Carlsbad Energy Center
4950 Avendia Encinas, Carlsbad, CA 92008Plant Summary Information
Carlsbad Energy Center is ranked #53 out of 342 natural gas power plants in California in terms of total annual net electricity generation.
Carlsbad Energy Center is comprised of 5 generators and generated 20.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Carlsbad Energy Center |
|---|---|
| Utility Name | NRG California Peaker Operations LLC |
| Location | San Diego County, CA |
| Initial Operation Date | December 2018 |
| Last Update | Dec 2025 |
| Annual Generation | 216.2 GWh |
| Annual Consumption | 2.4 M MMBtu |
| Ranked #2,388 out of 12,613 Power Plants Nationwide | |
| Ranked #718 out of 2,246 Natural Gas Power Plants Nationwide | |
| Ranked #254 out of 1,603 California Power Plants | |
| Ranked #53 out of 342 California Natural Gas Power Plants | |
| Fuel Types | Natural Gas |
| Previous Operator |
Carlsbad Energy Center (2013 to 2017) NRG California Peaker Operations LLC (2018 to 2024) |
Map of Carlsbad Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Carlsbad Energy Center.
Monthly Net Generation for Carlsbad Energy Center
Monthly Plant Fuel Consumption for Carlsbad Energy Center
Carlsbad Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Carlsbad Energy Center (59002) |
| Plant Address | 4950 Avendia Encinas, Carlsbad, CA 92008 |
| Utility | NRG California Peaker Operations LLC (58847) |
| Latitude, Longitude | 33.14051, -117.33392 |
| Generation Dates on File | Jun 2018 to Dec 2025 |
| Initial Operation Date | December 2018 |
| Annual Generation | 216.2 GWh |
| Fuel Types | Natural Gas |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | Municipality |
| Ash Impoundment | No |
| Transmission / Distribution Owner | San Diego Gas & Electric Co (16609) CA |
| Grid Voltage | 138.00 kV / 230.00 kV |
| Energy Storage | No |
| Natural Gas Information | |
| Local Distribution Company (LDC) | SAN DIEGO GAS AND ELECTRIC COMPANY |
| Natural Gas Storage | No |
Generator CEC 6 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 7 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 8 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC 9 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS1_2_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS1_2_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Generator CEC10 Details Operating December 2018
| Technology | Natural Gas Fired Combustion Turbine |
|---|---|
| Prime Mover | Combustion Turbine |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | CARLS2_1_CARCT1 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | CARLS2_1_CARCT1 |
| Nameplate Capacity | 131.8 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 105.5 MW |
| Winter Capacity | 105.5 MW |
| Minimum Load | 24 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | December 2018 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Natural Gas |
| Startup Source | Natural Gas |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
Carlsbad Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 6 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 7 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 8 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC 9 | 100.00% |
| Carlsbad Energy Center LLC | 4950 Avendia Encinas, Carlsbad, CA 92008 | Generator CEC10 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #708 | Whitehorn | Blaine, WA | 230.3 GWh |
| #709 | Dickerson Power | Dickerson, MD | 237.2 GWh |
| #710 | Georgia-Pacific Brewton Mill | Brewton, AL | 499.4 GWh |
| #711 | Cornell University Central Heat | Ithaca, NY | 222.4 GWh |
| #712 | Georgia-Pacific Monticello Paper | Monticello, MS | 550.2 GWh |
| #713 | El Dorado Refinery | El Dorado, KS | 220.4 GWh |
| #714 | Ingredion Incorporated | Bedford Park, IL | 219.6 GWh |
| #715 | Kimberly Clark-Unit 1,2,3 | New Milford, CT | 219.0 GWh |
| #716 | Sycamore Cogeneration | Bakersfield, CA | 218.9 GWh |
| #717 | Elm Road Generating Station | Oak Creek, WI | 7.4 TWh |
| #719 | Calvert City | Calvert City, KY | 215.8 GWh |
| #720 | University of Michigan | Ann Arbor, MI | 213.0 GWh |
| #721 | Central Utility Plant Cincinnati | Cincinnati, OH | 214.5 GWh |
| #722 | Dahlberg | Nicholson, GA | 229.4 GWh |
| #723 | Charles D. Lamb Energy Center | Ponca City, OK | 211.8 GWh |
| #724 | UCLA So Campus Cogen Project | Los Angeles, CA | 211.2 GWh |
| #725 | Perryman | Harford County, MD | 250.8 GWh |
| #726 | Atlantic Alumina, Gramercy Operations | Gramercy, LA | 208.1 GWh |
| #727 | Limon Generating Station | Limon, CO | 216.3 GWh |
| #728 | Roquette America | Keokuk, IA | 207.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Carlsbad Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AT&T San Diego | San Diego, CA | 3.5 GWh | 18.1 mi |
| Bear Valley | Escondido, CA | 4.2 GWh | 18.4 mi |
| CalPeak Power Enterprise Peaker Plant | Escondido, CA | 6.1 GWh | 12.6 mi |
| Encina Water Pollution Control | Carlsbad, CA | 14.3 GWh | 1.8 mi |
| Escondido Energy Center | Escondido, CA | 9.4 GWh | 12.6 mi |
| GEN005 Antibody Fuel Cell | Oceanside, CA | 20.6 GWh | 5.3 mi |
| Genentech-Oceanside Hybrid | Oceanside, CA | 3.6 GWh | 5.3 mi |
| Gilead Oceanside Solar Project | Oceanside, CA | 2.4 GWh | 5.3 mi |
| Goal Line LP | Escondido, CA | 8.3 GWh | 13.6 mi |
| Kilroy Solar | San Diego, CA | 6.2 GWh | 15.3 mi |
| Life Technologies Carlsbad | Carlsbad, CA | 8.6 GWh | 2.7 mi |
| NLP Granger | Valley Center, CA | 4.8 GWh | 18.3 mi |
| P Plant | San Diego, CA | 30.5 GWh | 18.7 mi |
| Palomar Energy | Escondido, CA | 1.5 TWh | 12.6 mi |
| Q Plant | San Diego, CA | 66.0 MWh | 18.1 mi |
| San Diego - NCRC at Vista | Vista, CA | 2.9 GWh | 5.7 mi |
| SDCWA - Twin Oaks | San Marcos, CA | 1.3 GWh | 10.6 mi |
| Vallecitos Water District | San Marcos, CA | 3.2 GWh | 10.3 mi |
| W Plant | San Diego, CA | 27.8 GWh | 18.2 mi |
| Watkins Manufacturing Co. | San Diego, CA | 7.4 GWh | 5.6 mi |