Centinela State Prison
2302 Brown Rd, Sacramento, CA 92251Plant Summary Information
Centinela State Prison is ranked #282 out of 849 solar farms in California in terms of total annual net electricity generation.
Centinela State Prison generated 3.0 GWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Centinela State Prison |
|---|---|
| Utility Name | Ecoplexus, Inc |
| Location | Imperial County, CA |
| Initial Operation Date | December 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 16.7 GWh |
| Annual Consumption | 60.1 k MMBtu |
| Ranked #5,494 out of 12,539 Power Plants Nationwide | |
| Ranked #1,506 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #738 out of 1,600 California Power Plants | |
| Ranked #282 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Centinela State Prison
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Centinela State Prison.
Monthly Net Generation for Centinela State Prison
Centinela State Prison Details
| Summary Information | |
|---|---|
| Plant Name | Centinela State Prison (64519) |
| Plant Address | 2302 Brown Rd, Sacramento, CA 92251 |
| Utility | Ecoplexus, Inc (58970) |
| Latitude, Longitude | 32.82583, -115.78292 |
| Generation Dates on File | Jan 2020 to Dec 2024 |
| Initial Operation Date | December 2019 |
| Annual Generation | 16.7 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF18-1603-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Imperial Irrigation District (IID) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Imperial Irrigation District (9216) CA |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator CENSP Details Operating December 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 6 MW |
| Summer Capacity | 6 MW |
| Winter Capacity | 6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| East West Fixed Tilt | Yes |
| Azimuth Angle | 180 |
| Tilt Angle | 52 |
| DC Net Capacity | 8.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Centinela State Prison Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1496 | Shorthorn Holdings | McColl, SC | 16.9 GWh |
| #1497 | Phantom Solar | Fort Hood, TX | 16.9 GWh |
| #1498 | L&D Landfill Solar | Mt. Holly, NJ | 16.8 GWh |
| #1499 | Dix Solar, L.L.C | Browns Mills, NJ | 16.8 GWh |
| #1500 | Adams PV Plant | Adams, WI | 16.8 GWh |
| #1501 | Tracy Solar | Bailey, NC | 16.8 GWh |
| #1502 | Anderson 3 | Anderson, IN | 16.8 GWh |
| #1503 | Brighter Future Solar | Granite Falls, NC | 16.8 GWh |
| #1504 | Northern Cardinal Solar SCS IL 1, LLC | Champaign, IL | 16.7 GWh |
| #1505 | Cinnaminson Landfill Solar | Cinnaminson, NJ | 16.7 GWh |
| #1507 | Eddy II | Eddy, TX | 16.6 GWh |
| #1508 | Gaston Solar I - SC | Gaston, SC | 16.6 GWh |
| #1509 | Pittsfield Solar LLC | Pittsfield, ME | 16.5 GWh |
| #1510 | Calipatria State Prison | Calipatria, CA | 16.5 GWh |
| #1511 | Berrenda Mesa Water District | Lost Hills, CA | 16.5 GWh |
| #1512 | Bovine | Wallis, TX | 16.5 GWh |
| #1513 | Ash Mesa Solar, LLC | Olathe, CO | 16.4 GWh |
| #1514 | TPE Whitney Solar, LLC | Kopperl, TX | 16.3 GWh |
| #1515 | Sierra Pacific Industries (2042-RD) | Red Bluff, CA | 16.3 GWh |
| #1516 | Bronson Solar | Bronson, FL | 16.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Centinela State Prison.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Campo Verde Solar | El Centro, CA | 294.7 GWh | 6 mi |
| Centinela Solar Energy | Calexico, CA | 352.7 GWh | 12.4 mi |
| Drew Solar LLC | Calexico, CA | 309.4 GWh | 11.8 mi |
| El Centro Hybrid | El Centro, CA | 1.1 TWh | 14.2 mi |
| Heber Solar | Heber, CA | 24.6 GWh | 16.1 mi |
| Imperial Solar Energy Center South | Calexico, CA | 264.3 GWh | 13.4 mi |
| Imperial Solar Energy Center West | Seeley, CA | 373.6 GWh | 3.7 mi |
| Imperial Valley Solar, LLC | Calexico, CA | 443.5 GWh | 15.6 mi |
| IVC Solar | Imperial, CA | 4.2 GWh | 16 mi |
| Mount Signal Solar Farm II | Calexico, CA | 410.2 GWh | 14.1 mi |
| Mount Signal Solar Farm V | Calexico, CA | 673.8 GWh | 16.1 mi |
| Ocotillo Express LLC | Ocotillo, CA | 461.7 GWh | 16 mi |
| SEPV Imperial Dixieland East | Imperial, CA | 4.2 GWh | 2.4 mi |
| SEPV Imperial Dixieland West | Imperial, CA | 7.8 GWh | 2.2 mi |
| Sol Orchard El Centro PV | El Centro, CA | 47.1 GWh | 13.8 mi |
| Spreckels Sugar Company | Brawley, CA | 19.9 GWh | 13.8 mi |
| USG 1 | El Centro, CA | 3.0 GWh | 4.9 mi |
| USG 2 | El Centro, CA | 2.0 GWh | 5.3 mi |
| Valencia 3 | Imperial, CA | 6.6 GWh | 14.8 mi |
| Wistaria Ranch Solar | Calexico, CA | 288.9 GWh | 14.1 mi |