Techren Solar III LLC
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar III LLC is ranked #37 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Techren Solar III LLC generated 15.2 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Techren Solar III LLC |
|---|---|
| Utility Name | Techren Solar III LLC |
| Location | Clark County, NV |
| Initial Operation Date | October 2020 |
| Last Update | Aug 2026 |
| Annual Generation | 50.2 GWh |
| Annual Consumption | 190.4 k MMBtu |
| Ranked #4,275 out of 13,301 Power Plants Nationwide | |
| Ranked #1,180 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #78 out of 112 Nevada Power Plants | |
| Ranked #37 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Techren Solar III LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar III LLC.
Monthly Net Generation for Techren Solar III LLC
Monthly Plant Fuel Consumption for Techren Solar III LLC
Techren Solar III LLC Details
| Summary Information | |
|---|---|
| Plant Name | Techren Solar III LLC (61931) |
| Plant Address | 15103 Highway US 95 South, Boulder, NV 89005 |
| Utility | Techren Solar III LLC (61534) |
| Latitude, Longitude | 35.84411, -114.9713 |
| Generation Dates on File | Sep 2020 to Aug 2026 |
| Initial Operation Date | October 2020 |
| Annual Generation | 50.2 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | EG17-76-000, EG17137-000 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator TECH3 Details Operating October 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| RTO ISO LMP Node Designation | NSO_2_N008 |
| RTO ISO Location Designation For Reporting Wholesale Sales Data | NSO_2_N008 |
| Nameplate Capacity | 25 MW |
| Summer Capacity | 25 MW |
| Winter Capacity | 25 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2020 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Fixed Tilt | No |
| Azimuth Angle | 180 |
| DC Net Capacity | 33 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Techren Solar III LLC Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| KKR/GA | 30 Hudson Yards, New York, NY 10001 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1170 | Fort Gordon Solar Facility | Fort Gordon, GA | 51.4 GWh |
| #1171 | Cascade Solar | Joshua Tree, CA | 51.4 GWh |
| #1172 | RE Rosamond One LLC | Rosamond, CA | 51.2 GWh |
| #1173 | RE Gaskell West 3 LLC | Rosamond, CA | 50.8 GWh |
| #1174 | Pumpjack Solar I | McKittrick, CA | 50.6 GWh |
| #1175 | RE Kansas South LLC | Lemoore, CA | 50.5 GWh |
| #1176 | Ripley | La Plata, MD | 50.5 GWh |
| #1177 | EE Waianae Solar Project | Waianae, HI | 50.5 GWh |
| #1178 | Maricopa West Solar PV, LLC | Taft, CA | 50.3 GWh |
| #1179 | Simon Solar Farm LLC | Social Circle, GA | 50.2 GWh |
| #1181 | Paulsell | Crows Landing, CA | 47.4 GWh |
| #1182 | Rockhound C | Odessa, TX | 50.0 GWh |
| #1183 | Antelope Big Sky Ranch | Lancaster, CA | 49.9 GWh |
| #1184 | ATLAS Solar V, LLC | Salome, AZ | 49.8 GWh |
| #1185 | St. James Solar (LA) | Vacherie, LA | 49.6 GWh |
| #1186 | Picture Rocks Solar, LLC | Marana, AZ | 49.6 GWh |
| #1187 | Alamo Solar | Oro Grande, CA | 49.3 GWh |
| #1188 | Vega Solar | Los Banos, CA | 49.3 GWh |
| #1189 | Oro Loma | Oro Loma, CA | 49.2 GWh |
| #1190 | Almond | Lemoore, CA | 49.2 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar III LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 99.5 GWh | 1.6 mi |
| Boulder Solar Power, LLC | Boulder City, NV | 272.8 GWh | 0.7 mi |
| Clark (NVE) | Las Vegas, NV | 1.1 TWh | 17.4 mi |
| CM10 | Boulder City, NV | 18.4 GWh | 4.1 mi |
| CM48 | Boulder City, NV | 89.7 GWh | 4.5 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 726.0 GWh | 4 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 596.4 GWh | 3.2 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 248.3 GWh | 4.3 mi |
| Copper Mountain Solar 5, LLC | Boulder City, NV | 688.5 GWh | 4.7 mi |
| Desert Star Energy Center | Boulder City, NV | 599.8 GWh | 4 mi |
| Dignity - Siena Campus | Henderson, NV | 2.8 GWh | 13.7 mi |
| IGS LAS1 | Henderson, NV | 2.1 GWh | 13 mi |
| Nevada Solar One | Boulder City, NV | 92.6 GWh | 3.1 mi |
| River Mountains Solar | Henderson, NV | 30.8 GWh | 13.2 mi |
| Saguaro Power | Henderson, NV | 145.1 GWh | 13.8 mi |
| Techren Solar I LLC | Boulder, NV | 217.8 GWh | 0.5 mi |
| Techren Solar II LLC | Boulder, NV | 449.2 GWh | 1.8 mi |
| Techren Solar IV LLC | Boulder, NV | 57.2 GWh | 3.9 mi |
| Techren Solar V | Boulder, NV | 118.7 GWh | 4.6 mi |
| Townsite Solar Project Hybrid | Boulder City, NV | 458.2 GWh | 8.1 mi |