Tesla Reno GigaFactory
1 Electric Ave, Sparks, NV 89434Plant Summary Information
Tesla Reno GigaFactory is ranked #50 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Tesla Reno GigaFactory generated 827.0 MWh during the 3-month period between September 2024 to December 2024.
Plant Name | Tesla Reno GigaFactory |
---|---|
Utility Name | Tesla Inc. |
Location | Storey County, NV |
Initial Operation Date | June 2019 |
Last Update | Dec 2024 |
Annual Generation | 8.7 GWh |
Annual Consumption | 31.3 k MMBtu |
Ranked #6,472 out of 12,288 Power Plants Nationwide | |
Ranked #2,034 out of 6,174 Solar Power Plants Nationwide | |
Ranked #98 out of 107 Nevada Power Plants | |
Ranked #50 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Tesla Reno GigaFactory
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tesla Reno GigaFactory.
Monthly Net Generation for Tesla Reno GigaFactory
Tesla Reno GigaFactory Details
Summary Information | |
---|---|
Plant Name | Tesla Reno GigaFactory (64098) |
Plant Address | 1 Electric Ave, Sparks, NV 89434 |
Utility | Tesla Inc. (57313) |
Latitude, Longitude | 39.53951, -119.43916 |
Generation Dates on File | Jan 2020 to Dec 2024 |
Initial Operation Date | June 2019 |
Annual Generation | 8.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Transportation Equipment Manufacturing (336) |
Sector | Industrial Non-CHP (6) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 36.60 kV / 0.48 kV |
Energy Storage | No |
Generator 2 Details Operating June 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.5 MW |
Summer Capacity | 0.5 MW |
Winter Capacity | 0.5 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | June 2019 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 8 |
DC Net Capacity | 0.6 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 1 Details Operating July 2019
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.4 MW |
Summer Capacity | 0.4 MW |
Winter Capacity | 0.4 MW |
Minimum Load | 0.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2019 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 90 |
Tilt Angle | 8 |
DC Net Capacity | 0.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator 5 Details Operating November 2021
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 0.9 MW |
Summer Capacity | 0.9 MW |
Winter Capacity | 0.9 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | November 2021 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
East West Fixed Tilt | No |
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator RA Details Operating March 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.1 MW |
Summer Capacity | 1.1 MW |
Winter Capacity | 1.1 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | March 2022 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 1.3 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator RB Details Operating April 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 1.8 MW |
Summer Capacity | 1.8 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | April 2022 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.2 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator RC Details Operating July 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 2 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | July 2022 |
Combined Heat & Power | No |
Sector Name | Industrial Non-CHP (6) |
Energy Source | Solar |
Solar Details | |
Fixed Tilt | Yes |
---|---|
Azimuth Angle | 180 |
Tilt Angle | 25 |
DC Net Capacity | 2.4 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Tesla Reno GigaFactory Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#2024 | Old Pageland Monroe Road Solar Farm | Monroe, NC | 8.8 GWh |
#2025 | Waco Farm | Waco, NC | 8.8 GWh |
#2026 | Sunfish Farm | Willow Spring, NC | 8.8 GWh |
#2027 | Clovelly Solar | Lillington, NC | 8.8 GWh |
#2028 | ZV Solar 2, LLC | Red Springs, NC | 8.8 GWh |
#2029 | South Winston Farm, LLC | Winston-Salem, NC | 8.8 GWh |
#2030 | Benthall Bridge PV 1 | Murfreesboro, NC | 8.8 GWh |
#2031 | Sherburne North Project CSG | St. Cloud, MN | 8.7 GWh |
#2032 | DOCCS Eastern | Wawarsing, NY | 8.7 GWh |
#2033 | AM Best Farm | Goldsboro, NC | 8.7 GWh |
#2035 | Mohawk View Solar | Fultonville, NY | 8.7 GWh |
#2036 | MontSun Community Solar | Montrose, MN | 8.7 GWh |
#2037 | Cyril | Cyril, OK | 8.7 GWh |
#2038 | Arndt Farm | Claremont, NC | 8.7 GWh |
#2039 | Vicksburg Solar | Henderson, NC | 8.7 GWh |
#2040 | Barker Solar, LLC | Lumberton, NC | 8.7 GWh |
#2041 | West Street Solar 1 LLC | Gardner, MA | 8.7 GWh |
#2042 | AVS Lancaster 1 | Lancaster, CA | 8.7 GWh |
#2043 | Two Lines Farm | Hickory, NC | 8.7 GWh |
#2044 | Littlefield Solar Center LLC | Ayden, NC | 8.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tesla Reno GigaFactory.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Brady | Fallon, NV | 88.7 GWh | 28.9 mi |
Desert Peak Power Plant | Fernley, NV | 72.7 GWh | 29.8 mi |
Fleish | Fleish, NV | 20.7 GWh | 19.4 mi |
Ft. Churchill PV | Yerington, NV | 22.2 GWh | 32.6 mi |
Galena 2 Geothermal Power Plant | Reno, NV | 36.7 GWh | 20.8 mi |
Galena 3 Geothermal Power Plant | Reno, NV | 82.6 GWh | 19.5 mi |
Patua Acquisition Project, LLC | Hazen, NV | 133.5 GWh | 19.8 mi |
Richard Burdette Geothermal | Reno, NV | 97.6 GWh | 19.7 mi |
Soda Lake 3 | Fallon, NV | 123.1 GWh | 31.4 mi |
Steamboat Hills LP | Reno, NV | 231.7 GWh | 21 mi |
Steamboat II | Reno, NV | 62.7 GWh | 19.2 mi |
Steamboat III | Reno, NV | 69.4 GWh | 19.3 mi |
Tracy | Sparks, NV | 4.0 TWh | 4.8 mi |
Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 5.5 mi |
Turquoise Nevada, LLC | Sparks, NV | 109.1 GWh | 5.1 mi |
Verdi | Verdi, NV | 18.9 GWh | 17.5 mi |
Washoe | Verdi, NV | 14.4 GWh | 17.6 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 10.2 mi |
Western 102 Power Plant | McCarran, NV | 442.6 GWh | 4.1 mi |
Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 29.4 mi |