Silver State Solar Power North
1250 East Primm Blvd, Primm, NV 89019Plant Summary Information
Silver State Solar Power North is ranked #25 out of 61 solar farms in Nevada in terms of total annual net electricity generation.
Silver State Solar Power North generated 30.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Silver State Solar Power North |
|---|---|
| Utility Name | Silver State Solar Power North, LLC |
| Location | Clark County, NV |
| Initial Operation Date | May 2012 |
| Last Update | Sep 2025 |
| Annual Generation | 113.8 GWh |
| Annual Consumption | 423.2 k MMBtu |
| Ranked #3,252 out of 12,539 Power Plants Nationwide | |
| Ranked #753 out of 6,400 Solar Power Plants Nationwide | |
| Ranked #53 out of 110 Nevada Power Plants | |
| Ranked #25 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operators |
First Solar Energy LLC (2013 to 2013) First Solar Project Development (2014 to 2014) Enbridge (2015 to 2018) Silver State Solar Power North, LLC (2019 to 2024) |
Map of Silver State Solar Power North
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Silver State Solar Power North.
Monthly Net Generation for Silver State Solar Power North
Silver State Solar Power North Details
| Summary Information | |
|---|---|
| Plant Name | Silver State Solar Power North (57442) |
| Plant Address | 1250 East Primm Blvd, Primm, NV 89019 |
| Utility | Silver State Solar Power North, LLC (62968) |
| Latitude, Longitude | 35.79306, -115.35028 |
| Generation Dates on File | Apr 2012 to Sep 2025 |
| Initial Operation Date | May 2012 |
| Annual Generation | 113.8 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator 56188 Details Operating May 2012
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Jointly Owned |
| Nameplate Capacity | 52 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2012 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Other Combustion Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 63.5 MW |
| Thin Film CDTE | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Silver State Solar Power North Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Clover US Blocker LLC | 65 Queen St West, Suite No. 605, Toronto, ON M5H2M5 | 49.00% |
| Silver State Power North | 5400 Westheimer Ct, Houston, TX 77506 | 51.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #743 | Sandstone Solar | Florence, AZ | 117.2 GWh |
| #744 | Madison Solar (VA) | Locust Grove, VA | 117.2 GWh |
| #745 | Hecate Energy Beacon Solar 4 | Cantil, CA | 117.2 GWh |
| #746 | Maiden Creek Solar Power Plant | Maiden, NC | 116.7 GWh |
| #747 | Northern Preserve Solar | Glen St. Mary, FL | 116.5 GWh |
| #748 | Alton Post Office Solar | Alton, VA | 116.4 GWh |
| #749 | Glover Creek Solar, LLC | Summer Shade, KY | 115.8 GWh |
| #750 | Iris Solar LLC | Franklinton, LA | 114.6 GWh |
| #751 | Pavant Solar, LLC | Fillmore, UT | 113.9 GWh |
| #752 | Beacon Solar Plant Site 2 | Cantil, CA | 113.9 GWh |
| #754 | LA3 West Baton Rouge Solar Facility | West Baton Rouge, LA | 113.4 GWh |
| #755 | Landrace Holdings, LLC | Conway, SC | 113.4 GWh |
| #756 | Grange Hall Solar | Wimauma, FL | 113.1 GWh |
| #757 | Orange Grove | Jim Wells, TX | 112.9 GWh |
| #758 | Gravel Pit Solar, LLC | East Windsor, CT | 112.8 GWh |
| #759 | SEGS IX | Hinkley, CA | 112.0 GWh |
| #760 | Manatee Solar Energy Center | Parrish, FL | 99.1 GWh |
| #761 | Colgreen North Shore Solar Farm | Mecca, CA | 112.0 GWh |
| #762 | Boulder Solar II, LLC | Boulder City, NV | 111.8 GWh |
| #763 | Great Cove Solar | McConnellsburg, PA | 111.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Silver State Solar Power North.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| CM10 | Boulder City, NV | 18.0 GWh | 20 mi |
| CM48 | Boulder City, NV | 94.3 GWh | 20 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 21.7 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 21 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 688.1 GWh | 21.1 mi |
| Desert Star Energy Center | Boulder City, NV | 546.1 GWh | 20 mi |
| Dignity - San Martin | Las Vegas, NV | 3.4 GWh | 18.8 mi |
| Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 19.6 mi |
| Goodsprings Waste Heat Recovery | Jean, NV | 17.0 GWh | 3.6 mi |
| Higgins Generating Station | Primm, NV | 2.7 TWh | 12.4 mi |
| IGS LAS1 | Henderson, NV | 1.1 GWh | 16.6 mi |
| IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh | 19.5 mi |
| Ivanpah 1 | Nipton, CA | 167.9 GWh | 18.9 mi |
| Ivanpah 2 | Nipton, CA | 254.4 GWh | 17.7 mi |
| Ivanpah 3 | Nipton, CA | 240.8 GWh | 16.4 mi |
| Nevada Solar One | Boulder City, NV | 89.8 GWh | 20.7 mi |
| Silver State Solar Power South | Primm Valley, NV | 672.7 GWh | 11.4 mi |
| Stateline Solar | Nipton, CA | 619.9 GWh | 13.6 mi |
| Techren Solar I LLC | Boulder, NV | 220.9 GWh | 21.4 mi |
| Techren Solar III LLC | Boulder, NV | 55.6 GWh | 21.5 mi |