Escape Solar Plant
TBD, TBD, NV 89034Plant Summary Information
Escape Solar Plant is ranked #32 out of 112 power plants in Nevada in terms of total annual net electricity generation.
Escape Solar Plant generated 151.7 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Escape Solar Plant |
|---|---|
| Utility Name | Escape Solar LLC |
| Location | Lincoln County, NV |
| Initial Operation Date | June 2025 |
| Last Update | May 2026 |
| Annual Generation | 323.5 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,922 out of 13,081 Power Plants Nationwide | |
| Ranked #261 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #32 out of 112 Nevada Power Plants | |
| Ranked #16 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Escape Solar Plant
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Escape Solar Plant.
Monthly Net Generation for Escape Solar Plant
Monthly Plant Fuel Consumption for Escape Solar Plant
Escape Solar Plant Details
| Summary Information | |
|---|---|
| Plant Name | Escape Solar Plant (67898) |
| Plant Address | TBD, TBD, NV 89034 |
| Utility | Escape Solar LLC (66467) |
| Latitude, Longitude | 36.89438, -114.08845 |
| Generation Dates on File | Jul 2025 to May 2026 |
| Initial Operation Date | June 2025 |
| Annual Generation | 323.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 25-49-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Lincoln County Power Dist No 1 (11021) NV |
| Grid Voltage | 138.00 kV |
| Energy Storage | Yes |
Generator ESPHB Details Operating November 2025
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | November 2025 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Cofire Fuels | No |
| Switch Between Oil And Natural Gas | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 400 |
|---|---|
| Maximum Charge Rate | 100 MW |
| Maximum Discharge Rate | 100 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 32.9 |
| Storage Enclosure Type | CS |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 67898 |
| Direct Support Gen Id | ESPHB |
| Support T D Asset | No |
Generator ESPH1 Details Operating June 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 70 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 70 MW |
| Winter Capacity | 70 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | June 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 87.52 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator ESPH2 Details Operating September 2025
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 115 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 115 MW |
| Winter Capacity | 115 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | September 2025 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | No |
|---|---|
| Bifacial | Yes |
| DC Net Capacity | 139.02 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Escape Solar Plant Plant Owners
| Owner Name | Address | Generator | Ownership |
|---|---|---|---|
| Estuary Power LLC | 50 West Liberty St Ste 430, Reno, NV 89501 | Generator ESPH1 | 100.00% |
| Estuary Power LLC | 50 West Liberty St Ste 430, Reno, NV 89501 | Generator ESPH2 | 100.00% |
| Estuary Power LLC | 50 West Liberty St Ste 430, Reno, NV 89501 | Generator ESPHB | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #251 | Golden Triangle II | St.Artesia, MS | 331.8 GWh |
| #252 | Quitman Solar | Quitman, GA | 336.6 GWh |
| #253 | Arlington Valley Solar Energy II | Arlington, AZ | 336.0 GWh |
| #254 | Samson Solar Energy | Cunningham, TX | 335.7 GWh |
| #255 | Edwards Sanborn E1A | Mojave, CA | 317.5 GWh |
| #256 | Edwards Sanborn E4 | Mojave, CA | 329.8 GWh |
| #257 | Elora Solar | Elora, TN | 333.8 GWh |
| #258 | BigBeau Solar, LLC | Rosamond, CA | 329.6 GWh |
| #259 | Driver Solar | Osceola, AR | 332.7 GWh |
| #260 | Twin Lakes Solar LLC | Monticello, IN | 331.7 GWh |
| #262 | Cove Mountain Solar 2 | Beryl, UT | 330.5 GWh |
| #263 | Maverick Solar, LLC | Desert Center, CA | 330.2 GWh |
| #264 | Sebree Solar, LLC | Robards, KY | 328.6 GWh |
| #265 | Buckthorn Westex | Ft. Stockton, TX | 325.5 GWh |
| #266 | Aragorn Solar Project | Van Horn, TX | 323.8 GWh |
| #267 | Blue Bird Solar, LLC | Warrenton, MO | 320.2 GWh |
| #268 | North Fork Solar Project | Snyder, OK | 319.5 GWh |
| #269 | Baldy Mesa Solar & Storage | Adelanto, CA | 313.3 GWh |
| #270 | Peacock Energy Project | Taft, TX | 318.2 GWh |
| #271 | Vikings Energy Farm | Holtville, CA | 295.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Escape Solar Plant.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Arrow Canyon Solar Hybrid | Moapa, NV | 601.7 GWh | 51.6 mi |
| Beryl Solar Plant | Beryl, UT | 6.5 GWh | 56.9 mi |
| Bloomington Power Plant | Bloomington, UT | 11.0 MWh | 27.5 mi |
| Bloomington Solar I | St George, UT | 4.3 GWh | 27.5 mi |
| Cove Mountain Solar | Beryl, UT | 161.8 GWh | 56.6 mi |
| Dry Lake Solar Energy Center | Moapa, NV | 362.7 GWh | 54.9 mi |
| Eagle Shadow Mountain Solar Farm | Moapa, NV | 907.0 GWh | 37.7 mi |
| Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh | 49.5 mi |
| Harry Allen | Las Vegas, NV | 3.0 TWh | 55.3 mi |
| Hurricane City Power | Hurricane, UT | 7.0 GWh | 48 mi |
| Millcreek Power Generation | St. George, UT | 145.0 GWh | 35 mi |
| Moapa Southern Paiute | Moapa, NV | 618.7 GWh | 45.4 mi |
| NV - Nokomis - CHI | Mesquite, NV | 2.9 GWh | 7.7 mi |
| Playa Solar 1, LLC | North Las Vegas, NV | 188.8 GWh | 56.5 mi |
| Playa Solar 2 | North Las Vegas, NV | 260.6 GWh | 56.5 mi |
| Quail Creek Hydro Plant #1 | Hurricane, UT | 7.4 GWh | 45 mi |
| Solomon Generating Facility | St. George, UT | 21.2 GWh | 30.5 mi |
| St George Red Rock | St George, UT | 12.0 MWh | 32.4 mi |
| Veyo Heat Recovery Project | Gunlock, UT | 9.6 GWh | 36.1 mi |
| Washington City Electric Generation | Washington, UT | 5.9 GWh | 40.1 mi |