Stillwater Solar PV II
4637 Lawrence Lane, Fallon, NV 89406Plant Summary Information
Stillwater Solar PV II is ranked #44 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Stillwater Solar PV II generated 6.7 GWh during the 3-month period between March 2025 to June 2025.
| Plant Name | Stillwater Solar PV II |
|---|---|
| Utility Name | Ormat Stillwater Solar PV II, LLC |
| Location | Churchill County, NV |
| Initial Operation Date | June 2018 |
| Last Update | Jun 2025 |
| Annual Generation | 24.6 GWh |
| Annual Consumption | 93.0 k MMBtu |
| Ranked #5,106 out of 13,081 Power Plants Nationwide | |
| Ranked #1,478 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #88 out of 112 Nevada Power Plants | |
| Ranked #44 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
EGP Stillwater Solar PV II, LLC (2017 to 2023) Ormat Stillwater Solar PV II, LLC (2024 to 2025) |
Map of Stillwater Solar PV II
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Stillwater Solar PV II.
Monthly Net Generation for Stillwater Solar PV II
Monthly Plant Fuel Consumption for Stillwater Solar PV II
Stillwater Solar PV II Details
| Summary Information | |
|---|---|
| Plant Name | Stillwater Solar PV II (61809) |
| Plant Address | 4637 Lawrence Lane, Fallon, NV 89406 |
| Utility | Ormat Stillwater Solar PV II, LLC (61435) |
| Latitude, Longitude | 39.54204, -118.56015 |
| Generation Dates on File | Jun 2018 to Jun 2025 |
| Initial Operation Date | June 2018 |
| Annual Generation | 24.6 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
| Grid Voltage | 60.00 kV |
| Energy Storage | No |
Generator STWII Details Operating June 2018
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 20 MW |
| Summer Capacity | 20 MW |
| Winter Capacity | 20 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | June 2018 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Fixed Tilt | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 30 |
| DC Net Capacity | 24 MW |
| Thin Film A Si | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Stillwater Solar PV II Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Enel Green Power NA, Inc. | 100 Brickstone Square, Suite 300, Andover, MA 1810 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1468 | Sylvan Solar | Pillager, MN | 25.1 GWh |
| #1469 | Shifting Sands Solar, LLC | Ridgeway, VA | 25.0 GWh |
| #1470 | Fort Rock I | Silver Lake, OR | 24.9 GWh |
| #1471 | Coolidge Solar 1, LLC | Ludlow, VT | 24.9 GWh |
| #1472 | Letts Creek Solar, LLC | Grass Lake, MI | 24.9 GWh |
| #1473 | Grandy PV 1 | Grandy, NC | 24.9 GWh |
| #1474 | Elk Hill Solar 2 | Peters Township, PA | 24.8 GWh |
| #1475 | Suntex Solar, LLC | Riley, OR | 24.7 GWh |
| #1476 | Rock Garden Solar, LLC | Fort Rock, OR | 24.7 GWh |
| #1477 | Two Mile Desert Project | Hertford, NC | 24.6 GWh |
| #1479 | Wildberry | Moscow, TN | 24.6 GWh |
| #1480 | Milo PV - BD Solar 1 LLC | Milo, ME | 24.5 GWh |
| #1481 | Depot Solar Center, LLC | Rustburg, VA | 24.4 GWh |
| #1482 | Riley | Riley, OR | 24.3 GWh |
| #1483 | Lone Valley Solar Park I LLC | Lucerne Valley, CA | 24.2 GWh |
| #1484 | Naval Air Weapons Station China Lake | Ridgecrest, CA | 24.2 GWh |
| #1485 | Whitakers | Whitakers, NC | 24.2 GWh |
| #1486 | SEPV Palmdale East | Palmdale, CA | 24.2 GWh |
| #1487 | Santa Fe Solar Energy Center | Santa Fe, NM | 24.1 GWh |
| #1488 | Alton Road Solar | Bradford, RI | 24.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Stillwater Solar PV II.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Brady | Fallon, NV | 83.3 GWh | 29.7 mi |
| Desert Peak Power Plant | Fernley, NV | 78.2 GWh | 25.5 mi |
| Dixie Valley | Fallon, NV | 463.5 GWh | 47.5 mi |
| Don A Campbell 1 Geothermal | Gabbs, NV | 97.0 GWh | 50.4 mi |
| Don A Campbell 2 Geothermal | Luning, NV | 88.6 GWh | 50.4 mi |
| Fort Churchill | Yerington, NV | 552.3 GWh | 41.9 mi |
| Ft. Churchill PV | Yerington, NV | 7.1 GWh | 42.2 mi |
| Lahontan | Fallon, NV | 7.9 GWh | 27.6 mi |
| New Lahontan | Fallon, NV | 11.7 GWh | 27.5 mi |
| Patua Acquisition Project, LLC | Hazen, NV | 103.3 GWh | 27.5 mi |
| Salt Wells | Fallon, NV | 63.4 GWh | 17.1 mi |
| Soda Lake 3 | Fallon, NV | 108.3 GWh | 15.5 mi |
| Stillwater Facility | Fallon, NV | 90.6 GWh | 0.5 mi |
| Tesla Reno GigaFactory | Sparks, NV | 5.1 GWh | 46.8 mi |
| Tracy | Sparks, NV | 3.7 TWh | 51.4 mi |
| Tungsten Mountain | Fallon, NV | 283.1 GWh | 46.9 mi |
| Turquoise Liberty Solar | Sparks, NV | 7.9 GWh | 51.2 mi |
| Turquoise Nevada, LLC | Sparks, NV | 108.3 GWh | 51.4 mi |
| Western 102 Power Plant | McCarran, NV | 385.1 GWh | 50.7 mi |
| Whitegrass No. 1 | Yerington, NV | 17.0 GWh | 42.2 mi |