Techren Solar IV LLC
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar IV LLC is ranked #36 out of 61 solar farms in Nevada in terms of total annual net electricity generation.
Techren Solar IV LLC generated 10.1 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Techren Solar IV LLC |
|---|---|
| Utility Name | Techren Solar IV LLC |
| Location | Clark County, NV |
| Initial Operation Date | October 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 53.9 GWh |
| Annual Consumption | 193.3 k MMBtu |
| Ranked #4,030 out of 12,613 Power Plants Nationwide | |
| Ranked #980 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #77 out of 110 Nevada Power Plants | |
| Ranked #36 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Techren Solar IV LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar IV LLC.
Monthly Net Generation for Techren Solar IV LLC
Monthly Plant Fuel Consumption for Techren Solar IV LLC
Techren Solar IV LLC Details
| Summary Information | |
|---|---|
| Plant Name | Techren Solar IV LLC (61932) |
| Plant Address | 15103 Highway US 95 South, Boulder, NV 89005 |
| Utility | Techren Solar IV LLC (61535) |
| Latitude, Longitude | 35.89266, -114.93653 |
| Generation Dates on File | Sep 2020 to Dec 2025 |
| Initial Operation Date | October 2020 |
| Annual Generation | 53.9 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG17-76-000, EG17137-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator TECH4 Details Operating October 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | NSO_2_N008 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NSO_2_N008 |
| Nameplate Capacity | 25 MW |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | October 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| DC Net Capacity | 33 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Techren Solar IV LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| KKR/GA | 30 Hudson Yards, New York, NY 10001 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #970 | Kingbird B Solar, LLC | Rosamond, CA | 55.8 GWh |
| #971 | Black Hollow Sun | Auit, CO | 55.5 GWh |
| #972 | Apache Solar I | Cochise, AZ | 55.5 GWh |
| #973 | Marine Corps Logistics Base Solar | Albany, GA | 55.5 GWh |
| #974 | Mechanicsville Solar | Mechanicsville, VA | 55.4 GWh |
| #975 | SR McNeal | McNeal, AZ | 52.8 GWh |
| #976 | Bluebird Solar LLC | Leesburg, KY | 54.2 GWh |
| #977 | Seville 1 | Ocotillo Wells, CA | 54.1 GWh |
| #978 | Antelope Big Sky Ranch | Lancaster, CA | 54.0 GWh |
| #979 | Techren Solar III LLC | Boulder, NV | 54.0 GWh |
| #981 | OCI Stillhouse Solar | Rogers, TX | 53.8 GWh |
| #982 | Barilla Solar | Fort Stockton, TX | 53.7 GWh |
| #983 | Innovative Solar 31 | Bladenboro, NC | 53.6 GWh |
| #984 | Caden Energix Endless Caverns, LLC | New Market, VA | 53.6 GWh |
| #985 | SEPV Mojave West | Mojave, CA | 53.5 GWh |
| #986 | Liberty Hybrid Solar and Storage Project | Dayton, TX | 53.4 GWh |
| #987 | Adelanto Solar, LLC | Adelanto, CA | 53.2 GWh |
| #988 | Catalina Solar 2, LLC | Rosamond, CA | 52.8 GWh |
| #989 | Gaskell West 1 Solar Facility | Lancaster, CA | 52.6 GWh |
| #990 | East Nash PV2 | Spring Hope, NC | 52.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar IV LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 110.5 GWh | 3 mi |
| CM10 | Boulder City, NV | 18.0 GWh | 7.9 mi |
| CM48 | Boulder City, NV | 94.3 GWh | 8.3 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 7.5 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 597.4 GWh | 1.2 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 7.9 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 691.4 GWh | 8.3 mi |
| Desert Star Energy Center | Boulder City, NV | 375.0 GWh | 7.9 mi |
| Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 12.6 mi |
| Hoover Dam (AZ) | Boulder City, AZ | 927.1 GWh | 14 mi |
| Hoover Dam (NV) | Boulder City, NV | 1.8 TWh | 14 mi |
| IGS LAS1 | Henderson, NV | 1.1 GWh | 12.9 mi |
| Nevada Solar One | Boulder City, NV | 89.5 GWh | 6.9 mi |
| River Mountains Solar | Henderson, NV | 33.6 GWh | 9.6 mi |
| Saguaro Power | Henderson, NV | 264.5 GWh | 11.1 mi |
| Techren Solar I LLC | Boulder, NV | 224.1 GWh | 3.6 mi |
| Techren Solar II LLC | Boulder, NV | 491.9 GWh | 2.1 mi |
| Techren Solar III LLC | Boulder, NV | 54.0 GWh | 3.9 mi |
| Techren Solar V | Boulder, NV | 108.0 GWh | 0.8 mi |
| Townsite Solar Project Hybrid | Boulder City, NV | 465.9 GWh | 4.3 mi |