Techren Solar II LLC
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar II LLC is ranked #38 out of 5,173 solar farms nationwide in terms of total annual net electricity generation.
Techren Solar II LLC generated 112.3 GWh during the 3-month period between November 2023 to February 2024.
Plant Name | Techren Solar II LLC |
---|---|
Utility Name | Techren Solar II LLC |
Location | Clark County, NV |
Initial Operation Date | October 2019 |
Last Update | Feb 2024 |
Annual Generation | 564.7 GWh |
Annual Consumption | 1.9 M MMBtu |
Ranked #1,251 out of 11,455 Power Plants Nationwide | |
Ranked #38 out of 5,173 Solar Power Plants Nationwide | |
Ranked #20 out of 103 Nevada Power Plants | |
Ranked #7 out of 53 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Techren Solar II LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar II LLC.
Monthly Net Generation for Techren Solar II LLC
Techren Solar II LLC Details
Summary Information | |
---|---|
Plant Name | Techren Solar II LLC (61930) |
Plant Address | 15103 Highway US 95 South Boulder, NV 89005 |
Utility | Techren Solar II LLC (61533) |
Latitude, Longitude | 35.86726, -114.95643 |
Generation Dates on File | Aug 2019 to Feb 2024 |
Initial Operation Date | October 2019 |
Annual Generation | 564.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG17-76-000, EG17137-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator TECH2 Details Operating October 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
RTO ISO LMP Node Designation | NSO_2_N008 |
RTO ISO Location Designation For Reporting Wholesale Sales Data | NSO_2_N008 |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | October 2019 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Carbon Capture Technology | No |
Multiple Fuels | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 251.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Techren Solar II LLC Plant Owners
Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#28 | AV Solar Ranch One | Lancaster, CA | 607.0 GWh |
#29 | Slate Hybrid | Stratford, CA | 574.4 GWh |
#30 | Galloway 1 Solar Farm | Paint Rock, TX | 593.8 GWh |
#31 | SE Athos II, LLC | Desert Center, CA | 590.5 GWh |
#32 | Sun Valley Solar Project | Abbott, TX | 588.6 GWh |
#33 | Great Valley Solar Portfolio Holdings, LLC | Cantua Creek, CA | 587.5 GWh |
#34 | Aktina Solar | El Campo, TX | 587.2 GWh |
#35 | Azure Sky Solar | Haskell, TX | 578.6 GWh |
#36 | Bighorn Solar 1 | Pueblo, CO | 584.0 GWh |
#37 | Taygete Energy Project LLC | Coyanosa, TX | 570.1 GWh |
#39 | Aquamarine | Lemoore, CA | 560.9 GWh |
#40 | Phoebe Solar | Kermit, TX | 559.5 GWh |
#41 | Dodge Flat | Reno, NV | 546.0 GWh |
#42 | Golden Field Solar III, LLC | Rosamond, CA | 551.9 GWh |
#43 | Misae Solar | Childress, TX | 546.6 GWh |
#44 | ENGIE Long Draw Solar LLC | Gail, TX | 545.0 GWh |
#45 | Pisgah Ridge Solar, LLC | Richland, TX | 529.7 GWh |
#46 | Roseland Solar Project, LLC | Riesel, TX | 524.4 GWh |
#47 | Centinela Solar Energy | Calexico, CA | 523.7 GWh |
#48 | Fighting Jays Solar Project | Needville, TX | 518.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar II LLC.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 132.9 GWh | 1.4 mi |
Clark (NVE) | Las Vegas, NV | 638.2 GWh | 16.1 mi |
CM10 | Boulder City, NV | 19.8 GWh | 5.8 mi |
CM48 | Boulder City, NV | 102.4 GWh | 6.3 mi |
Copper Mountain Solar 2 | Boulder City, NV | 381.0 GWh | 5.6 mi |
Copper Mountain Solar 3 | Boulder City, NV | 636.0 GWh | 1.5 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 249.7 GWh | 6 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 707.9 GWh | 6.4 mi |
Desert Star Energy Center | Boulder City, NV | 1.9 TWh | 5.8 mi |
Dignity - Siena Campus | Henderson, NV | 3.0 GWh | 13 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.6 TWh | 15.9 mi |
Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 15.9 mi |
Nevada Solar One | Boulder City, NV | 95.8 GWh | 4.9 mi |
River Mountains Solar | Henderson, NV | 24.6 GWh | 11.5 mi |
Saguaro Power | Henderson, NV | 209.1 GWh | 12.4 mi |
Techren Solar I LLC | Boulder, NV | 205.7 GWh | 1.5 mi |
Techren Solar III LLC | Boulder, NV | 58.8 GWh | 1.8 mi |
Techren Solar IV LLC | Boulder, NV | 62.8 GWh | 2.1 mi |
Techren Solar V | Boulder, NV | 128.2 GWh | 2.8 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 446.9 GWh | 6.3 mi |