Borden Solar Farm

13282 Road 33, Madera, CA 9363

Plant Summary Information

Borden Solar Farm is ranked #116 out of 818 solar farms in California in terms of total annual net electricity generation.

Borden Solar Farm generated 42.9 GWh during the 3-month period between March 2025 to June 2025.

Plant NameBorden Solar Farm
Utility Name41MB 8me, LLC
LocationMadera County, CA
Initial Operation DateJune 2020
Last Update Jun 2025
Annual Generation 117.3 GWh
Annual Consumption 435.8 k MMBtu
Ranked #3,146 out of 12,327 Power Plants Nationwide
Ranked #675 out of 6,200 Solar Power Plants Nationwide
Ranked #343 out of 1,567 California Power Plants
Ranked #116 out of 818 California Solar Power Plants
Fuel Types Solar

Map of Borden Solar Farm

Full Screen Map
Use Ctrl + scroll to zoom the map
Use two fingers to move the map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Borden Solar Farm.

Create Your Account Today

Monthly Net Generation for Borden Solar Farm

20k20k16k16k12k12k8k8k4k4k002021202120222022202320232024202420252025
Download SVG
Download PNG
Download CSV

Borden Solar Farm Details

Summary Information
Plant NameBorden Solar Farm (59531)
Plant Address13282 Road 33, Madera, CA 9363
Utility41MB 8me, LLC (59272)
Latitude, Longitude36.94111, -119.96
Generation Dates on FileMay 2020 to Jun 2025
Initial Operation DateJune 2020
Annual Generation 117.3 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG19-49-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 69.00 kV
Energy StorageNo

Generator BRDN Details Operating June 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity50 MW
Summer Capacity50 MW
Winter Capacity50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity67.8 MW
Crystalline SiliconNo
Other MaterialsYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Borden Solar Farm Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#665Sauk Solar ParkUnion City, MI119.8 GWh
#666Magnolia Springs Solar CenterGreen Cove Springs, FL119.7 GWh
#667Meridian IIIMeridian, MS119.7 GWh
#668Hawtree SolarWarrenton, NC119.6 GWh
#669Debary Solar Power PlantDeBary, FL119.5 GWh
#670Alpine SolarLancaster, CA118.8 GWh
#671Gadsden County SolarChattahoochee, FL118.4 GWh
#672Hooper SolarMosca, CO118.3 GWh
#673Desper SolarLouisa, VA117.8 GWh
#674Ocotillo WellsBorrego Springs, CA117.6 GWh
#676Sandstone SolarFlorence, AZ117.2 GWh
#677Colgreen North Shore Solar FarmMecca, CA116.9 GWh
#678Riverstart Solar Park IIIModoc, IN116.5 GWh
#679Hecate Energy Beacon Solar 4Cantil, CA116.5 GWh
#680Horizon Solar Energy CenterHawthorne, FL116.2 GWh
#681Techren Solar VBoulder, NV115.5 GWh
#682Beacon Solar Plant Site 2Cantil, CA115.5 GWh
#683Iris Solar LLCFranklinton, LA115.1 GWh
#684Boulder Solar II, LLCBoulder City, NV115.1 GWh
#685Twin LakesInterlachen, FL115.0 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Borden Solar Farm.

Plant NamePlant LocationAnnual GenerationDistance
CA - Madera USD - Madera South HSMadera, CA462.0 MWh5 mi
City of Madera WWTPMadera, CA1.4 GWh10.9 mi
Clovis High SchoolClovis, CA826.0 MWh17.6 mi
Clovis North High SchoolFresno, CA1.5 GWh12.8 mi
CSU Fresno Solar ProjectFresno, CA1.4 GWh15.1 mi
DGS Central California Womens FacilityChowchilla, CA3.8 GWh14.7 mi
DGS Valley State PrisonChowchilla, CA3.9 GWh15.4 mi
Fresno Bullard High School HybridFresno, CA2.2 GWh11.8 mi
Fresno Community SolarFresno, CA15.4 GWh17.4 mi
Fresno Hoover High School HybridFresno, CA2.1 GWh13.5 mi
Friant Hydro FacilityFriant, CA59.8 GWh14.7 mi
Gap Pacific Distribution CenterFresno, CA5.4 GWh17.8 mi
Madera 1 PVMadera, CA3.6 GWh13.9 mi
Madera Community HospitalMadera, CA72.0 MWh4.8 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.6 GWh1.8 mi
Saint Agnes Medical CenterFresno, CA29.8 GWh13 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh13.2 mi
SCCCD - Fresno Community CollegeFresno, CA3.8 GWh15 mi
Sealed Air Madera Solar ProjectMadera, CA6.1 GWh5.3 mi
Site 980 65Madera, CA4.9 GWh8.7 mi