Walnut Unified School District Walnut HS

400 Pierre Rd, Walnut, CA 91789

Plant Summary Information

Walnut Unified School District Walnut HS is ranked #816 out of 849 solar farms in California in terms of total annual net electricity generation.

Walnut Unified School District Walnut HS generated 336.0 MWh during the 3-month period between September 2024 to December 2024.

Plant NameWalnut Unified School District Walnut HS
Utility NameTesla Inc.
LocationLos Angeles County, CA
Initial Operation DateFebruary 2020
Last Update Dec 2024
Annual Generation 809.0 MWh
Annual Consumption 3.1 k MMBtu
Ranked #11,534 out of 12,553 Power Plants Nationwide
Ranked #6,174 out of 6,410 Solar Power Plants Nationwide
Ranked #1,551 out of 1,601 California Power Plants
Ranked #816 out of 849 California Solar Power Plants
Fuel Types Solar

Map of Walnut Unified School District Walnut HS

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Walnut Unified School District Walnut HS.

Create Your Account Today

Monthly Net Generation for Walnut Unified School District Walnut HS

Walnut Unified School District Walnut HS Details

Summary Information
Plant NameWalnut Unified School District Walnut HS (63510)
Plant Address400 Pierre Rd, Walnut, CA 91789
UtilityTesla Inc. (57313)
Latitude, Longitude34.02188, -117.85051
Generation Dates on FileFeb 2020 to Dec 2024
Initial Operation DateFebruary 2020
Annual Generation 809.0 MWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSouthern California Edison Co (17609) CA
Grid Voltage 33.30 kV / 36.60 kV
Energy StorageYes

Generator PV1 Details Operating February 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipWholly Owned by Other Entity
Nameplate Capacity1.8 MW
Summer Capacity1.8 MW
Winter Capacity1.8 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Time From Cold Shutdown To Full Load10M
Solar Details
Fixed TiltYes
Azimuth Angle260
Tilt Angle5
DC Net Capacity2.2 MW
Crystalline SiliconYes
Net Metering AgreementYes
Net Metering DC Capacity1.5 MW
Virtual Net Metering AgreementNo

Generator ST1 Details Operating February 2020

TechnologyBatteries
Prime MoverBattery
OwnershipWholly Owned by Other Entity
Nameplate Capacity0.5 MW
Summer Capacity0.5 MW
Winter Capacity0.5 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateFebruary 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceElectricity used for energy storage
Time From Cold Shutdown To Full Load10M
Energy Storage Details
Nameplate Energy Capacity MWH0.5
Maximum Charge Rate0.1 MW
Maximum Discharge Rate0.1 MW
Storage TechnologyLIB
Nameplate Reactive Power Rating0.1
Storage Enclosure TypeCS
Load ManagementYes
Backup PowerYes
Excess Wind And Solar GenerationP
Ac CoupledYes
Direct Support Of Another UnitYes
Direct Support Plant Id63510
Direct Support Gen IdPV1
Support T D AssetNo

Walnut Unified School District Walnut HS Plant Owners

Owner NameAddressGeneratorOwnership
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator PV1100.00%
Solar Integrated Fund VI, LLC6800 Dumbarton Cirlce, Fremont, CA 94555Generator ST1100.00%

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#6164Niagara Bottling StocktonStockton, CA870.0 MWh
#6165Edwards Air Force BaseEdwards, CA866.0 MWh
#6166Park SolarWoodbridge, CT866.0 MWh
#6167CSU Northridge PlantNorthridge, CA865.0 MWh
#6168LSE Pavo SolarWalton, NY861.0 MWh
#6169Manlius WestManlius, NY848.0 MWh
#6170Renewable Energy Center at BJHSt Louis, MO846.0 MWh
#6171Searcy Water ISearcy, AR834.0 MWh
#6172Clovis High SchoolClovis, CA826.0 MWh
#6173CCMUACamden, NJ824.0 MWh
#6175Rockville Solar II, LLCIndianapolis, IN812.0 MWh
#6176ME Novel Lighthouse - Penobscot CSGPatten, ME812.0 MWh
#6177ESA SelmaSelma, NC811.0 MWh
#6178Silver Lake Solar Photovoltaic FacilityPittsfield, MA805.0 MWh
#6179Questa Solar FacilityQuesta, NM804.0 MWh
#6180Haleon York RDC Solar FacilityYork, PA798.0 MWh
#6181Morgan Lancaster 1Lancaster, CA796.0 MWh
#6182English Creek SolarPlant City, FL791.0 MWh
#6183Preston Garden (CSG)Franklin, MN785.0 MWh
#6184Facile SolarElon, NC783.0 MWh

Nearby Power Plants

Below are closest 20 power plants surrounding Walnut Unified School District Walnut HS.

Plant NamePlant LocationAnnual GenerationDistance
Biola University HybridLa Mirada, CA13.0 GWh12.2 mi
Blacksand Generating FacilityBrea, CA39.0 GWh6.2 mi
Brea Expansion PlantBrea, CA233.0 GWh6.2 mi
CamChino Leasing LLCChino, CA6.9 GWh10 mi
Canyon Power PlantAnaheim, CA16.1 GWh11.3 mi
CSUF Nutwood SolarFullerton, CA3.1 GWh10.1 mi
CSUF State CollegeFullerton, CA1.6 GWh10.1 mi
CSUF TrigenerationFullerton, CA37.6 GWh10 mi
Gilead Sciences La Verne Rooftop SolarLa Verne, CA2.5 GWh6.5 mi
Industry MetroLink PV 1Industry, CA1.1 GWh1 mi
Irwindale Brew Yard, LLCIrwindale, CA517.0 MWh8.5 mi
Kaiser East La Palma Ave. Fuel CellAnaheim, CA18.1 GWh11.8 mi
Kroger La HabraLa Habra, CA1.7 GWh8.6 mi
MM West CovinaWest Covina, CA31.0 GWh3.3 mi
Puente Hills Energy RecoveryWhittier, CA151.7 GWh9.9 mi
San Antonio West Solar RooftopChino, CA1.7 GWh11.6 mi
San Dimas Wash Generating StationSan Dimas, CA4.8 GWh7.5 mi
San Gabriel Hydro ProjectAzusa, CA4.9 GWh12.6 mi
Walnut Creek Energy ParkIndustry, CA45.6 GWh5.5 mi
Weymouth Solar PlantLa Verne, CA4.8 GWh7.2 mi