Nellis Air Force Base Solar Array
North Las Vegas Blvd, Las Vegas, NV 89191Plant Summary Information
Nellis Air Force Base Solar Array is ranked #45 out of 63 solar farms in Nevada in terms of total annual net electricity generation.
Nellis Air Force Base Solar Array generated 4.5 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Nellis Air Force Base Solar Array |
|---|---|
| Utility Name | Solar Star NAFB LLC |
| Location | Clark County, NV |
| Initial Operation Date | October 2007 |
| Last Update | Dec 2025 |
| Annual Generation | 23.4 GWh |
| Annual Consumption | 84.8 k MMBtu |
| Ranked #5,163 out of 13,081 Power Plants Nationwide | |
| Ranked #1,504 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #89 out of 112 Nevada Power Plants | |
| Ranked #45 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Nellis Air Force Base Solar Array
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Nellis Air Force Base Solar Array.
Monthly Net Generation for Nellis Air Force Base Solar Array
Monthly Plant Fuel Consumption for Nellis Air Force Base Solar Array
Nellis Air Force Base Solar Array Details
| Summary Information | |
|---|---|
| Plant Name | Nellis Air Force Base Solar Array (56568) |
| Plant Address | North Las Vegas Blvd, Las Vegas, NV 89191 |
| Utility | Solar Star NAFB LLC (56203) |
| Latitude, Longitude | 36.26028, -115.0544 |
| Generation Dates on File | Oct 2007 to Dec 2025 |
| Initial Operation Date | October 2007 |
| Annual Generation | 23.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 07-173 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | National Security and International Affairs (928) |
| Sector | Commercial Non-CHP (4) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 12.47 kV |
| Energy Storage | No |
Generator NS1 Details Operating October 2007
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.6 MW |
| Summer Capacity | 2.61 MW |
| Winter Capacity | 2.83 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | October 2007 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 4.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator NS2 Details Operating November 2007
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 4.9 MW |
| Summer Capacity | 2.79 MW |
| Winter Capacity | 3.02 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | November 2007 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 5.2 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator NS3 Details Operating December 2007
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 3.7 MW |
| Summer Capacity | 2.11 MW |
| Winter Capacity | 2.27 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | December 2007 |
| Combined Heat & Power | No |
| Sector Name | Commercial Non-CHP (4) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 3.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Nellis Air Force Base Solar Array Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #1494 | Rincon Solar I | Rincon, GA | 23.9 GWh |
| #1495 | Electric City Solar | Sturgis, MI | 23.8 GWh |
| #1496 | Bryan Solar, LLC | Presidio, TX | 23.8 GWh |
| #1497 | TPE Erath Solar, LLC | Stephenville, TX | 23.7 GWh |
| #1498 | Pechin Solar | Dunbar, PA | 23.7 GWh |
| #1499 | Graceland Solar, LLC | Millington, TN | 23.7 GWh |
| #1500 | West Hines Solar I, LLC | Hines, OR | 23.6 GWh |
| #1501 | Sunflower Solar LLC | Kingstree, SC | 23.6 GWh |
| #1502 | SJA Solar LLC-Solterra Monastery CSG | Spencer, MA | 23.6 GWh |
| #1503 | American Legion PV 1 | Roanoke Rapids, NC | 23.5 GWh |
| #1505 | WyEast Solar | Wasco, OR | 23.4 GWh |
| #1506 | Rio Communities Solar Energy Center | Rio Communities, NM | 23.4 GWh |
| #1507 | Starvation | Hines, OR | 23.2 GWh |
| #1508 | SEPV9 Power Plant | Twentynine Palms, CA | 23.1 GWh |
| #1509 | Listonburg Solar | Addison Township, PA | 23.1 GWh |
| #1510 | RE Columbia 3 LLC | Mojave, CA | 23.1 GWh |
| #1511 | Cantua Solar Station | TBD, CA | 23.0 GWh |
| #1512 | Facebook 1 Solar Energy Center | Los Lunas, NM | 23.0 GWh |
| #1513 | Yemassee Solar | Yemassee, SC | 23.0 GWh |
| #1514 | Prescott Solar Plant | Prescott, AZ | 23.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Nellis Air Force Base Solar Array.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apex Generating Station | Las Vegas, NV | 1.8 TWh | 12 mi |
| Apex Solar PV Power Project | North Las Vegas, NV | 48.0 GWh | 10.1 mi |
| Chuck Lenzie Generating Station | Apex, NV | 6.3 TWh | 11.3 mi |
| CityCenter Central Plant Cogen Units | Las Vegas, NV | 62.5 GWh | 12.9 mi |
| Clark (NVE) | Las Vegas, NV | 916.9 GWh | 11.9 mi |
| IGS VGT | North Las Vegas, NV | 2.1 GWh | 0.8 mi |
| Las Vegas Generating Station | North Las Vegas, NV | 671.7 GWh | 4.3 mi |
| Las Vegas WPCF Solar Plant | Las Vegas, NV | 4.8 GWh | 8.8 mi |
| Mountain View Solar | North Las Vegas, NV | 52.1 GWh | 10.3 mi |
| Nellis Solar PV II | North Las Vegas, NV | 8.5 GWh | 3.7 mi |
| Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 298.7 GWh | 9.4 mi |
| Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 255.0 GWh | 10.1 mi |
| Playa Solar 1, LLC | North Las Vegas, NV | 188.8 GWh | 13.1 mi |
| Playa Solar 2 | North Las Vegas, NV | 260.6 GWh | 13.1 mi |
| Republic Services Renewable Energy, LLC | Las Vegas, NV | 25.5 GWh | 12.1 mi |
| Silverhawk | North Las Vegas, NV | 2.7 TWh | 11.5 mi |
| Spectrum Solar PV Power Project | Las Vegas, NV | 81.8 GWh | 10.5 mi |
| Speedway North Bldg 1-sllas701 | Las Vegas, NV | 582.0 MWh | 5.4 mi |
| Sun Peak Generating Station | Las Vegas, NV | 29.8 GWh | 8.6 mi |
| TJX Las Vegas | North Las Vegas, NV | 2.3 GWh | 1.6 mi |