Turquoise Liberty Solar

21905 Reno Technology Parkway, Sparks, NV 89434

Plant Summary Information

Turquoise Liberty Solar is ranked #50 out of 61 solar farms in Nevada in terms of total annual net electricity generation.

Turquoise Liberty Solar generated 1.5 GWh during the 3-month period between September 2024 to December 2024.

Plant NameTurquoise Liberty Solar
Utility NameLiberty Utilities (CalPeco Electric) LLC
LocationWashoe County, NV
Initial Operation DateNovember 2019
Last Update Dec 2024
Annual Generation 9.2 GWh
Annual Consumption 32.5 k MMBtu
Ranked #6,345 out of 12,553 Power Plants Nationwide
Ranked #1,950 out of 6,410 Solar Power Plants Nationwide
Ranked #100 out of 110 Nevada Power Plants
Ranked #50 out of 61 Nevada Solar Power Plants
Fuel Types Solar

Map of Turquoise Liberty Solar

Full Screen Map

Register Now for Comprehensive Access

Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Turquoise Liberty Solar.

Create Your Account Today

Monthly Net Generation for Turquoise Liberty Solar

Turquoise Liberty Solar Details

Summary Information
Plant NameTurquoise Liberty Solar (62980)
Plant Address21905 Reno Technology Parkway, Sparks, NV 89434
UtilityLiberty Utilities (CalPeco Electric) LLC (57222)
Latitude, Longitude39.59, -119.52
Generation Dates on FileNov 2019 to Dec 2024
Initial Operation DateNovember 2019
Annual Generation 9.2 GWh
Fuel Types Solar
 
Federal Energy Regulatory Commission (FERC) Information
FERC Cogeneration StatusNo
FERC Small Power Producer StatusYes
FERC Small Power Producer Docket Number18-1897-000
FERC Exempt Wholesale Generator StatusNo
Regulatory Information
Regulatory StatusRegulated
NERC RegionWECC
Balancing AuthorityNevada Power Company (NEVP)
NAICS CodeUtilities (22)
Sector Electric Utility (1)
Water Source
Ash Impoundment
Transmission / Distribution OwnerSierra Pacific Power Co (17166) NV
Grid Voltage 120.00 kV
Energy StorageNo

Generator PV Details Operating November 2019

TechnologySolar Photovoltaic
Prime MoverPhotovoltaic
OwnershipSingle Owner
Nameplate Capacity10 MW
Nameplate Power Factor1
Summer Capacity10 MW
Winter Capacity10 MW
Uprate/Derate Completed No
StatusOperating
First Operation DateNovember 2019
Combined Heat & Power No
Sector NameElectric Utility (1)
Energy SourceSolar
Solid Fuel Gasification No
Carbon Capture TechnologyNo
Multiple FuelsNo
Cofire FuelsNo
Solar Details
Single Axis TrackingYes
Dual Axis TrackingNo
Azimuth Angle180
Tilt Angle-4
DC Net Capacity11 MW
Thin Film CDTEYes
Net Metering AgreementNo
Virtual Net Metering AgreementNo

Turquoise Liberty Solar Plant Owners

Owner NameAddressOwnership
We couldn't locate any owners for this plant

Power Plants with Similar Net Generation

Power plants with a similar annual net generation from Solar.

RankPlant NamePlant LocationAnnual Generation
#1940Keen FarmFour Oaks, NC9.3 GWh
#1941Van Epps SolarFultonville, NY9.3 GWh
#1942Sweetgum SolarSanford, NC9.3 GWh
#1943Northfield Solar CSGNorthfield, MN9.3 GWh
#1944Exum Farm Solar, LLCGrifton, NC9.3 GWh
#1945Yanceyville Farm 2 LLCBlanch, NC9.3 GWh
#1946Millikan FarmRandleman, NC9.3 GWh
#1947Kojak FarmBailey, NC9.3 GWh
#1948Clipperton Holdings LLCClinton, NC9.3 GWh
#1949St. Pauls Solar 1, LLCSt. Pauls, NC9.2 GWh
#1951Bomber CSGHampstead, MD9.2 GWh
#1952ACE-Stanton PVOrlando, FL9.2 GWh
#1953Griffin SolarRobinson, TX9.2 GWh
#1954Whitesboro SolarWhitesboro, TX9.2 GWh
#1955Dibrell FarmPelham, NC9.2 GWh
#1956Mustang SolarRobbins, NC9.2 GWh
#1957Equuleus Community Solar GardensRosemount, MN9.2 GWh
#1958Syncarpha Puddon II Hybrid CSGNorthbridge, MA9.1 GWh
#1959Lane SolarGoldsboro, NC9.2 GWh
#1960Stikeleather FarmHiddenite, NC9.2 GWh

Nearby Power Plants

Below are closest 20 power plants surrounding Turquoise Liberty Solar.

Plant NamePlant LocationAnnual GenerationDistance
BradyFallon, NV88.7 GWh30.6 mi
Desert Peak Power PlantFernley, NV72.7 GWh32.2 mi
FleishFleish, NV21.2 GWh21.4 mi
Galena 2 Geothermal Power PlantReno, NV36.7 GWh19.9 mi
Galena 3 Geothermal Power PlantReno, NV82.6 GWh18.5 mi
LahontanFallon, NV10.0 GWh25.7 mi
New LahontanFallon, NV10.5 GWh25.8 mi
Patua Acquisition Project, LLCHazen, NV133.5 GWh23.8 mi
Richard Burdette GeothermalReno, NV97.6 GWh18.6 mi
StampedeTruckee, CA15.4 GWh32.2 mi
Steamboat Hills LPReno, NV231.7 GWh20.1 mi
Steamboat IIReno, NV62.7 GWh18.1 mi
Steamboat IIIReno, NV69.4 GWh18.2 mi
Tesla Reno GigaFactorySparks, NV8.7 GWh5.5 mi
TracySparks, NV4.0 TWh1.9 mi
Turquoise Nevada, LLCSparks, NV106.9 GWh1.1 mi
VerdiVerdi, NV19.2 GWh19.5 mi
WashoeVerdi, NV14.4 GWh20 mi
Waste Management Lockwood LFGTESparks, NV25.8 GWh8.6 mi
Western 102 Power PlantMcCarran, NV403.4 GWh2.1 mi