Moapa Southern Paiute
1 Lincoln Street, Moapa, NV 89025Plant Summary Information
Moapa Southern Paiute is ranked #45 out of 6,366 solar farms nationwide in terms of total annual net electricity generation.
Moapa Southern Paiute generated 181.0 GWh during the 3-month period between March 2025 to June 2025.
Plant Name | Moapa Southern Paiute |
---|---|
Utility Name | Arevon Energy, Inc. |
Location | Clark County, NV |
Initial Operation Date | December 2016 |
Last Update | Jun 2025 |
Annual Generation | 616.7 GWh |
Annual Consumption | 2.3 M MMBtu |
Ranked #1,095 out of 12,513 Power Plants Nationwide | |
Ranked #45 out of 6,366 Solar Power Plants Nationwide | |
Ranked #17 out of 109 Nevada Power Plants | |
Ranked #6 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Previous Operators |
K Road Moapa Solar LLC (2013 to 2013) First Solar Asset Management (2014 to 2017) CD Arevon USA, Inc. (2018 to 2021) Arevon Energy, Inc. (2022 to 2024) |
Map of Moapa Southern Paiute
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Moapa Southern Paiute.
Monthly Net Generation for Moapa Southern Paiute
Moapa Southern Paiute Details
Summary Information | |
---|---|
Plant Name | Moapa Southern Paiute (57859) |
Plant Address | 1 Lincoln Street, Moapa, NV 89025 |
Utility | Arevon Energy, Inc. (61230) |
Latitude, Longitude | 36.52995, -114.77031 |
Generation Dates on File | Oct 2016 to Jun 2025 |
Initial Operation Date | December 2016 |
Annual Generation | 616.7 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | No |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator 1 Details Operating December 2016
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Jointly Owned |
Nameplate Capacity | 250 MW |
Summer Capacity | 250 MW |
Winter Capacity | 250 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2016 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | No |
---|---|
Fixed Tilt | Yes |
Azimuth Angle | 180 |
Tilt Angle | 30 |
DC Net Capacity | 344.3 MW |
Thin Film CDTE | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Moapa Southern Paiute Plant Owners
Owner Name | Address | Ownership |
---|---|---|
Moapa Southern Paiute LLC | 350 West Washington St, Tempe, AZ 85281 | 65.00% |
Goldman Sachs/General Electric | 1050 Thomas Jefferson Street NW, Washington, DC 20007 | 35.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#35 | Silver State Solar Power South | Primm Valley, NV | 675.2 GWh |
#36 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
#37 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
#38 | Arlington Energy Center II | Blythe, CA | 639.8 GWh |
#39 | IP Radian, LLC | Brookesmith, TX | 647.1 GWh |
#40 | Aquamarine | Lemoore, CA | 646.4 GWh |
#41 | Genesis Solar Energy Project | Blythe, CA | 631.8 GWh |
#42 | Arrow Canyon Solar Hybrid | Moapa, NV | 605.9 GWh |
#43 | Stateline Solar | Nipton, CA | 619.9 GWh |
#44 | Oberon II Solar Project | Desert Center, CA | 600.1 GWh |
#46 | Copper Mountain Solar 3 | Boulder City, NV | 612.7 GWh |
#47 | Blythe Mesa Solar II | Blythe, CA | 592.4 GWh |
#48 | Victory Pass | Desert Center, CA | 600.3 GWh |
#49 | Oberon Solar Project | Desert Center, CA | 583.3 GWh |
#50 | California Valley Solar Ranch | California Valley, CA | 597.7 GWh |
#51 | Mojave Solar Project | Hinkley, CA | 592.9 GWh |
#52 | Titan Solar Project | Van Horn, TX | 592.9 GWh |
#53 | Bighorn Solar 1 | Pueblo, CO | 592.5 GWh |
#54 | Blythe Solar 110, LLC | Blythe, CA | 580.5 GWh |
#55 | Oxbow Solar 1 | New Roads, LA | 584.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Moapa Southern Paiute.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Generating Station | Las Vegas, NV | 1.3 TWh | 13.2 mi |
Apex Solar PV Power Project | North Las Vegas, NV | 50.3 GWh | 14.7 mi |
Arrow Canyon Solar Hybrid | Moapa, NV | 605.9 GWh | 6.4 mi |
Chuck Lenzie Generating Station | Apex, NV | 5.0 TWh | 13.2 mi |
Dry Lake Solar Energy Center | Moapa, NV | 348.6 GWh | 9.8 mi |
Eagle Shadow Mountain Solar Farm | Moapa, NV | 915.3 GWh | 8.4 mi |
Gemini Solar Hybrid | Unincorporated, NV | 2.2 TWh | 4.7 mi |
Harry Allen | Las Vegas, NV | 3.3 TWh | 10.1 mi |
Harry Allen Solar Energy LLC | Apex, NV | 298.6 GWh | 11.9 mi |
IGS VGT | North Las Vegas, NV | 2.1 GWh | 23.6 mi |
Mountain View Solar | North Las Vegas, NV | 53.6 GWh | 14.5 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 23.8 GWh | 24.4 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 323.1 GWh | 15.4 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 334.7 GWh | 21.9 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 180.5 GWh | 11.4 mi |
Playa Solar 2 | North Las Vegas, NV | 253.1 GWh | 11.4 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 26.3 GWh | 13.2 mi |
Silverhawk | North Las Vegas, NV | 2.9 TWh | 13.5 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 84.0 GWh | 21.5 mi |
TJX Las Vegas | North Las Vegas, NV | 2.4 GWh | 25.9 mi |