SEPV Sierra
450 West Avenue G, Lancaster, CA 93534Plant Summary Information
SEPV Sierra is ranked #413 out of 885 solar farms in California in terms of total annual net electricity generation.
SEPV Sierra generated 773.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | SEPV Sierra |
|---|---|
| Utility Name | SEPV Sierra, LLC |
| Location | Los Angeles County, CA |
| Initial Operation Date | April 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 5.4 GWh |
| Annual Consumption | 21.6 k MMBtu |
| Ranked #8,084 out of 13,081 Power Plants Nationwide | |
| Ranked #3,173 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,047 out of 1,606 California Power Plants | |
| Ranked #413 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of SEPV Sierra
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for SEPV Sierra.
Monthly Net Generation for SEPV Sierra
Monthly Plant Fuel Consumption for SEPV Sierra
SEPV Sierra Details
| Summary Information | |
|---|---|
| Plant Name | SEPV Sierra (64611) |
| Plant Address | 450 West Avenue G, Lancaster, CA 93534 |
| Utility | SEPV Sierra, LLC (64229) |
| Latitude, Longitude | 34.73301, -118.13853 |
| Generation Dates on File | Jan 2021 to Dec 2025 |
| Initial Operation Date | April 2020 |
| Annual Generation | 5.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | Yes |
Generator 1 Details Operating April 2020
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | LNCSTRC1_7_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | LNCSTRC1_7_N003 |
| Nameplate Capacity | 8.3 MW |
| Summer Capacity | 8.3 MW |
| Winter Capacity | 8.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | April 2020 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 3.4 |
|---|---|
| Maximum Charge Rate | 6 MW |
| Maximum Discharge Rate | 6 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 6 |
| Storage Enclosure Type | CS |
| Arbitrage | P |
| Ramping Spinning Reserve | Yes |
| Co Located Renewable Firming | Yes |
| Load Management | Yes |
| Voltage Or Reactive Power Support | Yes |
| Excess Wind And Solar Generation | Yes |
| DC Coupled | Yes |
| Direct Support Of Another Unit | No |
| Support T D Asset | No |
Generator 2 Details Operating April 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| RTO ISO LMP Node Designation | LNCSTRC1_7_N003 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | LNCSTRC1_7_N003 |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | April 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 3.1 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
SEPV Sierra Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #3163 | SSD Clackamas 1, LLC | Boring, OR | 6.1 GWh |
| #3164 | Dresser Hill CSG | Southbridge, MA | 6.1 GWh |
| #3165 | BKV-BPP Ponder Solar | Ponder, TX | 6.1 GWh |
| #3166 | TJX Phoenix | Phoenix, AZ | 6.1 GWh |
| #3167 | Whitakers Farm (Fisher Rd) | Whitakers, NC | 6.1 GWh |
| #3168 | Williams Rd | Ransomville, NY | 6.1 GWh |
| #3169 | Route 22 Community Solar Farm CSG | Plattsburgh, NY | 6.1 GWh |
| #3170 | Brattleboro (Windham Landfill) | Brattleboro, VT | 6.1 GWh |
| #3171 | Rak 2 | Fredonia, NY | 6.1 GWh |
| #3172 | North Kern 2 | City of Shafter, CA | 6.1 GWh |
| #3174 | GD Johnson Scituate I, LLC | Cranston, RI | 6.1 GWh |
| #3175 | Prescott Airport | Prescott, AZ | 6.1 GWh |
| #3176 | Acushnet AD Makepeace | Wareham, MA | 6.1 GWh |
| #3177 | Granite Peak Solar Plant | Milford, UT | 6.1 GWh |
| #3178 | NSF Danby Site 1, LLC | Ithaca, NY | 6.1 GWh |
| #3179 | Chisago Community Solar | Taylor Falls, MN | 6.1 GWh |
| #3180 | Clear Solar I, LLC | Forest City, NC | 6.1 GWh |
| #3181 | THD Baltimore DCs - 5829 Project Lion | Edgemere, MD | 6.1 GWh |
| #3182 | Dairy Farm | Anson, ME | 6.1 GWh |
| #3183 | GD Richmond Beaver River I LLC | Richmond, RI | 6.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding SEPV Sierra.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Antelope Expansion 1B | Lancaster, CA | 46.6 GWh | 6.9 mi |
| City of Rosamond (CA) | Rosamond, CA | 2.8 GWh | 7.1 mi |
| CSP Los Angeles | Lancaster, CA | 5.7 GWh | 5.7 mi |
| Division 1 | Lancaster, CA | 2.5 GWh | 1.8 mi |
| Division 2 | Lancaster, CA | 1.9 GWh | 1.8 mi |
| Division 3 | Lancaster, CA | 1.1 GWh | 1.8 mi |
| Foundation CDCR LAC | Lancaster, CA | 4.3 GWh | 5.5 mi |
| Green Beanworks D PV | Palmdale, CA | 6.3 GWh | 6.3 mi |
| Kettering Solar 1 | Lancaster, CA | 1.6 GWh | 2.4 mi |
| Kettering Solar 2 | Lancaster, CA | 1.5 GWh | 2.4 mi |
| Lancaster Baptist Church | Lancaster, CA | 1.2 GWh | 5.2 mi |
| Lancaster Solar 1 | Lancaster, CA | 2.4 GWh | 2.8 mi |
| Lancaster Solar 2 | Lancaster, CA | 2.1 GWh | 2.2 mi |
| Lancaster WAD B | Lancaster, CA | 7.2 GWh | 4.5 mi |
| Ma | Lancaster, CA | 1.8 GWh | 5 mi |
| Morgan Lancaster 1 | Lancaster, CA | 818.0 MWh | 5.9 mi |
| Rutan | Palmdale, CA | 3.0 GWh | 6.3 mi |
| Solar Oasis LLC | Palmdale, CA | 52.7 GWh | 6.8 mi |
| US-TOPCO (Soccer Center) | Lancaster, CA | 3.5 GWh | 6 mi |
| Vinam | Lancaster, CA | 3.0 GWh | 6.2 mi |