| Speedway North Bldg 1-sllas701 | Prologis Logistics Services Incorporated | Las Vegas, NV | 582 MWh | Jun 2023 | Dec 2025 |
Solar
|
| IKEA Las Vegas 462 | IKEA Property Inc | Las Vegas, NV | 2 GWh | Apr 2016 | Dec 2025 |
Solar
|
| IGS VGT | Altus Power America Management, LLC | North Las Vegas, NV | 2 GWh | Oct 2023 | Dec 2025 |
Solar
|
| IGS LAS1 | Altus Power America Management, LLC | Henderson, NV | 2 GWh | Jun 2023 | Dec 2025 |
Solar
|
| TJX Las Vegas | SoCore Energy LLC | North Las Vegas, NV | 2 GWh | Jan 2019 | Dec 2025 |
Solar
|
| Dignity - Siena Campus | MN8 Energy LLC | Henderson, NV | 3 GWh | Apr 2018 | Dec 2025 |
Solar
|
| NV - Nokomis - CHI | CHI NV Solar LLC | Mesquite, NV | 3 GWh | May 2025 | Dec 2025 |
Solar
|
| Dignity - San Martin | MN8 Energy LLC | Las Vegas, NV | 4 GWh | Apr 2018 | Dec 2025 |
Solar
|
| Solar Las Vegas MB 2, LLC | NRG Solar Las Vegas MB 2 | Las Vegas, NV | 5 GWh | Jun 2016 | Dec 2024 |
Solar
|
| Las Vegas WPCF Solar Plant | City of Las Vegas - (NV) | Las Vegas, NV | 5 GWh | Apr 2013 | Dec 2025 |
Solar
|
| Tesla Reno GigaFactory | Tesla Inc. | Sparks, NV | 5 GWh | May 2019 | Dec 2025 |
Solar
|
| Ft. Churchill PV | Sierra Pacific Power Co | Yerington, NV | 7 GWh | Apr 2015 | Dec 2025 |
Solar
|
| Lahontan | Truckee-Carson Irrigation District | Fallon, NV | 8 GWh | Dec 1910 | Sep 2025 |
Water
|
| Turquoise Liberty Solar | Liberty Utilities (CalPeco Electric) LLC | Sparks, NV | 8 GWh | Oct 2019 | Dec 2025 |
Solar
|
| Nellis Solar PV II | Nevada Power Co | North Las Vegas, NV | 9 GWh | Oct 2015 | May 2026 |
Solar
|
| Goodsprings Waste Heat Recovery | Nevada Power Co | Jean, NV | 9 GWh | Oct 2010 | May 2026 |
Waste Heat
|
| Solar Las Vegas MB-1 | NRG Solar Las Vegas MB-1 | Las Vegas, NV | 9 GWh | Jan 2015 | Dec 2025 |
Solar
|
| New Lahontan | Truckee-Carson Irrigation District | Fallon, NV | 12 GWh | Mar 1989 | Nov 2025 |
Water
|
| Stampede | U S Bureau of Reclamation | Truckee, CA | 12 GWh | Dec 1987 | May 2026 |
Water
|
| Washoe | Truckee Meadows Water Authority | Verdi, NV | 15 GWh | Dec 1903 | Dec 2025 |
Water
|
| Whitegrass No. 1 | Open Mountain Energy LLC. | Yerington, NV | 17 GWh | Sep 2018 | Dec 2025 |
Geothermal
|
| Verdi | Truckee Meadows Water Authority | Verdi, NV | 20 GWh | Dec 1910 | May 2026 |
Water
|
| Fleish | Truckee Meadows Water Authority | Fleish, NV | 21 GWh | Dec 1913 | May 2026 |
Water
|
| Nellis Air Force Base Solar Array | Solar Star NAFB LLC | Las Vegas, NV | 23 GWh | Sep 2007 | Dec 2025 |
Solar
|
| Stillwater Solar PV II | Ormat Stillwater Solar PV II, LLC | Fallon, NV | 25 GWh | May 2018 | Jun 2025 |
Solar
|
| Galena 2 Geothermal Power Plant | Ormat Nevada Inc | Reno, NV | 25 GWh | Mar 2007 | Dec 2025 |
