Luning Energy
Mile Marker 2.5, Luning, NV 89420Plant Summary Information
Luning Energy is ranked #30 out of 61 solar farms in Nevada in terms of total annual net electricity generation.
Luning Energy generated 16.8 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Luning Energy |
|---|---|
| Utility Name | Liberty Utilities (CalPeco Electric) LLC |
| Location | Mineral County, NV |
| Initial Operation Date | February 2017 |
| Last Update | Dec 2025 |
| Annual Generation | 102.1 GWh |
| Annual Consumption | 364.1 k MMBtu |
| Ranked #3,409 out of 12,613 Power Plants Nationwide | |
| Ranked #814 out of 6,463 Solar Power Plants Nationwide | |
| Ranked #60 out of 110 Nevada Power Plants | |
| Ranked #30 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Algonquin Power Co (2016 to 2018) Liberty Utilities (CalPeco Electric) LLC (2019 to 2024) |
Map of Luning Energy
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Luning Energy.
Monthly Net Generation for Luning Energy
Monthly Plant Fuel Consumption for Luning Energy
Luning Energy Details
| Summary Information | |
|---|---|
| Plant Name | Luning Energy (61084) |
| Plant Address | Mile Marker 2.5, Luning, NV 89420 |
| Utility | Liberty Utilities (CalPeco Electric) LLC (57222) |
| Latitude, Longitude | 38.54695, -118.19156 |
| Generation Dates on File | Feb 2017 to Dec 2025 |
| Initial Operation Date | February 2017 |
| Annual Generation | 102.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
| Grid Voltage | 120.00 kV |
| Energy Storage | No |
Generator LNING Details Operating February 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | February 2017 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 54.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Luning Energy Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #804 | Camino Solar Hybrid | Rosamond, CA | 104.8 GWh |
| #805 | Airport Solar | Lakeview, OR | 104.4 GWh |
| #806 | Salt Creek Township Solar, LLC | Mason City, IL | 104.2 GWh |
| #807 | Foothills Solar Plant Hybrid | Yuma, AZ | 97.8 GWh |
| #808 | Salt City Solar Project - Hybrid | Circleville, OH | 103.7 GWh |
| #809 | Appaloosa Solar I | Cedar City, UT | 103.5 GWh |
| #810 | Edwards Sanborn S1 | Mojave, CA | 100.5 GWh |
| #811 | Bladen Solar | Fayetteville, NC | 103.3 GWh |
| #812 | Mountain View Solar (FL) | Dade City, FL | 102.5 GWh |
| #813 | Elevation Solar C | Lancaster, CA | 102.5 GWh |
| #815 | Red Horse 2 | Willcox, AZ | 144.2 GWh |
| #816 | Kimmel Road Solar, LLC | Du Quoin, IL | 101.8 GWh |
| #817 | Pitts Dudik Solar | Hubbard, TX | 101.7 GWh |
| #818 | Bullock Solar, LLC | Manson, NC | 101.2 GWh |
| #819 | North Rock | Edgerton, WI | 100.7 GWh |
| #820 | Bear Creek (WI) | Lone Rock, WI | 100.4 GWh |
| #821 | Assembly Solar Project | Venice Township, MI | 99.8 GWh |
| #822 | Beaver Dam Solar | Dodge, WI | 99.8 GWh |
| #823 | BT Signal Ranch | Quinlan, TX | 99.7 GWh |
| #824 | Timber Road Solar Park | Payne, OH | 99.6 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Luning Energy.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| CD4 | Mammoth Lakes, CA | 276.9 GWh | 73.7 mi |
| Crescent Dunes Solar Energy | Tonopah, NV | 59.0 GWh | 49.6 mi |
| Don A Campbell 1 Geothermal | Gabbs, NV | 110.0 GWh | 21.3 mi |
| Don A Campbell 2 Geothermal | Luning, NV | 93.5 GWh | 21.2 mi |
| Fort Churchill | Yerington, NV | 468.8 GWh | 64.6 mi |
| Ft. Churchill PV | Yerington, NV | 22.2 GWh | 64.9 mi |
| Lahontan | Fallon, NV | 10.0 GWh | 78.8 mi |
| Lundy | Lee Vining, CA | 7.3 GWh | 63.6 mi |
| Mammoth G1 | Mammoth lakes, CA | 59.6 GWh | 73.7 mi |
| Mammoth G2 | Mammoth Lakes, CA | 82.3 GWh | 73.4 mi |
| Mammoth G3 | Mammoth Lakes, CA | 103.1 GWh | 73.5 mi |
| Middle Gorge | Bishop, CA | 90.9 GWh | 74.5 mi |
| Poole | Lee Vining, CA | 22.8 GWh | 69.5 mi |
| Rush Creek | June lake, CA | 43.0 GWh | 73.9 mi |
| Salt Wells | Fallon, NV | 70.0 GWh | 55.6 mi |
| Soda Lake 3 | Fallon, NV | 118.1 GWh | 78.1 mi |
| Stillwater Facility | Fallon, NV | 128.3 GWh | 71.8 mi |
| Stillwater Solar PV II | Fallon, NV | 24.3 GWh | 71.5 mi |
| Upper Gorge | Bishop, CA | 99.9 GWh | 72.5 mi |
| Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 68.2 mi |