Techren Solar V
15103 Highway US 95 South, Boulder, NV 89005Plant Summary Information
Techren Solar V is ranked #26 out of 60 solar farms in Nevada in terms of total annual net electricity generation.
Techren Solar V generated 32.3 GWh during the 3-month period between January 2025 to April 2025.
Plant Name | Techren Solar V |
---|---|
Utility Name | Techren Solar V LLC |
Location | Clark County, NV |
Initial Operation Date | December 2020 |
Last Update | Apr 2025 |
Annual Generation | 119.2 GWh |
Annual Consumption | 450.4 k MMBtu |
Ranked #3,078 out of 12,299 Power Plants Nationwide | |
Ranked #619 out of 6,182 Solar Power Plants Nationwide | |
Ranked #54 out of 107 Nevada Power Plants | |
Ranked #26 out of 60 Nevada Solar Power Plants | |
Fuel Types | Solar |
Map of Techren Solar V
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Techren Solar V.
Monthly Net Generation for Techren Solar V
Techren Solar V Details
Summary Information | |
---|---|
Plant Name | Techren Solar V (62440) |
Plant Address | 15103 Highway US 95 South, Boulder, NV 89005 |
Utility | Techren Solar V LLC (61954) |
Latitude, Longitude | 35.89969, -114.92625 |
Generation Dates on File | Dec 2020 to Apr 2025 |
Initial Operation Date | December 2020 |
Annual Generation | 119.2 GWh |
Fuel Types | Solar |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | No |
FERC Exempt Wholesale Generator Status | Yes |
FERC Exempt Wholesale Generator Docket Number | EG19-34-000 |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | |
Ash Impoundment | |
Transmission / Distribution Owner | Nevada Power Co (13407) NV |
Grid Voltage | 230.00 kV |
Energy Storage | No |
Generator TECH5 Details Operating December 2020
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Wholly Owned by Other Entity |
Nameplate Capacity | 50 MW |
Summer Capacity | 50 MW |
Winter Capacity | 50 MW |
Uprate/Derate Completed | No |
---|---|
Status | Operating |
First Operation Date | December 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Azimuth Angle | 180 |
DC Net Capacity | 65 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Techren Solar V Plant Owners
Owner Name | Address | Ownership |
---|---|---|
KKR/GA | 30 Hudson Yards, New York, NY 10001 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#609 | Blue Springs | Marianna, FL | 121.7 GWh |
#610 | Palmetto Plains | Bowman, SC | 121.2 GWh |
#611 | Bonnybrooke PV | Florence, AZ | 121.2 GWh |
#612 | Manatee Solar Energy Center | Parrish, FL | 105.9 GWh |
#613 | Little Bear 5 | Mendota, CA | 120.9 GWh |
#614 | FPL Cavendish Solar Energy Center | Okeechobee, FL | 120.9 GWh |
#615 | Liberty County Solar Project | Dayton, TX | 120.5 GWh |
#616 | SolaireHolman Solar Project | Alpine, TX | 120.4 GWh |
#617 | Meridian III | Meridian, MS | 120.2 GWh |
#618 | Innovative Solar 42 | Fayetteville, NC | 120.2 GWh |
#620 | Alpine Solar | Lancaster, CA | 118.8 GWh |
#621 | Debary Solar Power Plant | DeBary, FL | 118.4 GWh |
#622 | Hooper Solar | Mosca, CO | 118.3 GWh |
#623 | Skysol | Merrill, OR | 118.0 GWh |
#624 | Payne Creek Solar | Bowling Green, FL | 117.6 GWh |
#625 | Hawtree Solar | Warrenton, NC | 117.4 GWh |
#626 | Ocotillo Wells | Borrego Springs, CA | 117.2 GWh |
#627 | Sandstone Solar | Florence, AZ | 117.2 GWh |
#628 | Estrella Solar & Storage | Lancaster, CA | 112.9 GWh |
#629 | Alafia Solar | Mulberry, FL | 117.1 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Techren Solar V.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Boulder Solar II, LLC | Boulder City, NV | 117.1 GWh | 3.6 mi |
CM10 | Boulder City, NV | 18.0 GWh | 8.6 mi |
CM48 | Boulder City, NV | 94.3 GWh | 9 mi |
Copper Mountain Solar 2 | Boulder City, NV | 356.1 GWh | 8.1 mi |
Copper Mountain Solar 3 | Boulder City, NV | 619.3 GWh | 1.9 mi |
Copper Mountain Solar 4, LLC | Boulder City, NV | 211.3 GWh | 8.6 mi |
Copper Mountain Solar 5, LLC | Boulder City, NV | 693.5 GWh | 8.9 mi |
Desert Star Energy Center | Boulder City, NV | 747.6 GWh | 8.5 mi |
Dignity - Siena Campus | Henderson, NV | 2.7 GWh | 12.8 mi |
Hoover Dam (AZ) | Boulder City, AZ | 1.2 TWh | 13.2 mi |
Hoover Dam (NV) | Boulder City, NV | 1.9 TWh | 13.2 mi |
IGS LAS1 | Henderson, NV | 1.1 GWh | 13.2 mi |
Nevada Solar One | Boulder City, NV | 91.3 GWh | 7.6 mi |
River Mountains Solar | Henderson, NV | 33.6 GWh | 9.1 mi |
Saguaro Power | Henderson, NV | 213.3 GWh | 10.9 mi |
Techren Solar I LLC | Boulder, NV | 204.7 GWh | 4.3 mi |
Techren Solar II LLC | Boulder, NV | 483.4 GWh | 2.8 mi |
Techren Solar III LLC | Boulder, NV | 58.8 GWh | 4.6 mi |
Techren Solar IV LLC | Boulder, NV | 57.9 GWh | 0.8 mi |
Townsite Solar Project Hybrid | Boulder City, NV | 461.6 GWh | 3.5 mi |