Directory of Power Plants in the United States
| Plant Name | Utility | Location | Balancing Authority | Annual Generation | Plant Date | Last Update | Fuel Types |
|---|---|---|---|---|---|---|---|
| Berry Placerita Cogen | Shadow Wolf Energy | Santa Clarita, CA | California Independent System Operator (CISO) | 4.7 GWh | Feb 1990 | Jun 2026 | Natural Gas |
| CP Kelco San Diego Plant | CP Kelco US Inc. | San Diego, CA | California Independent System Operator (CISO) | 74.8 GWh | Sep 1983 | Jun 2026 | Natural Gas |
| Dominguez Plant | Eco Services Corp. | Long Beach, CA | California Independent System Operator (CISO) | 33.7 GWh | Jul 1976 | Dec 2025 | Waste Heat |
| Martinez Sulfuric Acid Regeneration Plt | Eco Services Corp. | Martinez, CA | California Independent System Operator (CISO) | 13.4 GWh | Dec 1977 | Dec 2025 | Waste Heat |
| Tehachapi Wind Resource II | CalWind Resources Inc | Tehachapi, CA | California Independent System Operator (CISO) | 47.6 GWh | Dec 1996 | Dec 2025 | Wind |
| Martinez Refining | Martinez Refining Co | Martinez, CA | California Independent System Operator (CISO) | 665.5 GWh | Oct 1995 | Jun 2026 | Natural Gas : 96.5% Other Gas : 3.5% |
| Ridgetop | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 117.6 GWh | Mar 1994 | Dec 2025 | Wind |
| Dixie Valley | Ormat Nevada Inc | Fallon, NV | California Independent System Operator (CISO) | 467.8 GWh | May 1988 | Jun 2026 | Geothermal |
| Monterey One Water | Monterey One Water | Marina, CA | California Independent System Operator (CISO) | 8.4 GWh | Jul 1988 | Dec 2025 | Other Biomass Gas : 78.5% Natural Gas : 21.5% |
| Solano County Cogen Plant | Solano County - (CA) | Fairfield, CA | California Independent System Operator (CISO) | 7.9 GWh | May 1989 | Dec 2025 | Natural Gas |
| Montgomery Creek Hydro | Central Rivers Power US, LLC | Montgomery Creek, CA | California Independent System Operator (CISO) | 9.2 GWh | Dec 1986 | Dec 2025 | Water |
| Naval Hospital Medical Center | Department of the Navy | San Diego, CA | California Independent System Operator (CISO) | 15.7 GWh | Nov 2003 | Jun 2026 | Natural Gas |
| Desert Star Energy Center | Desert Star Energy Center SDG&E | Boulder City, NV | California Independent System Operator (CISO) | 318.6 GWh | Apr 2000 | Jun 2026 | Natural Gas |
| Crockett Cogen Project | Crockett Cogeneration | Crockett, CA | California Independent System Operator (CISO) | 1.3 TWh | Nov 1995 | Feb 2026 | Natural Gas |
| Welport Lease Project | Sentinel Peak Resources California, LLC | McKittrick, CA | California Independent System Operator (CISO) | 33.7 GWh | Feb 1990 | Dec 2025 | Natural Gas |
| MM Yolo Power | Yolo County Community Services Department | Woodland, CA | California Independent System Operator (CISO) | 16.2 GWh | Sep 1990 | Dec 2025 | Landfill Gas |
| Collierville Powerhouse | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 397.3 GWh | Oct 1989 | Jun 2026 | Water |
| Spicer Meadow Project | Northern California Power Agny | Murphys, CA | California Independent System Operator (CISO) | 14.4 GWh | Oct 1989 | Dec 2025 | Water |
