Tungsten Mountain
17017 Alpine Road West, Fallon, NV 89406Plant Summary Information
Tungsten Mountain is ranked #19 out of 62 geothermal power plants nationwide in terms of total annual net electricity generation.
Tungsten Mountain generated 57.8 GWh during the 3-month period between June 2025 to September 2025.
| Plant Name | Tungsten Mountain |
|---|---|
| Utility Name | Tungsten Mountain |
| Location | Churchill County, NV |
| Initial Operation Date | December 2017 |
| Last Update | Sep 2025 |
| Annual Generation | 291.4 GWh |
| Annual Consumption | 1.1 M MMBtu |
| Ranked #1,985 out of 12,539 Power Plants Nationwide | |
| Ranked #19 out of 62 Geothermal Power Plants Nationwide | |
| Ranked #36 out of 110 Nevada Power Plants | |
| Ranked #4 out of 26 Nevada Geothermal Power Plants | |
| Fuel Types | Geothermal : 92.2% Solar : 7.8% |
Map of Tungsten Mountain
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Tungsten Mountain.
Monthly Net Generation for Tungsten Mountain
Tungsten Mountain Details
| Summary Information | |
|---|---|
| Plant Name | Tungsten Mountain (60785) |
| Plant Address | 17017 Alpine Road West, Fallon, NV 89406 |
| Utility | Tungsten Mountain (60472) |
| Latitude, Longitude | 39.667, -117.69366 |
| Generation Dates on File | Dec 2017 to Sep 2025 |
| Initial Operation Date | December 2017 |
| Annual Generation | 291.4 GWh |
| Fuel Types | Geothermal : 92.2% Solar : 7.8% |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF17-1458. |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 92.00 kV |
| Energy Storage | No |
Generator UNIT1 Details Operating December 2017
| Technology | Geothermal |
|---|---|
| Prime Mover | Turbines Used in a Binary Cycle |
| Ownership | Single Owner |
| Nameplate Capacity | 37 MW |
| Nameplate Power Factor | 0.8 |
| Summer Capacity | 24.4 MW |
| Winter Capacity | 37 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | December 2017 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Geothermal |
| Time From Cold Shutdown To Full Load | 12H |
Generator TMSOL Details Operating July 2019
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 7.3 MW |
| Nameplate Power Factor | 1 |
| Summer Capacity | 7.3 MW |
| Winter Capacity | 3.6 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | July 2019 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Time From Cold Shutdown To Full Load | 12H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| DC Net Capacity | 9.7 MW |
| Other Materials | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Generator OEC2 Details Operating April 2022
| Technology | Geothermal |
|---|---|
| Prime Mover | Turbines Used in a Binary Cycle |
| Ownership | Single Owner |
| Nameplate Capacity | 25.5 MW |
| Nameplate Power Factor | 0.85 |
| Summer Capacity | 17 MW |
| Winter Capacity | 25.5 MW |
| Minimum Load | 5 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | April 2022 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Geothermal |
| Time From Cold Shutdown To Full Load | 12H |
Generator TMSL2 Details Operating July 2023
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 5 MW |
| Summer Capacity | 5 MW |
| Winter Capacity | 2.5 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | July 2023 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 12H |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Tilt Angle | 20 |
| DC Net Capacity | 7.9 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Tungsten Mountain Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Geothermal.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #9 | Geothermal 1 | Middletown, CA | 368.8 GWh |
| #10 | Dixie Valley | Fallon, NV | 365.6 GWh |
| #11 | Del Ranch Company | Calipatria, CA | 326.3 GWh |
| #12 | Geothermal 2 | Middletown, CA | 316.7 GWh |
| #13 | Salton Sea Power Gen Co - Unit 3 | Calipatria, CA | 314.9 GWh |
| #14 | Second Imperial Geothermal | Heber, CA | 302.3 GWh |
| #15 | Coso Power Developers | Inyokern, CA | 299.2 GWh |
| #16 | Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh |
| #17 | CD4 | Mammoth Lakes, CA | 276.9 GWh |
| #18 | Blundell | Milford, UT | 272.5 GWh |
| #20 | Puna Geothermal Venture I | Pahoa, HI | 258.9 GWh |
| #21 | Coso Energy Developers | Inyokern, CA | 244.2 GWh |
| #22 | Steamboat Hills LP | Reno, NV | 231.7 GWh |
| #23 | Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh |
| #24 | North Valley | Gerlach, NV | 202.8 GWh |
| #25 | NGP Blue Mountain I LLC | Winnemucca, NV | 182.8 GWh |
| #26 | Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh |
| #27 | Neal Hot Springs Geothermal Project | Vale, OR | 168.9 GWh |
| #28 | Ormesa II | Holtville, CA | 131.7 GWh |
| #29 | Tuscarora Geothermal Power Plant | Tuscarora, NV | 124.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Tungsten Mountain.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Battle Mountain Solar Project | Battle Mountain, NV | 285.3 GWh | 79.9 mi |
| Beowawe | Beowawe, NV | 107.2 GWh | 83.6 mi |
| Brady | Fallon, NV | 88.7 GWh | 70.5 mi |
| Desert Peak Power Plant | Fernley, NV | 72.7 GWh | 67.2 mi |
| Dixie Valley | Fallon, NV | 365.6 GWh | 22.4 mi |
| Don A Campbell 1 Geothermal | Gabbs, NV | 110.0 GWh | 66.5 mi |
| Don A Campbell 2 Geothermal | Luning, NV | 93.5 GWh | 66.6 mi |
| Fort Churchill | Yerington, NV | 453.4 GWh | 85.4 mi |
| Jersey Valley Geothermal Power Plant | Imlay, NV | 60.9 GWh | 37.4 mi |
| Lahontan | Fallon, NV | 10.0 GWh | 74.5 mi |
| Luning Energy | Luning, NV | 101.5 GWh | 81.9 mi |
| McGinness Hills | Austin, NV | 602.8 GWh | 41.9 mi |
| McGinness Hills 3 | Austin, NV | 404.5 GWh | 42.8 mi |
| New Lahontan | Fallon, NV | 10.5 GWh | 74.4 mi |
| Patua Acquisition Project, LLC | Hazen, NV | 133.5 GWh | 73.6 mi |
| Salt Wells | Fallon, NV | 70.0 GWh | 53.5 mi |
| Soda Lake 3 | Fallon, NV | 120.0 GWh | 62 mi |
| Star Peak Geothermal Plant | Imlay, NV | 39.6 GWh | 67.1 mi |
| Stillwater Facility | Fallon, NV | 128.3 GWh | 46.6 mi |
| Stillwater Solar PV II | Fallon, NV | 24.3 GWh | 46.9 mi |