Blue Shld Of Cal- El Dorado Hlls Mtr B
4203 Town Center Blvd, El Dorado Hills, CA 95762Plant Summary Information
Blue Shld Of Cal- El Dorado Hlls Mtr B is ranked #595 out of 849 solar farms in California in terms of total annual net electricity generation.
Blue Shld Of Cal- El Dorado Hlls Mtr B generated 436.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Blue Shld Of Cal- El Dorado Hlls Mtr B |
|---|---|
| Utility Name | Tesla Inc. |
| Location | El Dorado County, CA |
| Initial Operation Date | July 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 2.8 GWh |
| Annual Consumption | 9.8 k MMBtu |
| Ranked #9,678 out of 12,539 Power Plants Nationwide | |
| Ranked #4,563 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,303 out of 1,600 California Power Plants | |
| Ranked #595 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Blue Shld Of Cal- El Dorado Hlls Mtr B
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Blue Shld Of Cal- El Dorado Hlls Mtr B.
Monthly Net Generation for Blue Shld Of Cal- El Dorado Hlls Mtr B
Blue Shld Of Cal- El Dorado Hlls Mtr B Details
| Summary Information | |
|---|---|
| Plant Name | Blue Shld Of Cal- El Dorado Hlls Mtr B (62077) |
| Plant Address | 4203 Town Center Blvd, El Dorado Hills, CA 95762 |
| Utility | Tesla Inc. (57313) |
| Latitude, Longitude | 38.65063, -121.07412 |
| Generation Dates on File | Jul 2019 to Dec 2024 |
| Initial Operation Date | July 2019 |
| Annual Generation | 2.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Balancing Authority of Northern California (BANC) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 36.60 kV |
| Energy Storage | No |
Generator PV1 Details Operating July 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 1.5 MW |
| Summer Capacity | 2.1 MW |
| Winter Capacity | 2.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 10 |
| DC Net Capacity | 2.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 1.1 MW |
| Virtual Net Metering Agreement | No |
Blue Shld Of Cal- El Dorado Hlls Mtr B Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Weisshorn Solar I, LLC | 6800 Dumbarton Circle, Fremont, CA 94555 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #4553 | Atascadero State Hospital | Atascadero, CA | 2.8 GWh |
| #4554 | CED Champaign Solar LLC | Champaign, IL | 2.8 GWh |
| #4555 | Dudley Solar CSG | Dudley, MA | 2.8 GWh |
| #4556 | Spruce - WCMD - Resh I | Hagerstown, MD | 2.8 GWh |
| #4557 | DG AMP Solar Jackson Center | Jackson Center, OH | 2.8 GWh |
| #4558 | Finger Lakes Solar I | Geneva, NY | 2.8 GWh |
| #4559 | BEMS East Solar (CSG) | Southhampton, NJ | 2.8 GWh |
| #4560 | Zonneveld Oak Grove | Laton, CA | 2.8 GWh |
| #4561 | Westminster | Westminster, VT | 2.8 GWh |
| #4562 | Titusville Solar | Titusville, NJ | 2.8 GWh |
| #4564 | Truck Stop | West Stockridge, MA | 2.8 GWh |
| #4565 | GMP Solar - Richmond | Richmond, VT | 2.8 GWh |
| #4566 | City of Rochester Solar | Rochester, NY | 2.8 GWh |
| #4567 | Radiance Solar 5 | Lancaster, CA | 2.8 GWh |
| #4568 | Deer Park | Deer Park, NY | 2.8 GWh |
| #4569 | Hopkinton CSG | Hopkinton, MA | 2.8 GWh |
| #4570 | Stone Hill Solar CSG | North Easton, MA | 2.8 GWh |
| #4571 | Walleye (Dunn 2) | Colefax, WI | 2.8 GWh |
| #4572 | Star City School District | Star City, AR | 2.8 GWh |
| #4573 | Musgrave East Solar Farm | Aurora, NY | 2.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Blue Shld Of Cal- El Dorado Hlls Mtr B.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Aerojet I | Rancho Cordova, CA | 5.1 GWh | 5.4 mi |
| Aerojet II | Rancho Cordova, CA | 3.8 GWh | 5.9 mi |
| Broadridge Cogen | El Dorado Hills, CA | 15.8 GWh | 2.4 mi |
| Deer Creek 2 | Shingle Springs, CA | 2.7 GWh | 5.1 mi |
| El Dorado County | Placerville, CA | 2.9 GWh | 13.7 mi |
| El Dorado Solar, LLC | El Dorado Hills, CA | 2.9 GWh | 1.2 mi |
| FAA NorCal TRACON | Mather AFB, CA | 1.6 GWh | 11.7 mi |
| Folsom | Folsom, CA | 509.9 GWh | 6 mi |
| Folsom SP and CSP Sacramento | Represa, CA | 2.3 GWh | 5.3 mi |
| Intel Folsom | Folsom, CA | 1.5 GWh | 5.3 mi |
| Intel Folsom Phase 2 | Folsom, CA | 1.5 GWh | 4.9 mi |
| Intel Folsom Phase 3 | Folsom, CA | 9.0 GWh | 4.8 mi |
| Kiefer Landfill | Sloughhouse, CA | 51.0 GWh | 11.5 mi |
| Newcastle | Auburn, CA | 7.5 GWh | 12.8 mi |
| Nimbus | Folsom, CA | 37.9 GWh | 7.9 mi |
| Rancho Cordova Medical Offices | Rancho Cordova, CA | 2.0 GWh | 12.8 mi |
| RE Dillard 1 LLC | Sloughhouse, CA | 6.0 GWh | 13.9 mi |
| RE Dillard 2 LLC | Sloughhouse, CA | 6.1 GWh | 13.9 mi |
| RE Dillard 3 LLC | Sloughhouse, CA | 6.1 GWh | 14.2 mi |
| SloughHouse Solar, LLC | SloughHouse, CA | 35.6 GWh | 14 mi |