Yellow Pine II
6901 Tecopa Road, Enterprise, NV 89124Plant Summary Information
Yellow Pine II is ranked #28 out of 107 power plants in Nevada in terms of total annual net electricity generation.
Yellow Pine II generated 104.8 GWh during the 3-month period between February 2025 to May 2025.
Plant Name | Yellow Pine II |
---|---|
Utility Name | Yellow Pine Solar II, LLC |
Location | Clark County, NV |
Initial Operation Date | May 2024 |
Last Update | May 2025 |
Annual Generation | 382.7 GWh |
Annual Consumption | 1.4 M MMBtu |
Ranked #1,600 out of 12,312 Power Plants Nationwide | |
Ranked #129 out of 6,191 Solar Power Plants Nationwide | |
Ranked #28 out of 107 Nevada Power Plants | |
Ranked #12 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Yellow Pine II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Yellow Pine II.
Monthly Net Generation for Yellow Pine II
Yellow Pine II Details
Summary Information | |
---|---|
Plant Name | Yellow Pine II (67091) |
Plant Address | 6901 Tecopa Road, Enterprise, NV 89124 |
Utility | Yellow Pine Solar II, LLC (65968) |
Latitude, Longitude | 36.07551, -115.79129 |
Generation Dates on File | May 2024 to May 2025 |
Initial Operation Date | May 2024 |
Annual Generation | 382.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Valley Electric Assn, Inc (19840) NV |
Grid Voltage | 230.00 kV |
Energy Storage | Yes |
Generator YP2AB Details Operating May 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 53 MW |
Summer Capacity | 53 MW |
Winter Capacity | 53 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 212 |
---|---|
Maximum Charge Rate | 53 MW |
Maximum Discharge Rate | 53 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 212 |
Storage Enclosure Type | CS |
Arbitrage | P |
Ramping Spinning Reserve | Yes |
Load Management | Yes |
Ac Coupled | No |
Direct Support Of Another Unit | No |
Support T D Asset | No |
Generator YP2AP Details Operating May 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 60 MW |
Summer Capacity | 60 MW |
Winter Capacity | 60 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 84 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator YP2BB Details Operating May 2024
Technology | Batteries |
---|---|
Prime Mover | Battery |
Ownership | Single Owner |
Nameplate Capacity | 32 MW |
Summer Capacity | 32 MW |
Winter Capacity | 32 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | May 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Electricity used for energy storage |
Energy Storage Details | |
Nameplate Energy Capacity MWH | 128 |
---|---|
Maximum Charge Rate | 12.8 MW |
Maximum Discharge Rate | 12.8 MW |
Storage Technology | LIB |
Nameplate Reactive Power Rating | 128 |
Storage Enclosure Type | CS |
Arbitrage | Yes |
Excess Wind And Solar Generation | P |
Ac Coupled | Yes |
Direct Support Of Another Unit | Yes |
Direct Support Plant Id | 67091 |
Direct Support Gen Id | YP2BP |
Support T D Asset | No |
Generator YP2BP Details Operating July 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 65 MW |
Summer Capacity | 65 MW |
Winter Capacity | 65 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2024 |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 91 MW |
Crystalline Silicon | Yes |
Thin Film CDTE | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Yellow Pine II Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#119 | Mount Signal Solar Farm II | Calexico, CA | 407.0 GWh |
#120 | Castle Gap Solar Hybrid | McCarney, TX | 405.7 GWh |
#121 | Riverstart Solar Park LLC | Modoc, IN | 405.0 GWh |
#122 | Yellow Pine Solar | Enterprise, NV | 389.3 GWh |
#123 | Sun Streams, LLC | Arlington, AZ | 402.1 GWh |
#124 | Mesquite Solar 1 | Tonopah, AZ | 401.4 GWh |
#125 | Chestnut | Lemoore, CA | 374.8 GWh |
#126 | Big Plain Solar, LLC | London, OH | 399.0 GWh |
#127 | Springbok Solar Farm 2 | Cantil, CA | 399.0 GWh |
#128 | Mustang Two | Lemoore, CA | 398.0 GWh |
#130 | Dry Lake Solar Energy Center | Moapa, NV | 380.7 GWh |
#131 | Samson Solar Energy | Cunningham, TX | 394.6 GWh |
#132 | North Rosamond Solar LLC | Rosamond, CA | 392.2 GWh |
#133 | Buena Vista Energy Center | Chaparral, NM | 387.8 GWh |
#134 | Shakes Solar | Carrizo Springs, TX | 389.8 GWh |
#135 | Cavalry Solar Hybrid | Monon, IN | 381.7 GWh |
#136 | Crooked Lake Solar, LLC | Blytheville, AR | 386.1 GWh |
#137 | Holstein 1 Solar Farm | Wingate, TX | 379.4 GWh |
#138 | Buckthorn Westex | Ft. Stockton, TX | 378.1 GWh |
#139 | Raceway Solar & Storage | Lancaster, CA | 365.8 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Yellow Pine II.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
CityCenter Central Plant Cogen Units | Las Vegas, NV | 59.5 GWh | 34.2 mi |
Clark (NVE) | Las Vegas, NV | 1.1 TWh | 41.4 mi |
Dignity - San Martin | Las Vegas, NV | 3.4 GWh | 29 mi |
Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 38.1 mi |
Goodsprings Waste Heat Recovery | Jean, NV | 16.8 GWh | 28.1 mi |
Higgins Generating Station | Primm, NV | 2.8 TWh | 40.1 mi |
IGS LAS1 | Henderson, NV | 1.1 GWh | 36.8 mi |
IKEA Las Vegas 462 | Las Vegas, NV | 1.4 GWh | 28.5 mi |
Ivanpah 1 | Nipton, CA | 165.9 GWh | 42 mi |
Ivanpah 2 | Nipton, CA | 270.0 GWh | 40.2 mi |
Ivanpah 3 | Nipton, CA | 250.6 GWh | 38.3 mi |
Las Vegas Generating Station | North Las Vegas, NV | 571.8 GWh | 38.9 mi |
MDU / NVSS-II | Pahrump, NV | 31.4 GWh | 17.1 mi |
Silver State Solar Power North | Primm, NV | 114.2 GWh | 31.5 mi |
Silver State Solar Power South | Primm Valley, NV | 666.1 GWh | 40.5 mi |
Solar Las Vegas MB 2, LLC | Las Vegas, NV | 3.7 GWh | 34.4 mi |
Solar Las Vegas MB-1 | Las Vegas, NV | 4.6 GWh | 34.3 mi |
Stateline Solar | Nipton, CA | 619.9 GWh | 39.5 mi |
TJX Las Vegas | North Las Vegas, NV | 2.4 GWh | 41.4 mi |
Yellow Pine Solar | Enterprise, NV | 389.3 GWh | 1.1 mi |