Dry Lake Solar Energy Center
TBD, Moapa, NV 89025Plant Summary Information
Dry Lake Solar Energy Center is ranked #29 out of 112 power plants in Nevada in terms of total annual net electricity generation.
Dry Lake Solar Energy Center generated 129.1 GWh during the 3-month period between May 2026 to August 2026.
| Plant Name | Dry Lake Solar Energy Center |
|---|---|
| Utility Name | Nevada Power Co |
| Location | Clark County, NV |
| Initial Operation Date | May 2024 |
| Last Update | Aug 2026 |
| Annual Generation | 396.1 GWh |
| Annual Consumption | 1.5 M MMBtu |
| Ranked #1,684 out of 13,301 Power Plants Nationwide | |
| Ranked #202 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #29 out of 112 Nevada Power Plants | |
| Ranked #14 out of 63 Nevada Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Nevada Power Company DBA NV Energy (2019 to 2019) Nevada Power Co (2020 to 2025) |
Map of Dry Lake Solar Energy Center
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Dry Lake Solar Energy Center.
Monthly Net Generation for Dry Lake Solar Energy Center
Monthly Plant Fuel Consumption for Dry Lake Solar Energy Center
Dry Lake Solar Energy Center Details
| Summary Information | |
|---|---|
| Plant Name | Dry Lake Solar Energy Center (63933) |
| Plant Address | TBD, Moapa, NV 89025 |
| Utility | Nevada Power Co (13407) |
| Latitude, Longitude | 36.42726, -114.89072 |
| Generation Dates on File | May 2024 to Aug 2026 |
| Initial Operation Date | May 2024 |
| Annual Generation | 396.1 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Regulated |
| NERC Region | WECC |
| Balancing Authority | Nevada Power Company (NEVP) |
| NAICS Code | Utilities (22) |
| Sector | Electric Utility (1) |
| Water Source | |
| Ash Impoundment | |
| Transmission / Distribution Owner | Nevada Power Co (13407) NV |
| Grid Voltage | 230.00 kV |
| Energy Storage | Yes |
Generator DLES1 Details Operating May 2024
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 100 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 100 MW |
| Winter Capacity | 100 MW |
| Minimum Load | 1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Electricity used for energy storage |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 150 |
|---|---|
| Maximum Charge Rate | 100 MW |
| Maximum Discharge Rate | 100 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 150 |
| Storage Enclosure Type | CS |
| Excess Wind And Solar Generation | P |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 63933 |
| Direct Support Gen Id | DLPV1 |
| Support T D Asset | Yes |
Generator DLPV1 Details Operating May 2024
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 150 MW |
| Nameplate Power Factor | 0.95 |
| Summer Capacity | 150 MW |
| Winter Capacity | 130 MW |
| Minimum Load | 1 MW |
|---|---|
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | May 2024 |
| Combined Heat & Power | No |
| Sector Name | Electric Utility (1) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Bifacial | Yes |
| Azimuth Angle | 2 |
| DC Net Capacity | 180 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Dry Lake Solar Energy Center Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #192 | Oak Ridge Solar | Oak Ridge, LA | 428.6 GWh |
| #193 | Muscle Shoals | Cherokee, AL | 428.3 GWh |
| #194 | Stoneridge Solar, LLC | Thorndale, TX | 421.9 GWh |
| #195 | Brazoria West | Damon, TX | 419.1 GWh |
| #196 | AP Sunray LLC | Knippa, TX | 418.9 GWh |
| #197 | Twiggs Solar | Dry Branch, GA | 417.9 GWh |
| #198 | Pisgah Ridge Solar, LLC | Richland, TX | 417.8 GWh |
| #199 | Golden Triangle | Lowndes, MS | 409.8 GWh |
| #200 | Chaparral Springs | Rosamond, CA | 398.1 GWh |
| #201 | Misae Solar | Childress, TX | 412.8 GWh |
| #203 | Northern Orchard Solar PV, LLC | Taft, CA | 404.3 GWh |
| #204 | Big Cypress Solar, LLC | Crawfordsville, AR | 409.2 GWh |
| #205 | Azalea Springs Solar Park | Lufkin, TX | 408.3 GWh |
| #206 | Hickory Park Solar Hybrid | Camilla, GA | 400.6 GWh |
| #207 | Millers Branch Solar | Haskell, TX | 404.8 GWh |
| #208 | New Madrid Solar, LLC | Marston, MO | 404.1 GWh |
| #209 | Posey Solar | Mount Vernon, IN | 403.5 GWh |
| #210 | Black Hollow Sun | Auit, CO | 403.1 GWh |
| #211 | Oriana Solar LLC | Victoria, TX | 402.5 GWh |
| #212 | Wright Solar Park | Los Banos, CA | 402.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Dry Lake Solar Energy Center.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Apex Generating Station | Las Vegas, NV | 1.8 TWh | 4 mi |
| Apex Solar PV Power Project | North Las Vegas, NV | 48.0 GWh | 5.1 mi |
| Arrow Canyon Solar Hybrid | Moapa, NV | 600.3 GWh | 3.4 mi |
| Chuck Lenzie Generating Station | Apex, NV | 6.6 TWh | 3.5 mi |
| Gemini Solar Hybrid | Unincorporated, NV | 2.1 TWh | 5.5 mi |
| Harry Allen | Las Vegas, NV | 3.2 TWh | 0.7 mi |
| Harry Allen Solar Energy LLC | Apex, NV | 297.7 GWh | 3.2 mi |
| IGS VGT | North Las Vegas, NV | 2.1 GWh | 13.9 mi |
| Moapa Southern Paiute | Moapa, NV | 606.8 GWh | 9.8 mi |
| Mountain View Solar | North Las Vegas, NV | 51.9 GWh | 4.8 mi |
| Nellis Air Force Base Solar Array | Las Vegas, NV | 23.4 GWh | 14.7 mi |
| Nellis Solar PV II | North Las Vegas, NV | 13.9 GWh | 17.6 mi |
| Nevada Cogen Assoc#1 GarnetVly | Las Vegas, NV | 270.4 GWh | 6 mi |
| Nevada Cogen Associates 2 Black Mountain | Las Vegas, NV | 254.1 GWh | 14 mi |
| Playa Solar 1, LLC | North Las Vegas, NV | 186.5 GWh | 1.6 mi |
| Playa Solar 2 | North Las Vegas, NV | 253.2 GWh | 1.6 mi |
| Republic Services Renewable Energy, LLC | Las Vegas, NV | 25.5 GWh | 4.8 mi |
| Silverhawk | North Las Vegas, NV | 3.0 TWh | 4.1 mi |
| Spectrum Solar PV Power Project | Las Vegas, NV | 81.8 GWh | 13.7 mi |
| TJX Las Vegas | North Las Vegas, NV | 2.3 GWh | 16.2 mi |