Steamboat Hills LP
20590 Wedge Parkway, Reno, NV 89521Plant Summary Information
Steamboat Hills LP is ranked #22 out of 62 geothermal power plants nationwide in terms of total annual net electricity generation.
Steamboat Hills LP is comprised of 4 generators and generated 62.0 GWh during the 3-month period between September 2024 to December 2024.
Plant Name | Steamboat Hills LP |
---|---|
Utility Name | Ormat Nevada Inc |
Location | Washoe County, NV |
Initial Operation Date | February 1988 |
Last Update | Dec 2024 |
Annual Generation | 231.7 GWh |
Annual Consumption | 871.8 k MMBtu |
Ranked #2,212 out of 12,288 Power Plants Nationwide | |
Ranked #22 out of 62 Geothermal Power Plants Nationwide | |
Ranked #41 out of 107 Nevada Power Plants | |
Ranked #5 out of 26 Nevada Geothermal Power Plants | |
Fuel Types | Geothermal |
Map of Steamboat Hills LP
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Steamboat Hills LP.
Monthly Net Generation for Steamboat Hills LP
Steamboat Hills LP Details
Summary Information | |
---|---|
Plant Name | Steamboat Hills LP (50654) |
Plant Address | 20590 Wedge Parkway, Reno, NV 89521 |
Utility | Ormat Nevada Inc (34691) |
Latitude, Longitude | 39.37, -119.76694 |
Generation Dates on File | Jan 2001 to Dec 2024 |
Initial Operation Date | February 1988 |
Annual Generation | 231.7 GWh |
Fuel Types | Geothermal |
Federal Energy Regulatory Commission (FERC) Information | |
FERC Cogeneration Status | No |
FERC Small Power Producer Status | Yes |
FERC Small Power Producer Docket Number | 87-383-000 |
FERC Exempt Wholesale Generator Status | No |
Regulatory Information | |
---|---|
Regulatory Status | Non-Regulated |
NERC Region | WECC |
Balancing Authority | Nevada Power Company (NEVP) |
NAICS Code | Utilities (22) |
Sector | IPP Non-CHP (2) |
Water Source | Wells |
Ash Impoundment | |
Transmission / Distribution Owner | Sierra Pacific Power Co (17166) NV |
Grid Voltage | 120.00 kV |
Energy Storage | No |
Generator OEC51 Details Operating June 2020
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 25.7 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 17.1 MW |
Winter Capacity | 25.7 MW |
Minimum Load | 17.1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator OEC52 Details Operating June 2020
Technology | Geothermal |
---|---|
Prime Mover | Turbines Used in a Binary Cycle |
Ownership | Single Owner |
Nameplate Capacity | 5.9 MW |
Nameplate Power Factor | 0.85 |
Summer Capacity | 4 MW |
Winter Capacity | 5.9 MW |
Minimum Load | 4 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | June 2020 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Geothermal |
Solid Fuel Gasification | No |
Time From Cold Shutdown To Full Load | OVER |
Multiple Fuels | No |
Generator SBSOL Details Operating July 2022
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 2 MW |
Summer Capacity | 2 MW |
Winter Capacity | 1 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | July 2022 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 62.3 |
DC Net Capacity | 2.6 MW |
Crystalline Silicon | Yes |
Other Materials | No |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Generator SBSL2 Details Operating March 2024
Technology | Solar Photovoltaic |
---|---|
Prime Mover | Photovoltaic |
Ownership | Single Owner |
Nameplate Capacity | 3.6 MW |
Summer Capacity | 3.6 MW |
Winter Capacity | 1.8 MW |
Uprate/Derate Completed | No |
Status | Operating |
---|---|
First Operation Date | March 2024 |
Combined Heat & Power | No |
Sector Name | IPP Non-CHP (2) |
Energy Source | Solar |
Solid Fuel Gasification | No |
Solar Details | |
Single Axis Tracking | Yes |
---|---|
Tilt Angle | 62.3 |
DC Net Capacity | 4.5 MW |
Crystalline Silicon | Yes |
Net Metering Agreement | No |
Virtual Net Metering Agreement | No |
Steamboat Hills LP Plant Owners
Owner Name | Address | Generator | Ownership |
---|---|---|---|
We couldn't locate any owners for this plant |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Geothermal.