| Sierra Pacific Sonora | Sierra Pacific Industries | Standard, CA | California Independent System Operator (CISO) | 42.7 GWh | Jan 2001 | Dec 2025 | Wood/Wood Waste Solids |
| Oroville Cogeneration, LLC | Apex Power Generation Corp. | Oroville, CA | California Independent System Operator (CISO) | 115.6 MWh | Dec 1989 | Dec 2025 | Natural Gas |
| San Gorgonio Windplant WPP1993 | FPL Energy Operating Services, Inc. | North Palm Springs, CA | California Independent System Operator (CISO) | 191.9 GWh | Nov 2011 | Dec 2025 | Wind |
| EDF Renewable Windfarm V Inc | EDF Renewable Asset Holdings, Inc. | Birds Landing, CA | California Independent System Operator (CISO) | 22.9 GWh | Dec 1989 | Dec 2025 | Wind |
| Dome Project | Sentinel Peak Resources California, LLC | Fellows, CA | California Independent System Operator (CISO) | 48.4 GWh | Jul 1988 | Dec 2025 | Natural Gas |
| TPC Windfarms LLC | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 42.1 GWh | Nov 1986 | Dec 2025 | Wind |
| Western Power & Steam Inc | Western Power and Steam II LLC | Bakersfield, CA | California Independent System Operator (CISO) | 17.7 GWh | Feb 1990 | Jun 2026 | Natural Gas |
| Stockton Biomass | DTE Stockton LLC | Stockton, CA | California Independent System Operator (CISO) | 355.5 GWh | Nov 1987 | Dec 2025 | Wood/Wood Waste Solids : 99.6% |
| Terminus Hydroelectric Project | Eagle Creek Renewable Energy, LLC | Lemon Cove, CA | California Independent System Operator (CISO) | 33.1 GWh | Feb 1990 | Dec 2025 | Water |
| Three Forks Water Power Project | Grizzly Mountain Ranch | Zenia, CA | California Independent System Operator (CISO) | 2.6 GWh | Nov 1984 | Dec 2024 | Water |
| Coram Energy LLC (4.5MW) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 9.0 GWh | Nov 1985 | Dec 2025 | Wind |
| Coram Energy LLC | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 8.8 GWh | Dec 2004 | Dec 2025 | Wind |
| Biola University Hybrid | Biola University | La Mirada, CA | California Independent System Operator (CISO) | 13.5 GWh | Mar 1990 | Jun 2026 | Natural Gas |
| Cymric 36W Cogen | Chevron USA Inc | McKittrick, CA | California Independent System Operator (CISO) | 53.4 GWh | Sep 1982 | Dec 2025 | Natural Gas |
| San Gabriel Hydro Project | Los Angeles County-San Gabriel | Azusa, CA | California Independent System Operator (CISO) | 2.3 GWh | Nov 1987 | Apr 2025 | Water |
| MM West Covina | MM West Covina Energy LLC | West Covina, CA | California Independent System Operator (CISO) | 40.4 GWh | May 1993 | Dec 2025 | Landfill Gas : 99.7% |
| Yuba City Cogen Partners | Wellhead Services, Inc | Yuba City, CA | California Independent System Operator (CISO) | 14.7 GWh | Nov 1990 | Dec 2025 | Natural Gas |
| Difwind Farms Ltd VI | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 12.6 GWh | Dec 1986 | Dec 2025 | Wind |
| Midway Sunset Cogen | Midway-Sunset Cogeneration Co | Fellows, CA | California Independent System Operator (CISO) | 6.0 GWh | Apr 1989 | Apr 2026 | Natural Gas |
