Carlsbad Energy Center
4950 Avendia Encinas, Carlsbad, CA 92008Plant Summary Information
Carlsbad Energy Center is ranked #53 out of 316 natural gas power plants in California in terms of total annual net electricity generation.
Carlsbad Energy Center is comprised of 5 generators and generated 47.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Carlsbad Energy Center |
|---|---|
| Utility Name | NRG California Peaker Operations LLC |
| Location | San Diego County, CA |
| Initial Operation Date | December 2018 |
| Last Update | May 2026 |
| Annual Generation | 195.0 GWh |
| Annual Consumption | 2.2 M MMBtu |
| Ranked #2,570 out of 13,081 Power Plants Nationwide | |
| Ranked #759 out of 2,206 Natural Gas Power Plants Nationwide | |
| Ranked #265 out of 1,606 California Power Plants | |
| Ranked #53 out of 316 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Carlsbad Energy Center (2013 to 2017) NRG California Peaker Operations LLC (2018 to 2025) |
Map of Carlsbad Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carlsbad Energy Center.
Monthly Net Generation for Carlsbad Energy Center
Monthly Plant Fuel Consumption for Carlsbad Energy Center
Carlsbad Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Carlsbad Energy Center (59002) |
| Plant Address | 4950 Avendia Encinas, Carlsbad, CA 92008 |
| Utility | NRG California Peaker Operations LLC (58847) |
| Latitude, Longitude | 33.14051, -117.33392 |
| Generation Dates on File | Jun 2018 to May 2026 |
| Initial Operation Date | December 2018 |
| Annual Generation | 195.0 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 138.00 kV / 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
| Natural Gas Storage | No |
Generator CEC 6 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 7 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 8 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 9 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC10 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS2_1_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS2_1_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Carlsbad Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 6 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 7 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 8 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 9 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC10 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #749 | Concord | Watertown, WI | 203.4 GWh |
| #750 | Petra Nova Carbon Capture Cogen | Thompsons, TX | 200.5 GWh |
| #751 | Tesoro SLC Cogeneration Plant | Salt Lake City, UT | 199.9 GWh |
| #752 | Georgia-Pacific Brewton Mill | Brewton, AL | 422.9 GWh |
| #753 | Syl Laskin | Hoyt Lakes, MN | 196.3 GWh |
| #754 | WestRock-West Point Mill | West Point, VA | 528.8 GWh |
| #755 | Mead Coated Board | Mahrt, AL | 726.9 GWh |
| #756 | Tropicana Products Bradenton | Bradenton, FL | 195.4 GWh |
| #757 | Lake Charles Polymers | Westlake, LA | 195.3 GWh |
| #758 | Dansby | Bryan, TX | 195.2 GWh |
| #760 | Arsenal Hill | Shreveport, LA | 192.1 GWh |
| #761 | Gadsby | Salt Lake City, UT | 191.3 GWh |
| #762 | Reeves | Albuquerque, NM | 190.9 GWh |
| #763 | International Paper Savanna Mill | Savannah, GA | 633.3 GWh |
| #764 | Canal | Sandwich, MA | 546.2 GWh |
| #765 | Fountain Valley Power Facility | Fountain, CO | 188.2 GWh |
| #766 | NAEA Ocean Peaking Power LLC | Lakewood, NJ | 188.2 GWh |
| #767 | Ada Cogeneration LP | Ada, MI | 184.9 GWh |
| #768 | A.J. Mihm Generating Station | Pelkie, MI | 184.5 GWh |
| #769 | Shelby Energy County | Neoga, IL | 183.9 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carlsbad Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Bear Valley | Escondido, CA | 2.7 GWh | 18.4 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 2.2 GWh | 12.6 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.3 GWh | 1.8 mi |
| Escondido Energy Center | Escondido, CA | 3.2 GWh | 12.6 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 19.5 GWh | 5.3 mi |
| Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh | 5.3 mi |
| Gilead Oceanside Solar Project | Oceanside, CA | 952.0 MWh | 5.3 mi |
| Goal Line LP | Escondido, CA | 11.7 GWh | 13.6 mi |
| Kilroy Solar | San Diego, CA | 6.3 GWh | 15.3 mi |
| Legoland CA Phase I | Carlsbad, CA | 1.4 GWh | 1.8 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 2.7 mi |
| NLP Granger | Valley Center, CA | 4.5 GWh | 18.3 mi |
| Palomar Energy | Escondido, CA | 1.3 TWh | 12.6 mi |
| San Diego - NCRC at Vista | Vista, CA | 2.8 GWh | 5.7 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.6 GWh | 10.6 mi |
| Univ of California San Diego Solar | La Jolla, CA | 3.8 GWh | 19.2 mi |
| University of California San Diego Hybri | La Jolla, CA | 232.1 GWh | 19.2 mi |
| Vallecitos Water District | San Marcos, CA | 2.8 GWh | 10.3 mi |
| W Plant | San Diego, CA | 18.4 GWh | 18.2 mi |
| Watkins Manufacturing Co. | San Diego, CA | 7.6 GWh | 5.6 mi |