Borden Solar Farm

13282 Road 33, Madera, CA 9363

Plant Summary Information

Borden Solar Farm is ranked #128 out of 854 solar farms in California in terms of total annual net electricity generation.

Borden Solar Farm generated 9.8 GWh during the 3-month period between November 2025 to February 2026.

Plant NameBorden Solar Farm
Utility Name41MB 8me, LLC
LocationMadera County, CA
Initial Operation DateJune 2020
Last Update Feb 2026
Annual Generation 107.4 GWh
Annual Consumption 389.8 k MMBtu
Ranked #3,357 out of 12,637 Power Plants Nationwide
Ranked #804 out of 6,487 Solar Power Plants Nationwide
Ranked #352 out of 1,603 California Power Plants
Ranked #128 out of 854 California Solar Power Plants
Fuel Types Solar

Map of Borden Solar Farm

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Borden Solar Farm.

Create Your Account Today

Monthly Net Generation for Borden Solar Farm

Monthly Plant Fuel Consumption for Borden Solar Farm

Borden Solar Farm Details

Summary Information
Plant NameBorden Solar Farm (59531)
Plant Address13282 Road 33, Madera, CA 9363
Utility41MB 8me, LLC (59272)
Latitude, Longitude36.94111, -119.96
Generation Dates on FileMay 2020 to Feb 2026
Initial Operation DateJune 2020
Annual Generation 107.4 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusNo
FERC Exempt Wholesale Generator StatusYes
FERC Exempt Wholesale Generator Docket NumberEG19-49-000
Regulatory Information
Regulatory StatusNon-Regulated
NERC RegionWECC
Balancing AuthorityCalifornia Independent System Operator (CISO)
NAICS CodeUtilities (22)
Sector IPP Non-CHP (2)
Water Source
Ash Impoundment No
Transmission / Distribution OwnerPacific Gas & Electric Co (14328) CA
Grid Voltage 69.00 kV
Energy StorageNo

Generator BRDN Details Operating June 2020

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity50 MW
Summer Capacity50 MW
Winter Capacity50 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateJune 2020
Combined Heat & Power No
Sector NameIPP Non-CHP (2)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Time From Cold Shutdown To Full Load10M
Multiple FuelsNo
Solar Details
Single Axis TrackingYes
Azimuth Angle180
DC Net Capacity67.8 MW
Crystalline SiliconNo
Other MaterialsYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Borden Solar Farm Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#794SEGS IXHinkley, CA112.0 GWh
#795Beacon Solar Plant Site 2Cantil, CA111.7 GWh
#796Sumrall II Solar FarmSumrall, MS111.2 GWh
#797Sundance Renewable Energy CenterLee, FL111.1 GWh
#798Midway Solar Farm 1Calipatria, CA110.4 GWh
#799Boulder Solar II, LLCBoulder City, NV110.4 GWh
#800RE Gaskell West 2 LLCRosamond, CA110.3 GWh
#801Wheatsborough SolarBellevue, OH110.1 GWh
#802Ocotillo WellsBorrego Springs, CA107.9 GWh
#803Envoy Solar, LLCMexico, MO107.9 GWh
#805Turquoise Nevada, LLCSparks, NV107.3 GWh
#806Little Bear 5Mendota, CA107.1 GWh
#807Castle Solar, LLCHuntington, UT106.9 GWh
#808Techren Solar VBoulder, NV106.9 GWh
#809Delta's Edge SolarGreenwood, MS106.9 GWh
#810Lick Creek Solar, LLCWalnut Cove, NC106.2 GWh
#811Salt Creek Township Solar, LLCMason City, IL105.8 GWh
#812Airport SolarLakeview, OR105.7 GWh
#813AES Maui Kuihelani Solar HybridWaikapu, HI103.6 GWh
#814Broad River Solar, LLCMooresboro, NC104.9 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Borden Solar Farm.

Plant NamePlant LocationAnnual GenerationDistance
Avenue 26 SolarChowchilla, CA4.5 GWh17.6 mi
CA - Madera USD - Madera South HSMadera, CA2.3 GWh5 mi
City of Madera WWTPMadera, CA1.4 GWh10.9 mi
Clovis High SchoolClovis, CA826.0 MWh17.6 mi
Clovis North High SchoolFresno, CA1.5 GWh12.8 mi
CSU Fresno Solar ProjectFresno, CA1.4 GWh15.1 mi
DGS Central California Womens FacilityChowchilla, CA3.8 GWh14.7 mi
DGS Valley State PrisonChowchilla, CA3.9 GWh15.4 mi
Fresno Bullard High School HybridFresno, CA2.1 GWh11.8 mi
Fresno Community SolarFresno, CA15.4 GWh17.4 mi
Fresno Hoover High School HybridFresno, CA2.0 GWh13.5 mi
Friant Hydro FacilityFriant, CA59.8 GWh14.7 mi
Madera 1 PVMadera, CA3.6 GWh13.9 mi
Madera Community HospitalMadera, CA72.0 MWh4.8 mi
Pacific Ethanol Madera Solar ArrayMadera, CA1.6 GWh1.8 mi
Saint Agnes Medical CenterFresno, CA33.6 GWh13 mi
SCCCD - Clovis Community CollegeFresno, CA2.0 GWh13.2 mi
SCCCD - Fresno Community CollegeFresno, CA2.8 GWh15 mi
Sealed Air Madera Solar ProjectMadera, CA6.1 GWh5.3 mi
Site 980 65Madera, CA4.9 GWh8.7 mi