Rank | Plant Name | Plant Location | Annual Generation |
---|---|---|---|
#12 | Coso Power Developers | Inyokern, CA | 307.8 GWh |
#13 | Tungsten Mountain | Fallon, NV | 332.1 GWh |
#14 | Dixie Valley | Fallon, NV | 303.5 GWh |
#15 | Geothermal 2 | Middletown, CA | 303.1 GWh |
#16 | Second Imperial Geothermal | Heber, CA | 302.3 GWh |
#17 | Salton Sea Power LLC - Unit 5 | Calipatria, CA | 290.3 GWh |
#18 | CD4 | Mammoth Lakes, CA | 276.9 GWh |
#19 | Blundell | Milford, UT | 272.5 GWh |
#20 | Puna Geothermal Venture I | Pahoa, HI | 258.9 GWh |
#21 | Coso Energy Developers | Inyokern, CA | 244.2 GWh |
#23 | Vulcan-BN Geothermal Power Company | Calipatria, CA | 227.2 GWh |
#24 | North Valley | Gerlach, NV | 203.5 GWh |
#25 | NGP Blue Mountain I LLC | Winnemucca, NV | 182.8 GWh |
#26 | Salton Sea Power Gen Co - Unit 4 | Calipatria, CA | 179.8 GWh |
#27 | Neal Hot Springs Geothermal Project | Vale, OR | 168.9 GWh |
#28 | Ormesa II | Holtville, CA | 131.7 GWh |
#29 | Tuscarora Geothermal Power Plant | Tuscarora, NV | 124.4 GWh |
#30 | Soda Lake 3 | Fallon, NV | 123.1 GWh |
#31 | Cove Fort | Cove Fort, UT | 120.8 GWh |
#32 | Don A Campbell 1 Geothermal | Gabbs, NV | 110.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Steamboat Hills LP.
Plant Name | Plant Location | Annual Generation | Distance |
---|---|---|---|
Fleish | Fleish, NV | 20.7 GWh | 11 mi |
Fort Churchill | Yerington, NV | 498.6 GWh | 37.9 mi |
French Meadows | Foresthill, CA | 50.8 GWh | 39.7 mi |
Ft. Churchill PV | Yerington, NV | 22.2 GWh | 37.5 mi |
Galena 2 Geothermal Power Plant | Reno, NV | 36.7 GWh | 0.3 mi |
Galena 3 Geothermal Power Plant | Reno, NV | 82.6 GWh | 1.6 mi |
Patua Acquisition Project, LLC | Hazen, NV | 133.5 GWh | 39.9 mi |
Richard Burdette Geothermal | Reno, NV | 97.6 GWh | 1.6 mi |
Stampede | Truckee, CA | 13.5 GWh | 19.3 mi |
Steamboat II | Reno, NV | 62.7 GWh | 2.1 mi |
Steamboat III | Reno, NV | 69.4 GWh | 2 mi |
Tesla Reno GigaFactory | Sparks, NV | 8.7 GWh | 21 mi |
Tracy | Sparks, NV | 4.0 TWh | 18.5 mi |
Turquoise Liberty Solar | Sparks, NV | 9.2 GWh | 20.1 mi |
Turquoise Nevada, LLC | Sparks, NV | 109.1 GWh | 19.1 mi |
Verdi | Verdi, NV | 18.9 GWh | 10.5 mi |
Washoe | Verdi, NV | 14.4 GWh | 12 mi |
Waste Management Lockwood LFGTE | Sparks, NV | 25.8 GWh | 11.6 mi |
Western 102 Power Plant | McCarran, NV | 442.6 GWh | 19 mi |
Whitegrass No. 1 | Yerington, NV | 17.7 GWh | 34.5 mi |