| 85 B | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 93.2 GWh | Dec 1984 | Dec 2025 | Wind |
| 85 A | Wind Wall 1 LLC | Tehachapi, CA | California Independent System Operator (CISO) | 70.6 GWh | Dec 1984 | Dec 2025 | Wind |
| Aidlin Geothermal Power Plant | Geysers Power Co LLC | Middletown, CA | California Independent System Operator (CISO) | 82.4 GWh | Apr 1989 | Dec 2025 | Geothermal |
| Goal Line LP | Goal Line LP | Escondido, CA | California Independent System Operator (CISO) | 11.7 GWh | Jul 1994 | May 2026 | Natural Gas |
| Coram Energy LLC (ECT) | Nextera Energy Resources | Tehachapi, CA | California Independent System Operator (CISO) | 21.6 GWh | Apr 2005 | Dec 2025 | Wind |
| Mojave 3/4/5 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 125.0 GWh | Nov 1990 | Dec 2025 | Wind |
| Live Oak Limited | WCAC Operating Company | Bakersfield, CA | California Independent System Operator (CISO) | 20.1 GWh | Feb 1992 | Jun 2026 | Natural Gas |
| Saint Agnes Medical Center | Saint Agnes Medical Center | Fresno, CA | California Independent System Operator (CISO) | 32.1 GWh | Apr 2001 | Jun 2026 | Natural Gas |
| Richmond Cogen | Chevron Products Company-Richmond | Richmond, CA | California Independent System Operator (CISO) | 956.6 GWh | Jul 1992 | Jun 2026 | Natural Gas : 97.6% Other Gas : 2.4% |
| Kern River Eastridge Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 214.3 GWh | May 1988 | Jun 2026 | Natural Gas |
| Blythe Energy Inc | AltaGas Blythe Operations Inc | Blythe, CA | California Independent System Operator (CISO) | 317.7 GWh | Nov 2003 | Jun 2026 | Natural Gas |
| La Paloma Generating Plant | CXA La Paloma LLC | McKittrick, CA | California Independent System Operator (CISO) | 1.1 TWh | Dec 2002 | Jun 2026 | Natural Gas |
| Salinas River Cogeneration | Salinas River Cogeneration Co | San Ardo, CA | California Independent System Operator (CISO) | 255.2 GWh | Oct 1991 | Jun 2026 | Natural Gas |
| CamChino Leasing LLC | CamChino Leasing LLC | Chino, CA | California Independent System Operator (CISO) | 6.9 GWh | Nov 1987 | Dec 2024 | Natural Gas |
| Sunrise Power LLC | Sunrise Power Co LLC | Fellows, CA | California Independent System Operator (CISO) | 2.1 TWh | May 2001 | Jun 2026 | Natural Gas |
| Municipal Cogen Plant | Palm Springs, City of - (CA) | Palm Springs, CA | California Independent System Operator (CISO) | 7.8 GWh | Apr 1985 | Jun 2026 | Natural Gas |
| Wheelabrator Shasta | Shasta Sustainable Resource Management, Inc. | Anderson, CA | California Independent System Operator (CISO) | 289.8 GWh | Sep 1987 | Jun 2026 | Wood/Wood Waste Solids |
| Aera San Ardo Cogen Facility | Aera Energy LLC-San Ardo | San Ardo, CA | California Independent System Operator (CISO) | 19.6 GWh | Jun 1989 | Dec 2025 | Natural Gas |
| New Hogan Power Plant | Modesto Irrigation District | Valley Springs, CA | California Independent System Operator (CISO) | 5.7 GWh | Mar 1989 | Dec 2025 | Water |
| Oak Creek Energy Systems I | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 57.3 GWh | May 1982 | Dec 2025 | Wind |
