Dodge Flat
2505 State Route 447, Reno, NV 89510Plant Summary Information
Dodge Flat is ranked #20 out of 107 power plants in Nevada in terms of total annual net electricity generation.
Dodge Flat generated 104.8 GWh during the 3-month period between December 2024 to March 2025.
Plant Name | Dodge Flat |
---|---|
Utility Name | Dodge Flat Solar, LLC |
Location | Washoe County, NV |
Initial Operation Date | March 2022 |
Last Update | Mar 2025 |
Annual Generation | 555.2 GWh |
Annual Consumption | 2.1 M MMBtu |
Ranked #1,214 out of 12,288 Power Plants Nationwide | |
Ranked #60 out of 6,174 Solar Power Plants Nationwide | |
Ranked #20 out of 107 Nevada Power Plants | |
Ranked #8 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Dodge Flat
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dodge Flat.
Monthly Net Generation for Dodge Flat
Dodge Flat Details
Summary Information | |
---|---|
Plant Name | Dodge Flat (63913) |
Plant Address | 2505 State Route 447, Reno, NV 89510 |
Utility | Dodge Flat Solar, LLC (63578) |
Latitude, Longitude | 40.71302, -119.46722 |
Generation Dates on File | Mar 2022 to Mar 2025 |
Initial Operation Date | March 2022 |
Annual Generation | 555.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 345.00 kV |
Energy Storage | Yes |
Generator DODGB Details Operating March 2022
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Time From Cold Shutdown To Full Load | 10M |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 200 |
---|---|
Maximum Charge Rate | 50 MW |
Maximum Discharge Rate | 50 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 16.4 |
Storage Enclosure Type | CS |
Load Following | P |
System Peak Shaving | Yes |
Excess Wind And Solar Generation | Yes |
DC Tightly Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 63913 |
Direct Support Gen Id | DODGE |
Support T D Asset | Yes |
Generator DODGE Details Operating March 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 200 MW |
Summer Capacity | 200 MW |
Winter Capacity | 200 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 260 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Dodge Flat Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#50 | Blythe Solar 110, LLC | Blythe, CA | 571.4 GWh |
#51 | Blythe Mesa Solar II | Blythe, CA | 571.8 GWh |
#52 | Victory Pass | Desert Center, CA | 575.1 GWh |
#53 | Thunder Wolf Energy Center Hybrid | Avondale, CO | 556.8 GWh |
#54 | RE Maplewood | McCamey, TX | 570.5 GWh |
#55 | AV Solar Ranch One | Lancaster, CA | 569.0 GWh |
#56 | Texas Solar Nova 2 | Spur, TX | 565.9 GWh |
#57 | Oberon Solar Project | Desert Center, CA | 544.8 GWh |
#58 | Sparta Solar | Pawnee, TX | 562.7 GWh |
#59 | Eiffel Solar Project | Paris, TX | 562.4 GWh |
#61 | Daggett 2 | Daggett, CA | 537.9 GWh |
#62 | Desert Sunlight 250, LLC | Desert Center, CA | 555.7 GWh |
#63 | Golden Field Solar III, LLC | Rosamond, CA | 534.6 GWh |
#64 | Sun Valley Solar Project | Abbott, TX | 546.2 GWh |
#65 | Great Valley Solar Portfolio Holdings, L | Cantua Creek, CA | 542.2 GWh |
#66 | Azure Sky Solar | Haskell, TX | 518.8 GWh |
#67 | Dunns Bridge I Solar | Wheatfield, IN | 525.5 GWh |
#68 | Phoebe Solar | Kermit, TX | 525.2 GWh |
#69 | Yellowbud Solar, LLC | Williamsport, OH | 516.7 GWh |
#70 | ENGIE Long Draw Solar LLC | Gail, TX | 516.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dodge Flat.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brady | Fallon, NV | 88.7 GWh | 67.8 mi |
Desert Peak Power Plant | Fernley, NV | 72.7 GWh | 71.6 mi |
Fish Springs | Reno, NV | 219.4 GWh | 51.5 mi |
High Sierra Cogeneration Plant | Susanville, CA | 36.7 GWh | 56.9 mi |
HL Power | Wendel, CA | 204.8 GWh | 48.2 mi |
HL Solar | Wendel, CA | 11.5 GWh | 47.9 mi |
NGP Blue Mountain I LLC | Winnemucca, NV | 182.8 GWh | 72 mi |
North Valley | Gerlach, NV | 203.5 GWh | 23.5 mi |
Patua Acquisition Project, LLC | Hazen, NV | 133.5 GWh | 80.6 mi |
PSREC/SIAD Solar | Herlong, CA | 6.2 GWh | 52 mi |
San Emidio | Gerlach, NV | 83.8 GWh | 23.2 mi |
Soda Lake 3 | Fallon, NV | 123.1 GWh | 86.4 mi |
Star Peak Geothermal Plant | Imlay, NV | 39.6 GWh | 63.9 mi |
Steamboat II | Reno, NV | 62.7 GWh | 92.2 mi |
Tesla Reno GigaFactory | Sparks, NV | 8.7 GWh | 81.1 mi |
Tracy | Sparks, NV | 4.0 TWh | 79.6 mi |
Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 77.6 mi |
Turquoise Nevada, LLC | Sparks, NV | 109.1 GWh | 78.8 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 84.7 mi |
Western 102 Power Plant | McCarran, NV | 442.6 GWh | 79.7 mi |