Geothermal
|
| Waste Management Lockwood LFGTE | WM Renewable Energy LLC | Sparks, NV | 25 GWh | Feb 2012 | Dec 2025 |
Landfill Gas
|
| Republic Services Renewable Energy, LLC | Republic Services Renewable Energy, LLC | Las Vegas, NV | 26 GWh | Feb 2012 | Dec 2025 |
Landfill Gas
|
| Sun Peak Generating Station | Nevada Power Co | Las Vegas, NV | 30 GWh | May 1991 | Dec 2025 |
Natural Gas
|
| River Mountains Solar | River Mountains Solar, LLC | Henderson, NV | 31 GWh | Dec 2015 | Dec 2025 |
Solar
|
| MDU / NVSS-II | Greenbacker Renewable Energy Corporation | Pahrump, NV | 32 GWh | Jan 2017 | Dec 2025 |
Solar
|
| Searchlight Solar | Altus Power America Management, LLC | Searchlight, NV | 41 GWh | Nov 2014 | Dec 2025 |
Solar
|
| Star Peak Geothermal Plant | Star Peak Geothermal LLC. | Imlay, NV | 43 GWh | Jul 2022 | Dec 2025 |
Geothermal
|
| Apex Solar PV Power Project | Southern Power Co | North Las Vegas, NV | 48 GWh | Jun 2012 | Dec 2025 |
Solar
|
| Mountain View Solar | NextEra Energy Mountain View Solar | North Las Vegas, NV | 52 GWh | Dec 2013 | May 2026 |
Solar
|
| Techren Solar III LLC | Techren Solar III LLC | Boulder, NV | 53 GWh | Sep 2020 | May 2026 |
Solar
|
| Techren Solar IV LLC | Techren Solar IV LLC | Boulder, NV | 55 GWh | Sep 2020 | May 2026 |
Solar
|
| Jersey Valley Geothermal Power Plant | Ormat Nevada Inc | Imlay, NV | 58 GWh | Nov 2010 | Dec 2025 |
Geothermal
|
| Steamboat II | Steamboat Development Corp | Reno, NV | 62 GWh | Jul 1992 | Dec 2025 |
Geothermal
|
| CityCenter Central Plant Cogen Units | CityCenter Land LLC | Las Vegas, NV | 62 GWh | Nov 2009 | May 2026 |
Natural Gas
|
| Salt Wells | Ormat Salt Wells LLC | Fallon, NV | 63 GWh | Feb 2009 | Dec 2025 |
Geothermal
|
| Steamboat III | Steamboat Development Corp | Reno, NV | 73 GWh | Sep 1992 | Dec 2025 |
Geothermal
|
| San Emidio | USG Nevada LLC | Gerlach, NV | 76 GWh | Apr 2012 | Dec 2025 |
Geothermal
|
| Galena 3 Geothermal Power Plant | Ormat Nevada Inc | Reno, NV | 78 GWh | Jan 2008 | Dec 2025 |
Geothermal
|
| Desert Peak Power Plant | Ormat Nevada Inc | Fernley, NV | 78 GWh | May 2006 | Dec 2025 |
Geothermal
|
| Spectrum Solar PV Power Project | Southern Power Co | Las Vegas, NV | 82 GWh | Aug 2013 | Dec 2025 |
Solar
|
| Brady | Ormat Nevada Inc | Fallon, NV | 83 GWh | May 1992 | Dec 2025 |
Geothermal
|
| Don A Campbell 2 Geothermal | ORNI 37 LLC | Luning, NV | 89 GWh | Aug 2015 | Dec 2025 |
Geothermal
|
| Richard Burdette Geothermal | Ormat Nevada Inc | Reno, NV | 89 GWh | Oct 2005 | Dec 2025 |
Geothermal
|
| Stillwater Facility | Ormat Stillwater LLC | Fallon, NV | 91 GWh | Feb 2009 | Dec 2025 |
Geothermal : 58.1%
Solar : 41.9%
|