| East Winds Project | Terra-Gen Operating Co-Wind | Palm Springs, CA | California Independent System Operator (CISO) | 6.4 GWh | Nov 1983 | Dec 2025 | Wind |
| South Belridge Cogeneration Facility | AERA Energy LLC | McKittrick, CA | California Independent System Operator (CISO) | 474.5 GWh | Nov 1985 | Jun 2026 | Natural Gas |
| Southeast Kern River Cogen | Chevron USA Inc | Bakersfield, CA | California Independent System Operator (CISO) | 39.5 GWh | Jan 1989 | Jun 2026 | Natural Gas |
| Coalinga Cogeneration Facility | Aera Energy LLC-Coalinga | Coalinga, CA | California Independent System Operator (CISO) | 42.0 GWh | May 1988 | Dec 2025 | Natural Gas |
| Agnews Power Plant | OLS Energy-Agnews Inc. | San Jose, CA | California Independent System Operator (CISO) | 8.6 GWh | Oct 1990 | Dec 2025 | Natural Gas |
| Mojave 16/17/18 | Terra-Gen Operating Co-Wind | Mojave, CA | California Independent System Operator (CISO) | 66.3 GWh | Nov 1989 | Dec 2025 | Wind |
| PE Berkeley | Berkeley Cogeneration Facility | Berkeley, CA | California Independent System Operator (CISO) | 133.7 GWh | May 1987 | Jun 2026 | Natural Gas |
| MM San Diego-Miramar | MM San Diego Energy-Miramar | San Diego, CA | California Independent System Operator (CISO) | 39.6 GWh | Jun 1997 | Dec 2025 | Landfill Gas : 91.4% Other Biomass Gas : 8.6% |
| San Gorgonio Westwinds II LLC | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 122.6 GWh | May 1999 | Dec 2025 | Wind |
| Los Medanos Energy Center | Los Medanos Energy Center LLC | Pittsburg, CA | California Independent System Operator (CISO) | 2.7 TWh | Jul 2001 | Jun 2026 | Natural Gas |
| MM Lopez Energy | MM Lopez Energy LLC | Lake View Terrace, CA | California Independent System Operator (CISO) | 25.8 GWh | Nov 1998 | Dec 2025 | Landfill Gas |
| Plant No 1 Orange County | Orange County Sanitation Dist - (CA) | Fountain Valley, CA | California Independent System Operator (CISO) | 40.8 GWh | May 1993 | Dec 2025 | Other Biomass Gas : 81.6% Natural Gas : 18.4% |
| Alta Wind Energy Center III | Alta Wind III, LLC | Mojave, CA | California Independent System Operator (CISO) | 318.3 GWh | Jan 2011 | Dec 2025 | Wind |
| Garnet Wind Energy Center | Terra-Gen Operating Co-Wind | North Palm Springs, CA | California Independent System Operator (CISO) | 16.8 GWh | May 2009 | Dec 2025 | Wind |
| El Cajon Energy Center | Wellhead Services, Inc | El Cajon, CA | California Independent System Operator (CISO) | 19.8 GWh | May 2010 | Dec 2025 | Natural Gas |
| Canyon Power Plant | City of Anaheim - (CA) | Anaheim, CA | California Independent System Operator (CISO) | 18.9 GWh | Jul 2011 | Jun 2026 | Natural Gas |
| Alpine Solar | Alpine BESS LLC | Lancaster, CA | California Independent System Operator (CISO) | 114.1 GWh | Jan 2013 | Dec 2025 | Solar |
| Alta Wind Energy Center V | Alta Wind V, LLC | Mojave, CA | California Independent System Operator (CISO) | 253.7 GWh | Mar 2011 | Dec 2025 | Wind |
| Alta Wind Energy Center IV | Alta Wind IV, LLC | Mojave, CA | California Independent System Operator (CISO) | 167.5 GWh | Mar 2011 | Dec 2025 | Wind |
