Diamond Valley Solar Project
33725 E. Grand Avenue, Winchester, CA 92596Plant Summary Information
Diamond Valley Solar Project is ranked #664 out of 885 solar farms in California in terms of total annual net electricity generation.
Diamond Valley Solar Project generated 525.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Diamond Valley Solar Project |
|---|---|
| Utility Name | Ecos Energy LLC |
| Location | Riverside County, CA |
| Initial Operation Date | January 2015 |
| Last Update | Dec 2025 |
| Annual Generation | 2.4 GWh |
| Annual Consumption | 8.8 k MMBtu |
| Ranked #10,386 out of 13,081 Power Plants Nationwide | |
| Ranked #5,307 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #1,336 out of 1,606 California Power Plants | |
| Ranked #664 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
| Previous Operator |
Diamond Valley Solar LLC (2013 to 2022) Ecos Energy LLC (2023 to 2025) |
Map of Diamond Valley Solar Project
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Diamond Valley Solar Project.
Monthly Net Generation for Diamond Valley Solar Project
Monthly Plant Fuel Consumption for Diamond Valley Solar Project
Diamond Valley Solar Project Details
| Summary Information | |
|---|---|
| Plant Name | Diamond Valley Solar Project (59405) |
| Plant Address | 33725 E. Grand Avenue, Winchester, CA 92596 |
| Utility | Ecos Energy LLC (58135) |
| Latitude, Longitude | 33.71306, -117.0725 |
| Generation Dates on File | Jan 2015 to Dec 2025 |
| Initial Operation Date | January 2015 |
| Annual Generation | 2.4 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | QF14-18-000 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Southern California Edison Co (17609) CA |
| Grid Voltage | 12.00 kV |
| Energy Storage | No |
Generator PV11 Details Operating January 2015
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 1.3 MW |
| Summer Capacity | 1.3 MW |
| Winter Capacity | 1.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
|---|---|
| First Operation Date | January 2015 |
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 180 |
| Tilt Angle | 25 |
| DC Net Capacity | 1.5 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | No |
| Virtual Net Metering Agreement | No |
Diamond Valley Solar Project Plant Owners
| Owner Name | Address | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #5297 | Montgomery County Solar | Gaithersburg, MD | 2.4 GWh |
| #5298 | Frey Rd #1 Community Solar Farm | Macedon, NY | 2.4 GWh |
| #5299 | Elizabeth Seaport Bldg A Solar | Elizabeth, NJ | 2.4 GWh |
| #5300 | Oltmans SCE at Jurupa | Ontario, CA | 2.4 GWh |
| #5301 | Music City Community Solar | Madison, TN | 2.4 GWh |
| #5302 | Town of Ware - Canadian Tree(CSG) | Ware, MA | 2.4 GWh |
| #5303 | Kirby Road Solar, LLC | Clinton, MD | 2.4 GWh |
| #5304 | IMPA Knightstown Solar Park | Knightstown, IN | 2.4 GWh |
| #5305 | Kings Park Solar I | Kings Park, NY | 2.4 GWh |
| #5306 | Page Solar | Willow Spring, NC | 2.4 GWh |
| #5308 | Frey Rd #2 Community Solar Farm | Macedon, NY | 2.4 GWh |
| #5309 | CCUA Solar | Bridgeton, NJ | 2.4 GWh |
| #5310 | Cedar Falls Solar Farm | Cedar Falls, IA | 2.4 GWh |
| #5311 | Atlantic Coast Freezers Solar Facility | Vineland, NJ | 2.4 GWh |
| #5312 | Aegean Drive Solar | Methuen, MA | 2.4 GWh |
| #5313 | Whittier | Ogden, NY | 2.4 GWh |
| #5314 | Joe Jenny | Oxford, MA | 2.4 GWh |
| #5315 | Dennison | Hauppauge, NY | 2.4 GWh |
| #5316 | LRWRA | Little Rock, AR | 2.4 GWh |
| #5317 | SunGen Sharon 1 LLC | Sharon, VT | 2.4 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Diamond Valley Solar Project.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Amazon PSP1 | Beaumont, CA | 7.5 GWh | 15.4 mi |
| AP North Lake I, LP | Hemet, CA | 45.7 GWh | 4 mi |
| Broadway 2 - UC Riverside | Riverside, CA | 3.9 GWh | 23.2 mi |
| Diamond Valley Lake | Winchester, CA | 1.3 GWh | 2.2 mi |
| EMWD - Moreno Valley RWRF | Moreno Valley, CA | 5.1 GWh | 13.5 mi |
| EMWD - Perris Valley RWRF | Perris, CA | 8.2 GWh | 7.4 mi |
| EMWD - San Jacinto RES BCT | San Jacinto, CA | 10.6 GWh | 6.8 mi |
| EMWD - San Jacinto RWRF NEM | San Jacinto, CA | 3.1 GWh | 6.7 mi |
| EMWD - Sun City RWRF | Menifee, CA | 3.6 GWh | 8.5 mi |
| Foundation NWNA | Cabazon, CA | 22.5 GWh | 23.2 mi |
| Foundation RRM | Cabazon, CA | 9.7 GWh | 20.4 mi |
| Lake Elsinore Canopies - Lakeside HS | Lake Elsinore, CA | 2.0 GWh | 18.1 mi |
| Park Meridian #1 | Riverside, CA | 2.6 GWh | 17.5 mi |
| RCWD PV Project | Murrieta, CA | 8.3 GWh | 14.6 mi |
| Soboba Community Solar Project | San Jacinto, CA | 3.6 GWh | 10.3 mi |
| Springs Generating Station | Riverside, CA | 878.0 MWh | 19.7 mi |
| SunEdison Walgreens Moreno Valley | Moreno Valley, CA | 599.0 MWh | 14 mi |
| Tahquitz High School | Hemet, CA | 1.5 GWh | 4.9 mi |
| UC Riverside Lots 30 & 32 | Riverside, CA | 6.8 GWh | 23.2 mi |
| West Valley High School Solar | Hemet, CA | 1.3 GWh | 3.6 mi |