Boulder Solar II, LLC
17445 South US HWY 95, Boulder City, NV 89005Plant Summary Information
Boulder Solar II, LLC is ranked #29 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Boulder Solar II, LLC generated 25.2 GWh during the 3-month period between February 2026 to May 2026.
| Plant Name | Boulder Solar II, LLC |
|---|---|
| Utility Name | Invenergy Services LLC |
| Location | Clark County, NV |
| Initial Operation Date | January 2017 |
| Last Update | May 2026 |
| Annual Generation | 104.0 GWh |
| Annual Consumption | 396.2 k MMBtu |
| Ranked #3,436 out of 13,081 Power Plants Nationwide | |
| Ranked #881 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #56 out of 112 Nevada Power Plants | |
| Ranked #29 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
AEP Renewables (2016 to 2022) Invenergy Services LLC (2023 to 2025) |
Map of Boulder Solar II, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Boulder Solar II, LLC.
Monthly Net Generation for Boulder Solar II, LLC
Monthly Plant Fuel Consumption for Boulder Solar II, LLC
Boulder Solar II, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Boulder Solar II, LLC (60885) |
| Plant Address | 17445 South US HWY 95, Boulder City, NV 89005 |
| Utility | Invenergy Services LLC (49893) |
| Latitude, Longitude | 35.85, -114.944 |
| Generation Dates on File | Jan 2017 to May 2026 |
| Initial Operation Date | January 2017 |
| Annual Generation | 104.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator BSII Details Operating January 2017
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 50 MW |
| Summer Capacity | 50 MW |
| Winter Capacity | 50 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | January 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 62.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Boulder Solar II, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #871 | Beacon Solar Plant Site 2 | Cantil, CA | 107.0 GWh |
| #872 | SR Turkey Creek, LLC | Lancaster, KY | 107.0 GWh |
| #873 | Little Bear 5 | Mendota, CA | 106.9 GWh |
| #874 | BT Signal Ranch | Quinlan, TX | 106.6 GWh |
| #875 | SR Lambert I, LLC | Georgetown, SC | 105.9 GWh |
| #876 | Ocotillo Wells | Borrego Springs, CA | 105.9 GWh |
| #877 | Salt City Solar Project - Hybrid | Circleville, OH | 105.8 GWh |
| #878 | Ranchland Solar, LLC | Moyock, NC | 105.6 GWh |
| #879 | Warsaw Farm | Warsaw, NC | 105.4 GWh |
| #880 | Little Manatee River Solar | Ruskin, FL | 105.3 GWh |
| #882 | Wildwood Solar Plant | Tutwiler, MS | 103.6 GWh |
| #883 | Vancourt Solar Interconnections | La Feria, TX | 103.6 GWh |
| #884 | Prairie Solar LLC | Sidney, IL | 103.3 GWh |
| #885 | Oak Hill - Dry Creek | Henderson, TX | 103.1 GWh |
| #886 | Half Moon Solar Plant | Lake Panasoffkee, FL | 102.8 GWh |
| #887 | Tyson Nick | Paris, TX | 102.5 GWh |
| #888 | East Point Energy Center | Sharon Springs, NY | 102.2 GWh |
| #889 | Split Rail Solar Energy LLC | Warrenton, MO | 102.2 GWh |
| #890 | Bladen Solar | Fayetteville, NC | 102.2 GWh |
| #891 | Red Horse 2 | Willcox, AZ | 148.3 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Boulder Solar II, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar Power, LLC | Boulder City, NV | 276.9 GWh | 1.8 mi |
| CM10 | Boulder City, NV | 18.4 GWh | 5.1 mi |
| CM48 | Boulder City, NV | 89.7 GWh | 5.5 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh | 4.5 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 603.2 GWh | 2.8 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 248.3 GWh | 5 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 695.5 GWh | 5.4 mi |
| Desert Star Energy Center | Boulder City, NV | 328.9 GWh | 5.1 mi |
| Dignity - Siena Campus | Henderson, NV | 2.8 GWh | 14.3 mi |
| Hoover Dam (NV) | Boulder City, NV | 1.3 TWh | 16.2 mi |
| IGS LAS1 | Henderson, NV | 2.1 GWh | 14 mi |
| Nevada Solar One | Boulder City, NV | 96.5 GWh | 4.1 mi |
| River Mountains Solar | Henderson, NV | 30.8 GWh | 12.6 mi |
| Saguaro Power | Henderson, NV | 264.5 GWh | 13.8 mi |
| Techren Solar I LLC | Boulder, NV | 222.9 GWh | 1.7 mi |
| Techren Solar II LLC | Boulder, NV | 450.8 GWh | 1.4 mi |
| Techren Solar III LLC | Boulder, NV | 53.2 GWh | 1.6 mi |
| Techren Solar IV LLC | Boulder, NV | 55.0 GWh | 3 mi |
| Techren Solar V | Boulder, NV | 107.7 GWh | 3.6 mi |
| Townsite Solar Project Hybrid | Boulder City, NV | 465.2 GWh | 6.9 mi |