| Ivanpah 2 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 229.0 GWh | Nov 2013 | Jun 2026 | Solar : 97.5% Natural Gas : 2.5% |
| Marsh Landing Generating Station | Marsh Landing LLC | Antioch, CA | California Independent System Operator (CISO) | 18.4 GWh | Apr 2013 | Jun 2026 | Natural Gas |
| SunEdison Anheuser Busch Fairfield | SunE M5 Holdings LLC | Fairfield, CA | California Independent System Operator (CISO) | 1.0 GWh | Nov 2008 | Dec 2025 | Solar |
| Chuckawalla Valley State Prison | SunE CPA CDC1 LLC | Blythe, CA | California Independent System Operator (CISO) | 502.0 MWh | May 2006 | Dec 2025 | Solar |
| Mojave Solar Project | Mojave Solar LLC | Hinkley, CA | California Independent System Operator (CISO) | 595.9 GWh | Nov 2014 | Jun 2026 | Solar |
| Vaca Dixon Solar Station | Pacific Gas & Electric Co. | Vacaville, CA | California Independent System Operator (CISO) | 3.3 GWh | Nov 2009 | Dec 2025 | Solar |
| Panoche Valley Solar Farm | RWE Clean Energy | Paicines, CA | California Independent System Operator (CISO) | 235.3 GWh | Dec 2017 | Jun 2026 | Solar |
| Avenal Park | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 10.0 GWh | Jul 2011 | Dec 2025 | Solar |
| Sun City Project LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 33.4 GWh | Jul 2011 | Dec 2025 | Solar |
| Sand Drag LLC | Avenal Solar Holdings LLC | Avenal, CA | California Independent System Operator (CISO) | 31.9 GWh | Jul 2011 | Dec 2025 | Solar |
| Agua Caliente Solar Project | Agua Caliente Solar | Dateland, AZ | California Independent System Operator (CISO) | 514.5 GWh | Apr 2012 | Jun 2026 | Solar |
| AV Solar Ranch One | AV Solar Ranch 1 LLC | Lancaster, CA | California Independent System Operator (CISO) | 560.8 GWh | Jul 2014 | Jun 2026 | Solar |
| SunEdison Walmart Apple Valley DC | SunE M5 Holdings LLC | Apple Valley, CA | California Independent System Operator (CISO) | 715.0 MWh | Feb 2009 | Nov 2025 | Solar |
| SunEdison Ironwood State Prison | SunE CPA CDC2 LLC | Blythe, CA | California Independent System Operator (CISO) | 1.4 GWh | Apr 2008 | Dec 2025 | Solar |
| Mariani Packing Vacaville Solar | SunE U6 Holdings LLC | Vacaville, CA | California Independent System Operator (CISO) | 586.0 MWh | Oct 2008 | Dec 2025 | Solar |
| SunEdison Walgreens Moreno Valley | SunE WG113 Moreno Valley LLC | Moreno Valley, CA | California Independent System Operator (CISO) | 599.0 MWh | Aug 2007 | Dec 2025 | Solar |
| UCI Facilities Management Central Plant | University of California Irvine | Irvine, CA | California Independent System Operator (CISO) | 113.8 GWh | Jun 2007 | Jun 2026 | Natural Gas |
| CM10 | RWE Clean Energy | Boulder City, NV | California Independent System Operator (CISO) | 18.4 GWh | Nov 2008 | Dec 2025 | Solar |
| G2 Energy Ostrom Road LLC | G2 Energy LLC | Wheatland, CA | California Independent System Operator (CISO) | 27.7 GWh | Jan 2009 | Dec 2025 | Landfill Gas |
| Solar Blythe LLC | NRG Solar Blythe | Blythe, CA | California Independent System Operator (CISO) | 38.8 GWh | Nov 2009 | Dec 2025 | Solar |
