CA Flats Solar 150, LLC
19855 E. Highway 41, Shandon, CA 93461Plant Summary Information
CA Flats Solar 150, LLC is ranked #66 out of 854 solar farms in California in terms of total annual net electricity generation.
CA Flats Solar 150, LLC generated 50.1 GWh during the 3-month period between November 2025 to February 2026.
| Plant Name | CA Flats Solar 150, LLC |
|---|---|
| Utility Name | Arevon Energy, Inc. |
| Location | San Luis Obispo County, CA |
| Initial Operation Date | February 2019 |
| Last Update | Feb 2026 |
| Annual Generation | 308.9 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,962 out of 12,637 Power Plants Nationwide | |
| Ranked #262 out of 6,487 Solar Power Plants Nationwide | |
| Ranked #173 out of 1,603 California Power Plants | |
| Ranked #66 out of 854 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
First Solar Project Development (2015 to 2015) First Solar Asset Management (2016 to 2016) CD Arevon USA, Inc. (2017 to 2021) Arevon Energy, Inc. (2022 to 2024) |
Map of CA Flats Solar 150, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for CA Flats Solar 150, LLC.
Monthly Net Generation for CA Flats Solar 150, LLC
Monthly Plant Fuel Consumption for CA Flats Solar 150, LLC
CA Flats Solar 150, LLC Details
| Summary Information | |
|---|---|
| Plant Name | CA Flats Solar 150, LLC (60034) |
| Plant Address | 19855 E. Highway 41, Shandon, CA 93461 |
| Utility | Arevon Energy, Inc. (61230) |
| Latitude, Longitude | 35.61557, -120.40435 |
| Generation Dates on File | Feb 2019 to Feb 2026 |
| Initial Operation Date | February 2019 |
| Annual Generation | 308.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co (14328) CA |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator GEN01 Details Operating February 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Summer Capacity | 150 MW |
| Winter Capacity | 150 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | February 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 201 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
CA Flats Solar 150, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #252 | Baldy Mesa Solar & Storage | Adelanto, CA | 309.9 GWh |
| #253 | Posey Solar | Mount Vernon, IN | 315.8 GWh |
| #254 | Green River Solar | Guston, KY | 315.7 GWh |
| #255 | American Kings Solar, LLC | Lemoore, CA | 315.1 GWh |
| #256 | Wolf Run Solar | Chapin, IL | 315.0 GWh |
| #257 | Storey Solar and Storage | Coolidge, AZ | 299.6 GWh |
| #258 | Quitman II Solar | Quitman, GA | 313.1 GWh |
| #259 | Edwards Sanborn E2 | Mojave, CA | 298.1 GWh |
| #260 | Unbridled Solar | Robards, KY | 312.5 GWh |
| #261 | Delilah Solar Energy II LLC | Bogota, TX | 309.6 GWh |
| #263 | Drew Solar LLC | Calexico, CA | 308.6 GWh |
| #264 | North Fork Solar Project | Snyder, OK | 305.9 GWh |
| #265 | Morris Ridge Solar | Mount Morris, NY | 305.5 GWh |
| #266 | Holstein 1 Solar Farm | Wingate, TX | 305.5 GWh |
| #267 | Fort Powhatan Solar | Disputanta, VA | 305.3 GWh |
| #268 | Washington County Solar | Sandersville, GA | 304.9 GWh |
| #269 | BT Hickerson Solar, LLC | Clifton, TX | 304.5 GWh |
| #270 | Nebula Solar | La Feria, TX | 304.4 GWh |
| #271 | SR DeSoto I, LLC | DeSoto, GA | 303.5 GWh |
| #272 | River Ferry Solar 1 | West Union, IL | 302.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding CA Flats Solar 150, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Atascadero State Hospital | Atascadero, CA | 2.8 GWh | 16.7 mi |
| Berrenda Mesa Water District | Lost Hills, CA | 16.5 GWh | 30.2 mi |
| CA Flats Solar 130, LLC | Shandon, CA | 263.0 GWh | 0 mi |
| CA-DGS-California Men's Colony | San Luis Obispo, CA | 4.6 GWh | 25.8 mi |
| Camp San Luis Obispo | San Luis Obispo, CA | 158.0 MWh | 27.4 mi |
| CED Avenal | Avenal, CA | 9.7 GWh | 29.9 mi |
| Coronal Lost Hills | Lost Hills, CA | 37.4 GWh | 29 mi |
| Firestone Walker Brewery - Phase 1 | Paso Robles, CA | 3.3 GWh | 16.3 mi |
| Meridian Vineyards | Paso Robles, CA | 1.0 GWh | 9.9 mi |
| Nacimiento Hydro Project | Bradley, CA | 18.2 GWh | 29.7 mi |
| Paso Robles - Municipal Airport | Paso Robles, CA | 6.0 GWh | 13.7 mi |
| Roll Lost Hills | Lost Hills, CA | 5.5 GWh | 29 mi |
| Sand Drag LLC | Avenal, CA | 28.2 GWh | 30.3 mi |
| Stenner Creek Solar | San Luis Obispo, CA | 9.5 GWh | 26 mi |
| Sun City Project LLC | Avenal, CA | 33.9 GWh | 30.3 mi |
| Sutter Home Winery TCC | Paso Robles, CA | 1.1 GWh | 17.8 mi |
| Topaz Solar Farm | Santa Margarita, CA | 1.0 TWh | 23.8 mi |
| Vintner Solar | Templeton, CA | 4.2 GWh | 16.1 mi |
| Wonderful Lost Hills | Lost Hills, CA | 48.2 GWh | 29.9 mi |
| Wonderful Orchards - West Valley | Blackwells Corner, CA | 1.4 GWh | 24.4 mi |