Harry Allen
14601 North Las Vegas Blvd, Las Vegas, NV 89124Plant Summary Information
Harry Allen is ranked #5 out of 109 power plants in Nevada in terms of total annual net electricity generation.
Harry Allen is comprised of 5 generators and generated 749.9 GWh during the 3-month period between April 2024 to July 2024.
Plant Name | Harry Allen |
---|---|
Utility Name | Nevada Power Co |
Location | Clark County, NV |
Initial Operation Date | May 1995 |
Last Update | Jul 2024 |
Annual Generation | 2.3 TWh |
Annual Consumption | 20.2 M MMBtu |
Ranked #476 out of 11,825 Power Plants Nationwide | |
Ranked #293 out of 2,250 Natural Gas Power Plants Nationwide | |
Ranked #5 out of 109 Nevada Power Plants | |
Ranked #5 out of 17 Nevada Natural Gas Power Plants | |
Fuel Types | Natural Gas |
Map of Harry Allen
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Harry Allen.
Monthly Net Generation for Harry Allen
Harry Allen Details
Summary Information | |
---|---|
Plant Name | Harry Allen (7082) |
Plant Address | 14601 North Las Vegas Blvd, Las Vegas, NV 89124 |
Utility | Nevada Power Co (13407) |
Latitude, Longitude | 36.43055, -114.90241 |
Generation Dates on File | Mar 2003 to Jul 2024 |
Initial Operation Date | May 1995 |
Annual Generation | 2.3 TWh |
Fuel Types | Natural Gas |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | Electric Utility (1) |
Water Source | Wells |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 525.00 kV |
Energy Storage | No |
Natural Gas Information | |
Pipeline Name | KERN RIVER GAS TRANSMISSION CO |
Natural Gas Storage | No |
Generator GT1 Details Operating May 1995
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 101.5 MW |
Nameplate Power Factor | 0.9 |
Summer Capacity | 72 MW |
Winter Capacity | 76 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | May 1995 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator GT4 Details Operating April 2006
Technology | Natural Gas Fired Combustion Turbine |
---|---|
Prime Mover | Combustion Turbine |
Ownership | Single Owner |
Nameplate Capacity | 85 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 72 MW |
Winter Capacity | 76 MW |
Minimum Load | 30 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | April 2006 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | 1H |
Multiple Fuels | No |
Generator 5 Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 167.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 151.6 MW |
Winter Capacity | 164 MW |
Minimum Load | 90 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 6 Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Combustion Turbine Part |
Unit Code | PB1 |
Ownership | Single Owner |
Can Bypass Heat Recovery Steam Generator | No |
Nameplate Capacity | 167.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 151.6 MW |
Winter Capacity | 164 MW |
Minimum Load | 90 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Generator 7 Details Operating May 2011
Technology | Natural Gas Fired Combined Cycle |
---|---|
Prime Mover | Combined Cycle Steam Part |
Unit Code | PB1 |
Ownership | Single Owner |
Duct Burners | Yes |
Nameplate Capacity | 223.5 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 206.8 MW |
Winter Capacity | 196 MW |
Minimum Load | 45 MW |
---|---|
Uprate/Derate Completed | No |
Status | Operating |
First Operation Date | May 2011 |
Combined Heat & Power | No |
Sector Name | Electric Utility (1) |
Energy Source | Natural Gas |
Time From Cold Shutdown To Full Load | 12H |
Multiple Fuels | No |
Harry Allen Plant Owners
Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Natural Gas.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#283 | Elk Hills Power LLC | Tupman, CA | 2.4 TWh |
#284 | AES Alamitos Energy Center | Long Beach, CA | 2.4 TWh |
#285 | Apex Generating Station | Las Vegas, NV | 2.4 TWh |
#286 | Pleasants Energy LLC | St Mary's, WV | 2.4 TWh |
#287 | Chehalis Generating Facility | Chehalis, WA | 2.4 TWh |
#288 | Otay Mesa Generating Project | San Diego, CA | 2.4 TWh |
#289 | Sabine River Operations | Orange, TX | 2.4 TWh |
#290 | Coyote Springs II | Boardman, OR | 2.4 TWh |
#291 | La Paloma Generating Plant | McKittrick, CA | 2.3 TWh |
#292 | Dogwood Energy Facility | Pleasant Hill, MO | 2.3 TWh |
#294 | Chesterfield | Chester, VA | 2.3 TWh |
#295 | ANP Blackstone Energy Project | Blackstone, MA | 2.3 TWh |
#296 | Quail Run Energy Center | Odessa, TX | 2.3 TWh |
#297 | Bridgeport Energy Project | Bridgeport, CT | 2.3 TWh |
#298 | Rolling Hills Generating | Wilkesville, OH | 2.3 TWh |
#299 | Lewis Creek | Willis, TX | 2.3 TWh |
#300 | Yates | Newnan, GA | 2.2 TWh |
#301 | Ingleside Cogeneration | Houston, TX | 2.3 TWh |
#302 | Midulla Generating Station | Bowling Green, FL | 2.2 TWh |
#303 | Higgins Generating Station | Primm, NV | 2.2 TWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Harry Allen.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Apex Generating Station | Las Vegas, NV | 2.4 TWh | 3.4 mi |
Apex Solar PV Power Project | North Las Vegas, NV | 49.7 GWh | 4.7 mi |
Arrow Canyon Solar Hybrid | Moapa, NV | 618.4 GWh | 3.8 mi |
Chuck Lenzie Generating Station | Apex, NV | 6.9 TWh | 3.4 mi |
Dry Lake Solar Energy Center | Moapa, NV | 127.3 GWh | 0.7 mi |
Eagle Shadow Mountain Solar Farm | Moapa River Indian Re, NV | 900.7 GWh | 18.3 mi |
Gemini Solar | Unincorporated, NV | 778.7 GWh | 5.9 mi |
Harry Allen Solar Energy LLC | Apex, NV | 285.2 GWh | 2.5 mi |
IGS VGT | North Las Vegas, NV | 86.0 MWh | 13.7 mi |
Moapa Southern Paiute | Moapa, NV | 594.9 GWh | 10.1 mi |
Mountain View Solar | North Las Vegas, NV | 53.3 GWh | 4.4 mi |
Nellis Air Force Base Solar Array | Las Vegas, NV | 21.7 GWh | 14.5 mi |
Nellis Solar PV II | North Las Vegas, NV | 37.6 GWh | 17.5 mi |
Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 420.9 GWh | 6.1 mi |
Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 457.1 GWh | 14.2 mi |
Playa Solar 1, LLC | North Las Vegas, NV | 188.1 GWh | 1.6 mi |
Playa Solar 2 | North Las Vegas, NV | 245.3 GWh | 1.6 mi |
Republic Services Renewable Energy, LLC | Las Vegas, NV | 30.0 GWh | 5.2 mi |
Silverhawk | North Las Vegas, NV | 2.8 TWh | 3.6 mi |
Spectrum Solar PV Power Project | Las Vegas, NV | 83.0 GWh | 14 mi |