| Ivanpah 3 | NRG Energy Services | Nipton, CA | California Independent System Operator (CISO) | 192.5 GWh | Nov 2013 | Jun 2026 | Solar : 97.0% Natural Gas : 3.0% |
| Calabasas Gas to Energy Facility | Los Angeles County Sanitation | Agoura, CA | California Independent System Operator (CISO) | 31.9 GWh | Jun 2010 | Dec 2025 | Landfill Gas |
| Imperial Valley Solar, LLC | Imperial Valley Solar, LLC | Calexico, CA | California Independent System Operator (CISO) | 441.7 GWh | Oct 2013 | Dec 2025 | Solar |
| Orange Grove Peaking Facility | Orange Grove Energy LP | Pala, CA | California Independent System Operator (CISO) | 9.1 GWh | May 2010 | Dec 2025 | Natural Gas |
Summary of Power Plants By State
Figures are based on June 2026 generation numbers.| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Alabama | # 9 | 77 | 12,594.28 GWh |
| Alaska | # 48 | 140 | 563.53 GWh |
| Arizona | # 11 | 199 | 11,138.97 GWh |
| Arkansas | # 21 | 117 | 6,425.86 GWh |
| California | # 4 | 1,744 | 17,197.11 GWh |
| Colorado | # 29 | 309 | 4,933.21 GWh |
| Connecticut | # 34 | 173 | 3,737.86 GWh |
| Delaware | # 49 | 35 | 376.53 GWh |
| District of Columbia | # 51 | 17 | 18.29 GWh |
| Florida | # 2 | 342 | 26,309.59 GWh |
| Georgia | # 7 | 250 | 13,880.75 GWh |
| Hawaii | # 47 | 70 | 767.91 GWh |
| Idaho | # 41 | 152 | 2,099.32 GWh |
| Illinois | # 5 | 494 | 16,673.62 GWh |
| Indiana | # 18 | 222 | 8,401.10 GWh |
| Iowa | # 23 | 297 | 6,139.01 GWh |
| Kansas | # 25 | 188 | 5,758.25 GWh |
| Kentucky | # 22 | 61 | 6,181.49 GWh |
| Louisiana | # 15 | 90 | 9,779.36 GWh |
| Maine | # 45 | 242 | 1,215.46 GWh |
| Maryland | # 36 | 228 | 3,591.08 GWh |
| Massachusetts | # 44 | 666 | 1,410.23 GWh |
| Michigan | # 14 | 276 | 9,804.74 GWh |
| Minnesota | # 30 | 790 | 4,889.70 GWh |
| Mississippi | # 20 | 60 | 6,899.16 GWh |
| Missouri | # 24 | 129 | 6,066.44 GWh |
| State | Rank | Active Plants | Jun 2026 Generation |
|---|---|---|---|
| Montana | # 40 | 71 | 2,225.73 GWh |
| Nebraska | # 39 | 126 | 3,184.64 GWh |
| Nevada | # 31 | 117 | 4,654.59 GWh |
| New Hampshire | # 43 | 57 | 1,659.52 GWh |
| New Jersey | # 28 | 398 | 5,055.63 GWh |
| New Mexico | # 33 | 159 | 4,408.01 GWh |
| New York | # 10 | 1,064 | 11,564.60 GWh |
| North Carolina | # 8 | 913 | 12,773.20 GWh |
| North Dakota | # 35 | 59 | 3,713.80 GWh |
| Ohio | # 6 | 213 | 13,969.06 GWh |
| Oklahoma | # 17 | 144 | 9,156.03 GWh |
| Oregon | # 27 | 281 | 5,322.08 GWh |
| Pennsylvania | # 3 | 259 | 21,018.65 GWh |
| Rhode Island | # 46 | 107 | 854.92 GWh |
| South Carolina | # 16 | 209 | 9,442.42 GWh |
| South Dakota | # 42 | 53 | 1,803.66 GWh |
| Tennessee | # 19 | 99 | 7,036.17 GWh |
| Texas | # 1 | 1,028 | 57,844.67 GWh |
| Utah | # 38 | 129 | 3,196.09 GWh |
| Vermont | # 50 | 118 | 180.62 GWh |
| Virginia | # 12 | 250 | 10,352.13 GWh |
| Washington | # 13 | 135 | 10,051.77 GWh |
| West Virginia | # 32 | 41 | 4,489.44 GWh |
| Wisconsin | # 26 | 266 | 5,542.48 GWh |
| Wyoming | # 37 | 69 | 3,318.53 GWh |