Copper Mountain Solar 5, LLC
587 Eldorado Valley Drive, Boulder City, NV 89005Plant Summary Information
Copper Mountain Solar 5, LLC is ranked #45 out of 6,397 solar farms nationwide in terms of total annual net electricity generation.
Copper Mountain Solar 5, LLC generated 139.0 GWh during the 3-month period between December 2025 to March 2026.
| Plant Name | Copper Mountain Solar 5, LLC |
|---|---|
| Utility Name | Consolidated Edison Development Inc. |
| Location | Clark County, NV |
| Initial Operation Date | March 2021 |
| Last Update | Mar 2026 |
| Annual Generation | 689.4 GWh |
| Annual Consumption | 2.6 M MMBtu |
| Ranked #1,022 out of 12,332 Power Plants Nationwide | |
| Ranked #45 out of 6,397 Solar Power Plants Nationwide | |
| Ranked #13 out of 110 Nevada Power Plants | |
| Ranked #3 out of 61 Nevada Solar Power Plants | |
| Fuel Types | Solar |
Map of Copper Mountain Solar 5, LLC
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Copper Mountain Solar 5, LLC.
Monthly Net Generation for Copper Mountain Solar 5, LLC
Monthly Plant Fuel Consumption for Copper Mountain Solar 5, LLC
Copper Mountain Solar 5, LLC Details
| Summary Information | |
|---|---|
| Plant Name | Copper Mountain Solar 5, LLC (63504) |
| Plant Address | 587 Eldorado Valley Drive, Boulder City, NV 89005 |
| Utility | Consolidated Edison Development Inc. (56769) |
| Latitude, Longitude | 35.77629, -114.97368 |
| Generation Dates on File | Mar 2021 to Mar 2026 |
| Initial Operation Date | March 2021 |
| Annual Generation | 689.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | Yes |
| FERC Exempt Wholesale Generator Docket Number | 20-210 |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | No |
Generator CM5-1 Details Operating March 2021
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 252 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 250 MW |
| Winter Capacity | 250 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | March 2021 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Dual Axis Tracking | No |
| Tilt Angle | 52 |
| DC Net Capacity | 332.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Copper Mountain Solar 5, LLC Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #35 | McFarland B Solar and Storage | Dateland, AZ | 710.1 GWh |
| #36 | Solar Star 2 | Rosamond, CA | 723.9 GWh |
| #37 | Peregrine Solar | Gollad, TX | 723.6 GWh |
| #38 | Athos Solar Project | Desert Center, CA | 712.8 GWh |
| #39 | Texas Solar Nova 1 | Spur, TX | 710.5 GWh |
| #40 | Arroyo Solar Energy Storage Hybrid | Pueblo Pintado, NM | 685.4 GWh |
| #41 | Lumina II Solar Project | Snyder, TX | 689.6 GWh |
| #42 | Eland Solar & Storage Center, Phase 1 Hy | Mojave, CA | 669.7 GWh |
| #43 | Box Canyon (AZ) | Florence, AZ | 691.4 GWh |
| #44 | Neptune Energy Center Hybrid | Boone, CO | 672.1 GWh |
| #46 | Solar Blue | Lemoore, CA | 650.5 GWh |
| #47 | Lumina Solar Project | Snyder, TX | 665.1 GWh |
| #48 | Silver State Solar Power South | Primm Valley, NV | 672.1 GWh |
| #49 | Arlington Energy Center II | Blythe, CA | 643.9 GWh |
| #50 | Mount Signal Solar Farm V | Calexico, CA | 670.4 GWh |
| #51 | McCoy Solar Energy Project Hybrid | Blythe, CA | 646.7 GWh |
| #52 | Desert Sunlight 300, LLC | Desert Center, CA | 666.9 GWh |
| #53 | Aquamarine | Lemoore, CA | 663.5 GWh |
| #54 | AEUG Union Solar, LLC | West Mansfield, OH | 657.5 GWh |
| #55 | Prospero Solar II | Andrews, TX | 654.7 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Copper Mountain Solar 5, LLC.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Boulder Solar II, LLC | Boulder City, NV | 111.2 GWh | 5.4 mi |
| CM10 | Boulder City, NV | 18.0 GWh | 1.4 mi |
| CM48 | Boulder City, NV | 94.3 GWh | 1.2 mi |
| Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 0.9 mi |
| Copper Mountain Solar 3 | Boulder City, NV | 599.2 GWh | 7.9 mi |
| Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 0.4 mi |
| Desert Star Energy Center | Boulder City, NV | 365.7 GWh | 1.4 mi |
| Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 17.6 mi |
| IGS LAS1 | Henderson, NV | 1.1 GWh | 16.4 mi |
| Nevada Solar One | Boulder City, NV | 92.0 GWh | 1.7 mi |
| River Mountains Solar | Henderson, NV | 33.6 GWh | 17.8 mi |
| Saguaro Power | Henderson, NV | 264.5 GWh | 18.5 mi |
| Searchlight Solar | Searchlight, NV | 45.7 GWh | 20.6 mi |
| Silver State Solar Power North | Primm, NV | 113.3 GWh | 21.1 mi |
| Techren Solar I LLC | Boulder, NV | 220.4 GWh | 5.2 mi |
| Techren Solar II LLC | Boulder, NV | 500.3 GWh | 6.4 mi |
| Techren Solar III LLC | Boulder, NV | 53.3 GWh | 4.7 mi |
| Techren Solar IV LLC | Boulder, NV | 53.5 GWh | 8.3 mi |
| Techren Solar V | Boulder, NV | 106.0 GWh | 8.9 mi |
| Townsite Solar Project Hybrid | Boulder City, NV | 461.2 GWh | 12.2 mi |