Sutter Santa Rosa Solar
30 Mark West Springs Road, Santa Rosa, CA 95403Plant Summary Information
Sutter Santa Rosa Solar is ranked #624 out of 817 solar farms in California in terms of total annual net electricity generation.
Sutter Santa Rosa Solar generated 342.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Sutter Santa Rosa Solar |
---|---|
Utility Name | Sutter Santa Rosa Solar LLC |
Location | Sonoma County, CA |
Initial Operation Date | September 2019 |
Last Update | Dec 2024 |
Annual Generation | 2.3 GWh |
Annual Consumption | 7.9 k MMBtu |
Ranked #9,931 out of 12,299 Power Plants Nationwide | |
Ranked #4,770 out of 6,182 Solar Power Plants Nationwide | |
Ranked #1,338 out of 1,566 California Power Plants | |
Ranked #624 out of 817 California Solar Power Plants | |
Fuel Types | Solar |
Map of Sutter Santa Rosa Solar
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Sutter Santa Rosa Solar.
Monthly Net Generation for Sutter Santa Rosa Solar
Sutter Santa Rosa Solar Details
Summary Information | |
---|---|
Plant Name | Sutter Santa Rosa Solar (68440) |
Plant Address | 30 Mark West Springs Road, Santa Rosa, CA 95403 |
Utility | Sutter Santa Rosa Solar LLC (66794) |
Latitude, Longitude | 38.49453, -122.75199 |
Generation Dates on File | Jan 2024 to Dec 2024 |
Initial Operation Date | September 2019 |
Annual Generation | 2.3 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 19-1062-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | California Independent System Operator (CISO) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
Grid Voltage | 12.47 kV |
Energy Storage | No |
Generator 693 Details Operating September 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.3 MW |
Summer Capacity | 1.3 MW |
Winter Capacity | 1.3 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | September 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 5 |
DC Net Capacity | 1.7 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | Yes |
Net Metering DC Capacity | 1.7 MW |
Virtual Net Metering Agreement | No |
Sutter Santa Rosa Solar Plant Owners
Owner Name | Address | Ownership | |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#4760 | Corvias - Fort Riley II | Fort Riley, KS | 2.3 GWh |
#4761 | MNCPPC Randall Farm | Upper Marlboro, MD | 2.3 GWh |
#4762 | Whately Solar | Whately, MA | 2.3 GWh |
#4763 | MEBA | Easton, MD | 2.3 GWh |
#4764 | CBP Solar | Buchanan, NY | 2.3 GWh |
#4765 | Stearns Solar I | Albany, MN | 2.3 GWh |
#4766 | Washington St Community Solar Farm #4 | Ogden, NY | 2.3 GWh |
#4767 | 456 Lower | Minisink, NY | 2.3 GWh |
#4768 | Santa Fe Springs Rooftop Solar BLDG H | Santa Fe Springs, CA | 2.3 GWh |
#4769 | Buidling L | Santa Fe Springs, CA | 2.3 GWh |
#4771 | COU Solar I, LLC | Lisbon, NY | 2.3 GWh |
#4772 | County of San Diego SBRC | Chula Vista, CA | 2.3 GWh |
#4773 | General Electric Aircraft Engines | Lynn, MA | 2.3 GWh |
#4774 | Chatham Landfill | Chatham, MA | 2.3 GWh |
#4775 | Munson-DS&O | Junction City, KS | 2.3 GWh |
#4776 | Arrache 4006 | Palmdale, CA | 2.3 GWh |
#4777 | 5601 Westside CDG | North Bergen, NJ | 2.3 GWh |
#4778 | Sue Cleveland High School | Rio Rancho, NM | 2.3 GWh |
#4779 | Hewlett-Packard (HP) - Andover, MA | Andover, MA | 2.3 GWh |
#4780 | Acushnet-Braley Road 1 | Freetown, MA | 2.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Sutter Santa Rosa Solar.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
ASTI | Cloverdale, CA | 1.2 GWh | 22 mi |
Beringer | Saint Helena, CA | 1.3 GWh | 14.8 mi |
Bodega Avenue Solar LLC | Petaluma, CA | 4.5 GWh | 16.1 mi |
Calistoga Power Plant | Middletown, CA | 467.6 GWh | 20.3 mi |
Cloverdale Solar Center | Cloverdale, CA | 2.1 GWh | 23.9 mi |
Cloverdale Solar I | Cloverdale, CA | 2.2 GWh | 24 mi |
Dissigno Healdsburg FPV, LLC | Healdsburg, CA | 5.9 GWh | 8.8 mi |
Geothermal 1 | Middletown, CA | 402.6 GWh | 17.9 mi |
Geothermal 2 | Middletown, CA | 303.9 GWh | 17.7 mi |
Geysers Unit 5-20 | Middletown, CA | 4.4 TWh | 19.5 mi |
Keysight - Santa Rosa | Santa Rosa, CA | 12.8 GWh | 2.4 mi |
Laguna Water Reclamation Facility | Santa Rosa, CA | 11.2 GWh | 8.7 mi |
Lavio Solar | Petaluma, CA | 1.7 GWh | 21.3 mi |
Santa Rosa Junior College Petaluma Solar | Petaluma, CA | 1.8 GWh | 2.4 mi |
Sonoma California Geothermal | Middletown, CA | 447.6 GWh | 20.4 mi |
Sonoma Central Landfill Phase I | Petaluma, CA | 5.6 GWh | 13.3 mi |
Sonoma Central Landfill Phase II | Petaluma, CA | 5.0 GWh | 13.3 mi |
Stage Gulch Solar | Petaluma, CA | 1.5 GWh | 22.3 mi |
West Ford Flat | Middletown, CA | 696.0 MWh | 20.4 mi |
Windsor Floating Solar | Windsor, CA | 2.5 GWh | 4.6 mi |