walnut HS

Walnut Unified School District Walnut HS Details

Summary Information
Plant NameWalnut Unified School District Walnut HS (63510)
Plant Address400 Pierre Rd, Walnut, CA 91789
UtilityTesla Inc. (57313)
Latitude, Longitude34.02188, -117.85051
Generation Dates on FileFeb 2020 to Jun 2025
Initial Operation DateFebruary 2020
Annual Generation 327.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 33.30 kV / 36.60 kV
Energy StorageYes

Generator PV1 Details Operating February 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity1.8 MW
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Fixed TiltYes
Azimuth Angle260
Tilt Angle5
DC Net Capacity2.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.5 MW
Virtual Net Metering AgreementNo

Generator ST1 Details Operating February 2020

TechnologyBatteries
Prime MoverBattery
OwnershipWholly Owned by Other Entity
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH0.5
Maximum Charge Rate0.1 MW
Maximum Discharge Rate0.1 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.1
Storage Enclosure TypeCS
Load ManagementYes
Backup PowerYes
Excess Wind And Solar GenerationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63510
Direct Support Gen IdPV1
Support T D AssetNo

Walnut Unified School District Walnut HS Plant Owners

Owner NameAddressGeneratorOwnership
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator PV1100.00%
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator ST1100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6876South Belleville Solar, LLCSmithton Township, IL385.0 MWh
#6877Triple S Solar I LLC CSGKansas, IL381.0 MWh
#6878USS Golden Spike Solar LLC CSGSauk Rapids, MN379.0 MWh
#6879HannibalGillman, WI378.0 MWh
#6880Lanesville Solar RESLanesville, IN374.0 MWh
#6881Mountain View Ind Park 1-sline001Fontana, CA371.0 MWh
#6882SV CSG Prophetstown 1Prophetstown, IL370.0 MWh
#6883AES Bend Solar I, LLC CSGRockford, IL369.0 MWh
#6884Bright FutureHammond, WI361.0 MWh
#6885Vermilion Solar II LLC CSGPontiac, IL357.0 MWh
#6887Bowie State SolarBowie, MD342.0 MWh
#6888Pilot Rock Solar 2Pilot Rock, OR340.0 MWh
#6889SL JAMESTOWN ARRAY 1Jamestown, NY337.0 MWh
#6890Magruder Solar Community SolarShawangunk, NY335.0 MWh
#6891Next GenerationWoodville, WI331.0 MWh
#6892IKEA St. Louis 410St. Louis, MO328.0 MWh
#6893Westside AvenueNorth Bergen, NJ327.0 MWh
#6894NSF Marshall Site 2Marshall, NY320.0 MWh
#6895DD Hay Road Solar 23 LLCNew Castle, DE320.0 MWh
#6896Rock LakeSolar WI, LLCWaterloo, WI318.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Walnut Unified School District Walnut HS.

Plant NamePlant LocationAnnual GenerationDistance
Blacksand Generating FacilityBrea, CA30.5 GWh6.2 mi
Brea Expansion PlantBrea, CA245.8 GWh6.2 mi
CamChino Leasing LLCChino, CA6.9 GWh10 mi
Canyon Power PlantAnaheim, CA18.8 GWh11.3 mi
CSUF Nutwood SolarFullerton, CA2.9 GWh10.1 mi
CSUF State CollegeFullerton, CA1.6 GWh10.1 mi
CSUF TrigenerationFullerton, CA35.5 GWh10 mi
Gilead Sciences La Verne Rooftop SolarLa Verne, CA2.5 GWh6.5 mi
Industry MetroLink PV 1Industry, CA1.4 GWh1 mi
Irwindale Brew Yard, LLCIrwindale, CA517.0 MWh8.5 mi
Kaiser East La Palma Ave. Fuel CellAnaheim, CA17.8 GWh11.8 mi
Kroger La HabraLa Habra, CA1.7 GWh8.6 mi
MM West CovinaWest Covina, CA40.4 GWh3.3 mi
Puente Hills Energy RecoveryWhittier, CA146.9 GWh9.9 mi
San Antonio West Solar RooftopChino, CA2.3 GWh11.6 mi
San DimasSan Dimas, CA10.3 GWh7.9 mi
San Dimas Wash Generating StationSan Dimas, CA1.2 GWh7.5 mi
Walnut Creek Energy ParkIndustry, CA38.3 GWh5.5 mi
Weymouth Solar PlantLa Verne, CA3.3 GWh7.2 mi
Yorba LindaYorba Linda, CA9.4 GWh7.8 mi