Ft. Churchill PV
189 Sierra Way, Yerington, NV 89447Plant Summary Information
Ft. Churchill PV is ranked #51 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Ft. Churchill PV generated 493.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Ft. Churchill PV |
|---|---|
| Utility Name | Sierra Pacific Power Co |
| Location | Lyon County, NV |
| Initial Operation Date | May 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 7.1 GWh |
| Annual Consumption | 26.1 k MMBtu |
| Ranked #7,364 out of 13,081 Power Plants Nationwide | |
| Ranked #2,854 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #101 out of 112 Nevada Power Plants | |
| Ranked #51 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Apple, Inc (2014 to 2020) Sierra Pacific Power Co (2021 to 2025) |
Map of Ft. Churchill PV
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Ft. Churchill PV.
Monthly Net Generation for Ft. Churchill PV
Monthly Plant Fuel Consumption for Ft. Churchill PV
Ft. Churchill PV Details
| Summary Information | |
|---|---|
| Plant Name | Ft. Churchill PV (59472) |
| Plant Address | 189 Sierra Way, Yerington, NV 89447 |
| Utility | Sierra Pacific Power Co (17166) |
| Latitude, Longitude | 39.12806, -119.14 |
| Generation Dates on File | May 2015 to Dec 2025 |
| Initial Operation Date | May 2015 |
| Annual Generation | 7.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Computing Infrastructure Providers, Data Processing, Web Hosting, and Related Services (518) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 60.00 kV |
| Energy Storage | No |
Generator NVC7 Details Operating May 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 19.9 MW |
| Summer Capacity | 19.5 MW |
| Winter Capacity | 19.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | May 2015 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Lenses Mirrors | Yes |
|---|---|
| Single Axis Tracking | Yes |
| Parabolic Trough | No |
| Azimuth Angle | 90 |
| DC Net Capacity | 20.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Ft. Churchill PV Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2844 | Blanchard Road 1 Community Solar | Clayton, NY | 7.1 GWh |
| #2845 | Amazon JFK8 Solar Project | Staten Island, NY | 7.1 GWh |
| #2846 | Keystone Solar | Quarryville, PA | 7.1 GWh |
| #2847 | Tides Lane Farm | Louisburg, NC | 7.1 GWh |
| #2848 | Mass Midstate Solar 1 | Warren, MA | 7.1 GWh |
| #2849 | Fisher Road Solar | Dartmouth, MA | 7.1 GWh |
| #2850 | Seagrove | Seagrove, NC | 7.1 GWh |
| #2851 | Iron Horse Solar 4, LLC | North Billerica, MA | 7.1 GWh |
| #2852 | Athens AT01 | Athens, ME | 7.1 GWh |
| #2853 | Talco Solar Project | Talco, TX | 7.1 GWh |
| #2855 | Glenville Solar (CSG) | Glenville, NY | 7.1 GWh |
| #2856 | Yanceyville Farm | Blanch, NC | 7.1 GWh |
| #2857 | Enfield Solar Site 2 | Enfield, NY | 7.1 GWh |
| #2858 | Enfield Solar Site 3 | Enfield, NY | 7.1 GWh |
| #2859 | Enfield Solar Site 1 | Enfield, NY | 7.1 GWh |
| #2860 | Currin Solar, LLC | Oxford, NC | 7.1 GWh |
| #2861 | 1639 RT 29 Solar 1 | Gloversville, NY | 7.1 GWh |
| #2862 | Suffolk CSG, LLC | Suffolk, VA | 7.1 GWh |
| #2863 | Amaterasu LLC | Lancaster, MA | 7.0 GWh |
| #2864 | Lowndes Cowart | Valdosta, GA | 7.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Ft. Churchill PV.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Fleish | Fleish, NV | 21.3 GWh | 26.6 mi |
| Fort Churchill | Yerington, NV | 552.3 GWh | 0.4 mi |
| Galena 2 Geothermal Power Plant | Reno, NV | 25.1 GWh | 37.5 mi |
| Galena 3 Geothermal Power Plant | Reno, NV | 77.9 GWh | 37.2 mi |
| Lahontan | Fallon, NV | 7.9 GWh | 23.4 mi |
| New Lahontan | Fallon, NV | 11.7 GWh | 23.5 mi |
| Patua Acquisition Project, LLC | Hazen, NV | 103.3 GWh | 31.8 mi |
| Salt Wells | Fallon, NV | 63.4 GWh | 32.5 mi |
| Soda Lake 3 | Fallon, NV | 108.3 GWh | 33.3 mi |
| Steamboat Hills LP | Reno, NV | 233.9 GWh | 37.5 mi |
| Steamboat II | Reno, NV | 62.1 GWh | 37.4 mi |
| Steamboat III | Reno, NV | 72.7 GWh | 37.3 mi |
| Tesla Reno GigaFactory | Sparks, NV | 5.1 GWh | 32.6 mi |
| Tracy | Sparks, NV | 3.7 TWh | 36.4 mi |
| Turquoise Nevada, LLC | Sparks, NV | 108.3 GWh | 37 mi |
| Verdi | Verdi, NV | 19.7 GWh | 27 mi |
| Washoe | Verdi, NV | 14.9 GWh | 25.5 mi |
| Waste Management Lockwood LFGTE | Sparks, NV | 25.2 GWh | 36 mi |
| Western 102 Power Plant | McCarran, NV | 385.1 GWh | 35.8 mi |
| Whitegrass No. 1 | Yerington, NV | 17.0 GWh | 3.3 mi |