Solar Star Palo Alto I, LLC
1501 Page Mill Road, Palo Alto, CA 94304Plant Summary Information
Solar Star Palo Alto I, LLC is ranked #684 out of 849 solar farms in California in terms of total annual net electricity generation.
Solar Star Palo Alto I, LLC generated 319.0 MWh during the 3-month period between September 2024 to December 2024.
| Plant Name | Solar Star Palo Alto I, LLC |
|---|---|
| Utility Name | DG 1 Acquisition Co., LLC |
| Location | Santa Clara County, CA |
| Initial Operation Date | August 2019 |
| Last Update | Dec 2024 |
| Annual Generation | 2.0 GWh |
| Annual Consumption | 7.1 k MMBtu |
| Ranked #10,469 out of 12,539 Power Plants Nationwide | |
| Ranked #5,247 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #1,404 out of 1,600 California Power Plants | |
| Ranked #684 out of 849 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Solar Star Palo Alto I, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Solar Star Palo Alto I, LLC.
Monthly Net Generation for Solar Star Palo Alto I, LLC
Solar Star Palo Alto I, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Solar Star Palo Alto I, LLC (62732) |
| Plant Address | 1501 Page Mill Road, Palo Alto, CA 94304 |
| Utility | DG 1 Acquisition Co., LLC (62648) |
| Latitude, Longitude | 37.41101, -122.14886 |
| Generation Dates on File | Aug 2019 to Dec 2024 |
| Initial Operation Date | August 2019 |
| Annual Generation | 2.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | City of Palo Alto - (CA) (14401) CA |
| Grid Voltage | 13.70 kV |
| Energy Storage | No |
Generator SSPAI Details Operating August 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | August 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 85 |
| Tilt Angle | 10 |
| DC Net Capacity | 1.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | Yes |
| Virtual Net Metering DC Capacity | 1.5 MW |
Solar Star Palo Alto I, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5237 | WEA Texas Bayonne | Bayonne, NJ | 2.0 GWh |
| #5238 | FastSun 10 CSG | Zumbrota, MN | 2.0 GWh |
| #5239 | USS Wildcat Solar LLC | Goodhue, MN | 2.0 GWh |
| #5240 | Bloomfield Municipal Utilities Solar | Bloomfield, IA | 2.0 GWh |
| #5241 | FastSun 9 CSG | Zumbrota, MN | 2.0 GWh |
| #5242 | WED Kingstown Solar I, LLC - West | Richmond, RI | 2.0 GWh |
| #5243 | Primrose Solar, LLC | Mankato, MN | 2.0 GWh |
| #5244 | T Luhman CSG | Zumbrota, MN | 2.0 GWh |
| #5245 | Ventura | Dartmouth, MA | 1.8 GWh |
| #5246 | USS Bluff Country Solar CSG | Altura, MN | 2.0 GWh |
| #5248 | USS Solar Dawn CSG | North Branch, MN | 2.0 GWh |
| #5249 | Houghton | Houghton, NY | 2.0 GWh |
| #5250 | MN Buffalo Lake 212-2 LLC (CSG) | Buffalo Lake, MN | 2.0 GWh |
| #5251 | Vulcraft Solar | Chemung, NY | 2.0 GWh |
| #5252 | Capital Hill Solar LLC | Albany, NY | 2.0 GWh |
| #5253 | ACCP NJ 1 | Hopatcong, NJ | 2.0 GWh |
| #5254 | Port Reading 8 Solar | Carteret, NJ | 2.0 GWh |
| #5255 | Holliston LLC | Holliston, MA | 2.0 GWh |
| #5256 | USS Big Lake 1 Solar CSG | Big Lake, MN | 2.0 GWh |
| #5257 | USS Kasch Solar CSG | Sauk Rapids, MN | 2.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Solar Star Palo Alto I, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| AGT000 Stevens Creek Fuel Cell | Santa Clara, CA | 7.6 GWh | 10.2 mi |
| APP Prune A-D | Cupertino, CA | 27.1 GWh | 9.5 mi |
| Apple Campus 2 Fuel Cell | Cupertino, CA | 29.6 GWh | 9.5 mi |
| Apple Campus 2 PV | Cupertino, CA | 17.4 GWh | 9.5 mi |
| AT&T - Redwood City | Redwood City, CA | 5.6 GWh | 5.6 mi |
| City of Palo Alto | Palo Alta, CA | 20.6 MWh | 2.9 mi |
| Equinix Caspian Dr. Fuel Cell | Sunnyvale, CA | 38.3 GWh | 5.3 mi |
| EQX011 Duane Fuel Cell | Santa Clara, CA | 22.5 GWh | 10.9 mi |
| Gianera | Santa Clara, CA | 6.2 GWh | 9.9 mi |
| Google Moffett Park Solar Project | Sunnyvale, CA | 2.6 GWh | 7.2 mi |
| Intel Santa Clara | Santa Clara, CA | 7.7 GWh | 10.3 mi |
| JSR000 N Mathilda Fuel Cell | Sunnyvale, CA | 9.2 GWh | 6.9 mi |
| Juniper Networks Sunnyvale | Sunnyvale, CA | 3.9 GWh | 6.7 mi |
| Mission College Blvd. Fuel Cell | Santa Clara, CA | 39.9 GWh | 10.4 mi |
| Silicon Valley Clean Water | Redwood City, CA | 7.0 GWh | 10.2 mi |
| SRI International Cogen Project | Menlo Park, CA | 23.4 GWh | 3.3 mi |
| Stanford Campus Solar | Stanford, CA | 5.9 GWh | 1.7 mi |
| Sunnyvale City of WPCP | Sunnyvale, CA | 9.5 GWh | 7.4 mi |
| Yahoo! - HQ | Sunnyvale, CA | 3.0 GWh | 6.8 mi |
| Zero Waste Energy Development Co LLC | San Jose, CA | 1.8 GWh | 10.9 mi |