Nellis Solar PV II
Kinley Drive, North Las Vegas, NV 89191Plant Summary Information
Nellis Solar PV II is ranked #49 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Nellis Solar PV II generated 8.5 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Nellis Solar PV II |
|---|---|
| Utility Name | Nevada Power Co |
| Location | Clark County, NV |
| Initial Operation Date | November 2015 |
| Last Update | May 2026 |
| Annual Generation | 8.5 GWh |
| Annual Consumption | 29.1 k MMBtu |
| Ranked #6,724 out of 13,081 Power Plants Nationwide | |
| Ranked #2,350 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #98 out of 112 Nevada Power Plants | |
| Ranked #49 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Nellis Solar PV II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nellis Solar PV II.
Monthly Net Generation for Nellis Solar PV II
Monthly Plant Fuel Consumption for Nellis Solar PV II
Nellis Solar PV II Details
| Summary Information | |
|---|---|
| Plant Name | Nellis Solar PV II (59919) |
| Plant Address | Kinley Drive, North Las Vegas, NV 89191 |
| Utility | Nevada Power Co (13407) |
| Latitude, Longitude | 36.20667, -115.0477 |
| Generation Dates on File | Nov 2015 to May 2026 |
| Initial Operation Date | November 2015 |
| Annual Generation | 8.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 12.40 kV |
| Energy Storage | No |
Generator NSPV2 Details Operating November 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 15 MW |
| Summer Capacity | 15 MW |
| Winter Capacity | 15 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2015 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 18 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Nellis Solar PV II Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2340 | Randall Solar Project Hybrid | Berlin, MA | 8.5 GWh |
| #2341 | BRE | Oxford, NC | 8.6 GWh |
| #2342 | Innovative Solar 63, LLC | Snow Hill, NC | 8.6 GWh |
| #2343 | Citizen B | Mendota, CA | 8.6 GWh |
| #2344 | Old Middleboro Road Solar | Rochester, MA | 8.4 GWh |
| #2345 | NSF Torrey Site 3 | Torrey, NY | 8.6 GWh |
| #2346 | NSF Torrey Site 2 | Torrey, NY | 8.6 GWh |
| #2347 | NSF Torrey Site 1 | Torrey, NY | 8.6 GWh |
| #2348 | Sedberry Farm | Carthage, NC | 8.5 GWh |
| #2349 | Plott Hound Solar | New Bern, NC | 8.5 GWh |
| #2351 | Flint Hill Solar, LLC | Carthage, NC | 8.5 GWh |
| #2352 | Whitesboro Solar II | Whitesboro, TX | 8.5 GWh |
| #2353 | SEPV Imperial Dixieland West | Imperial, CA | 8.5 GWh |
| #2354 | Cyril | Cyril, OK | 8.5 GWh |
| #2355 | Star Solar | Durham, NC | 8.5 GWh |
| #2356 | Bellisario Solar 2 | Lapeer, NY | 8.5 GWh |
| #2357 | Syncarpha Puddon I Hybrid CSG | Northbridge, MA | 8.4 GWh |
| #2358 | Scandia CSG | Scandia, MN | 8.5 GWh |
| #2359 | Double J Dairy Array | Visalia, CA | 8.5 GWh |
| #2360 | Richmond CSG | Richmond, MN | 8.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nellis Solar PV II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apex Solar PV Power Project | North Las Vegas, NV | 48.0 GWh | 13.4 mi |
| Chuck Lenzie Generating Station | Apex, NV | 6.3 TWh | 14.1 mi |
| CityCenter Central Plant Cogen Units | Las Vegas, NV | 62.5 GWh | 10.2 mi |
| Clark (NVE) | Las Vegas, NV | 916.9 GWh | 8.2 mi |
| IGS VGT | North Las Vegas, NV | 2.1 GWh | 4.4 mi |
| Las Vegas Generating Station | North Las Vegas, NV | 671.7 GWh | 4.5 mi |
| Las Vegas WPCF Solar Plant | Las Vegas, NV | 4.8 GWh | 5 mi |
| Mountain View Solar | North Las Vegas, NV | 52.1 GWh | 13.5 mi |
| Nellis Air Force Base Solar Array | Las Vegas, NV | 23.4 GWh | 3.7 mi |
| Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 298.7 GWh | 11.8 mi |
| Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 255.0 GWh | 9.5 mi |
| Republic Services Renewable Energy, LLC | Las Vegas, NV | 25.5 GWh | 14.2 mi |
| River Mountains Solar | Henderson, NV | 30.8 GWh | 13.8 mi |
| Saguaro Power | Henderson, NV | 264.5 GWh | 11.6 mi |
| Solar Las Vegas MB 2, LLC | Las Vegas, NV | 4.6 GWh | 10.9 mi |
| Solar Las Vegas MB-1 | Las Vegas, NV | 9.3 GWh | 10.9 mi |
| Spectrum Solar PV Power Project | Las Vegas, NV | 81.8 GWh | 10 mi |
| Speedway North Bldg 1-sllas701 | Las Vegas, NV | 582.0 MWh | 4.1 mi |
| Sun Peak Generating Station | Las Vegas, NV | 29.8 GWh | 4.8 mi |
| TJX Las Vegas | North Las Vegas, NV | 2.3 GWh | 3.6 mi |