| Nevada Solar One | Acciona Solar Power | Boulder City, NV | 96 GWh | May 2007 | May 2026 |
Solar : 98.6%
Natural Gas : 1.4%
|
| Crescent Dunes Solar Energy | Tonopah Solar Energy LLC | Tonopah, NV | 97 GWh | Oct 2015 | May 2026 |
Solar
|
| Don A Campbell 1 Geothermal | ORNI 47, LLC | Gabbs, NV | 97 GWh | Dec 2013 | Dec 2025 |
Geothermal
|
| Luning Energy | Liberty Utilities (CalPeco Electric) LLC | Luning, NV | 102 GWh | Jan 2017 | May 2026 |
Solar
|
| Patua Acquisition Project, LLC | Patua Acquisition Company, LLC | Hazen, NV | 103 GWh | Nov 2013 | Dec 2025 |
Geothermal : 75.5%
Solar : 24.5%
|
| Boulder Solar II, LLC | Invenergy Services LLC | Boulder City, NV | 104 GWh | Dec 2016 | May 2026 |
Solar
|
| Techren Solar V | Techren Solar V LLC | Boulder, NV | 108 GWh | Nov 2020 | May 2026 |
Solar
|
| Soda Lake 3 | AMOR IX, LLC | Fallon, NV | 108 GWh | Oct 2019 | May 2026 |
Geothermal
|
| Turquoise Nevada, LLC | Greenbacker Renewable Energy Corporation | Sparks, NV | 108 GWh | Nov 2020 | May 2026 |
Solar
|
| Silver State Solar Power North | Silver State Solar Power North, LLC | Primm, NV | 114 GWh | Apr 2012 | May 2026 |
Solar
|
| Tuscarora Geothermal Power Plant | Ormat Nevada Inc | Tuscarora, NV | 120 GWh | Dec 2011 | Dec 2025 |
Geothermal
|
| Beowawe | Ormat Nevada Inc | Beowawe, NV | 167 GWh | Nov 1985 | Dec 2025 |
Geothermal
|
| NGP Blue Mountain I LLC | NGP Blue Mountain I LLC | Winnemucca, NV | 173 GWh | Oct 2009 | Dec 2025 |
Geothermal
|
| North Valley | North Valley | Gerlach, NV | 187 GWh | Mar 2023 | May 2026 |
Geothermal
|
| Playa Solar 1, LLC | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | 189 GWh | Sep 2017 | May 2026 |
Solar
|
| Techren Solar I LLC | Techren Solar I LLC | Boulder, NV | 223 GWh | Feb 2019 | May 2026 |
Solar
|
| Steamboat Hills LP | Ormat Nevada Inc | Reno, NV | 234 GWh | Jan 1988 | Dec 2025 |
Geothermal
|
| Fish Springs | Fish Springs Ranch Solar, LLC | Reno, NV | 253 GWh | Feb 2022 | May 2026 |
Solar
|
| Nevada Cogen Associates 2 Black Mountain | Nevada Cogeneration Assoc # 2 | Las Vegas, NV | 255 GWh | Oct 1992 | May 2026 |
Natural Gas
|
| Playa Solar 2 | EDF Renewable Asset Holdings, Inc. | North Las Vegas, NV | 261 GWh | Jul 2017 | May 2026 |
Solar
|
| Saguaro Power | Saguaro Power Co | Henderson, NV | 264 GWh | Aug 1991 | Oct 2025 |
Natural Gas
|
| Boulder Solar Power, LLC | Southern Power Co | Boulder City, NV | 277 GWh | Nov 2016 | May 2026 |
Solar
|
| Battle Mountain Solar Project | RWE Clean Energy | Battle Mountain, NV | 282 GWh | Apr 2021 | May 2026 |
Solar
|
| Tungsten Mountain | Tungsten Mountain | Fallon, NV | 283 GWh | Nov 2017 | May 2026 |
Geothermal : 91.9%
Solar : 8.1%
|
| Nevada Cogen Assoc#1 GarnetVly | Nevada Cogeneration Assoc # 1 | Las Vegas, NV | 299 GWh | Mar 1992 | May 2026 |
