Fish Springs
36000 Rainbow Way, Reno, NV 89510Plant Summary Information
Fish Springs is ranked #44 out of 110 power plants in Nevada in terms of total annual net electricity generation.
Fish Springs generated 81.0 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Fish Springs |
|---|---|
| Utility Name | Fish Springs Ranch Solar, LLC |
| Location | Washoe County, NV |
| Initial Operation Date | March 2022 |
| Last Update | Sep 2025 |
| Annual Generation | 216.0 GWh |
| Annual Consumption | 831.3 k MMBtu |
| Ranked #2,378 out of 12,539 Power Plants Nationwide | |
| Ranked #375 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #44 out of 110 Nevada Power Plants | |
| Ranked #22 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Fish Springs
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Fish Springs.
Monthly Net Generation for Fish Springs
Fish Springs Details
| Summary Information | |
|---|---|
| Plant Name | Fish Springs (64148) |
| Plant Address | 36000 Rainbow Way, Reno, NV 89510 |
| Utility | Fish Springs Ranch Solar, LLC (63772) |
| Latitude, Longitude | 40.07474, -119.97417 |
| Generation Dates on File | Mar 2022 to Sep 2025 |
| Initial Operation Date | March 2022 |
| Annual Generation | 216.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 345.00 kV |
| Energy Storage | Yes |
Generator FISH Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 10M |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 130 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator FISHB Details Operating March 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 25 MW |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | March 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Time From Cold Shutdown To Full Load | 10M |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 100 |
|---|---|
| Maximum Charge Rate | 25 MW |
| Maximum Discharge Rate | 25 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 8.2 |
| Storage Enclosure Type | CS |
| Load Following | P |
| System Peak Shaving | Yes |
| Excess Wind And Solar Generation | Yes |
| DC Tightly Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 64148 |
| Direct Support Gen Id | FISH |
| Support T D Asset | Yes |
Fish Springs Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #365 | Butler Solar Project 103 | Butler, GA | 223.7 GWh |
| #366 | Great Cove Solar II | Saint Thomas, PA | 223.3 GWh |
| #367 | Lamesa Solar | Lamesa, TX | 223.3 GWh |
| #368 | Happy Solar 1 | Searcy, AR | 221.2 GWh |
| #369 | Techren Solar I LLC | Boulder, NV | 220.9 GWh |
| #370 | Pixley Solar Energy | Pixley, KS | 220.1 GWh |
| #371 | Enterprise Solar, LLC | Newcastle, UT | 220.1 GWh |
| #372 | Briar Creek Solar 1 | Corsicana, TX | 219.8 GWh |
| #373 | Chicot Solar | Lake Village, AR | 219.8 GWh |
| #374 | Woodruff County Solar | Augusta, AR | 218.7 GWh |
| #376 | Samson Solar Energy II LLC | Cunningham, TX | 218.5 GWh |
| #377 | Black Bear Solar 1 | Montgomery, AL | 218.1 GWh |
| #378 | Henrietta Solar Project | Lemoore, CA | 218.0 GWh |
| #379 | Sandrini Solar 100 | Mettler, CA | 217.7 GWh |
| #380 | BPL Crown Solar LLC | Chilton, TX | 215.3 GWh |
| #381 | East Pecos Solar | McCamey, TX | 215.2 GWh |
| #382 | Ragsdale Solar LLC | Canton, MS | 214.0 GWh |
| #383 | Iron Springs Solar, LLC | Cedar City, UT | 213.7 GWh |
| #384 | Fern Solar LLC | Battleboro, NC | 213.4 GWh |
| #385 | Elektron Solar, LLC | Grantsville, UT | 212.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Fish Springs.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Galena 2 Geothermal Power Plant | Reno, NV | 36.7 GWh | 49.7 mi |
| Galena 3 Geothermal Power Plant | Reno, NV | 82.6 GWh | 48.9 mi |
| Haypress | Sierra City, CA | 17.6 GWh | 47.7 mi |
| High Sierra Cogeneration Plant | Susanville, CA | 36.7 GWh | 35.4 mi |
| HL Power | Wendel, CA | 204.8 GWh | 25.4 mi |
| HL Solar | Wendel, CA | 11.5 GWh | 25.6 mi |
| North Valley | Gerlach, NV | 202.8 GWh | 34 mi |
| PSREC/SIAD Solar | Herlong, CA | 6.2 GWh | 9.4 mi |
| Richard Burdette Geothermal | Reno, NV | 97.6 GWh | 48.7 mi |
| San Emidio | Gerlach, NV | 83.8 GWh | 36.9 mi |
| Stampede | Truckee, CA | 15.6 GWh | 42.3 mi |
| Steamboat Hills LP | Reno, NV | 231.7 GWh | 49.9 mi |
| Steamboat II | Reno, NV | 62.7 GWh | 48.5 mi |
| Steamboat III | Reno, NV | 69.4 GWh | 48.5 mi |
| Tesla Reno GigaFactory | Sparks, NV | 8.7 GWh | 46.6 mi |
| Tracy | Sparks, NV | 4.0 TWh | 42.7 mi |
| Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 41.3 mi |
| Turquoise Nevada, LLC | Sparks, NV | 107.4 GWh | 42 mi |
| Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 44.3 mi |
| Western 102 Power Plant | McCarran, NV | 405.0 GWh | 43.2 mi |