Natural Gas
|
| Harry Allen Solar Energy LLC | Invenergy Services LLC | Apex, NV | 299 GWh | Apr 2021 | May 2026 |
Solar
|
| Spring Valley Wind Project | Pattern Operators LP | Ely, NV | 315 GWh | Jul 2012 | May 2026 |
Wind
|
| Escape Solar Plant | Escape Solar LLC | TBD, NV | 323 GWh | May 2025 | May 2026 |
Solar
|
| Dry Lake Solar Energy Center | Nevada Power Co | Moapa, NV | 363 GWh | Apr 2024 | May 2026 |
Solar
|
| Yellow Pine Solar | Yellow Pine Solar, LLC | Enterprise, NV | 376 GWh | Jun 2023 | May 2026 |
Solar
|
| Yellow Pine II | Yellow Pine Solar II, LLC | Enterprise, NV | 377 GWh | Apr 2024 | May 2026 |
Solar
|
| Western 102 Power Plant | Nevada Gold Mines | McCarran, NV | 385 GWh | Nov 2005 | May 2026 |
Natural Gas : 99.7%
|
| Techren Solar II LLC | Techren Solar II LLC | Boulder, NV | 451 GWh | Sep 2019 | May 2026 |
Solar
|
| McGinness Hills 3 | Ormat Nevada Inc | Austin, NV | 463 GWh | Nov 2018 | May 2026 |
Geothermal
|
| Dodge Flat | Dodge Flat Solar, LLC | Reno, NV | 536 GWh | Feb 2022 | May 2026 |
Solar
|
| Fort Churchill | Sierra Pacific Power Co | Yerington, NV | 552 GWh | Aug 1968 | May 2026 |
Natural Gas
|
| McGinness Hills | Ormat Nevada Inc | Austin, NV | 569 GWh | Apr 2012 | Dec 2025 |
Geothermal
|
| Arrow Canyon Solar Hybrid | Arrow Canyon Solar LLC | Moapa, NV | 602 GWh | Nov 2023 | May 2026 |
Solar
|
| Moapa Southern Paiute | Arevon Energy, Inc. | Moapa, NV | 619 GWh | Nov 2016 | May 2026 |
Solar
|
| Las Vegas Generating Station | Nevada Power Co | North Las Vegas, NV | 672 GWh | Feb 1994 | May 2026 |
Natural Gas
|
| Copper Mountain Solar 5, LLC | RWE Clean Energy | Boulder City, NV | 695 GWh | Feb 2021 | May 2026 |
Solar
|
| Eagle Shadow Mountain Solar Farm | 325MK 8me LLC | Moapa, NV | 907 GWh | Apr 2023 | May 2026 |
Solar
|
| Clark (NVE) | Nevada Power Co | Las Vegas, NV | 917 GWh | May 1973 | May 2026 |
Natural Gas
|
| North Valmy | Sierra Pacific Power Co | Valmy, NV | 1 TWh | Nov 1981 | May 2026 |
Bituminous Coal : 64.7%
Natural Gas : 35.0%
|
| TS Power Plant | Nevada Gold Energy, LLC | Battle Mountain, NV | 2 TWh | May 2008 | May 2026 |
Subbituminous Coal : 71.2%
Solar : 28.7%
|
| Higgins Generating Station | Nevada Power Co | Primm, NV | 2 TWh | Jan 2004 | May 2026 |
Natural Gas
|
| Apex Generating Station | Apex Generating Station | Las Vegas, NV | 2 TWh | Apr 2003 | May 2026 |
Natural Gas
|
| Gemini Solar Hybrid | Gemini Solar | Unincorporated, NV | 2 TWh | Feb 2024 | May 2026 |
Solar
|
| Silverhawk | Nevada Power Co | North Las Vegas, NV | 3 TWh | Apr 2004 | May 2026 |
Natural Gas
|
| Harry Allen | Nevada Power Co | Las Vegas, NV | 3 TWh | Apr 1995 | May 2026 |
Natural Gas
|