Bishop Ranch BR 1-X
6101 Bollinger Canyon Rd, San Ramon, CA 94583Plant Summary Information
Bishop Ranch BR 1-X is ranked #799 out of 917 solar farms in California in terms of total annual net electricity generation.
Bishop Ranch BR 1-X generated 220.0 MWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Bishop Ranch BR 1-X |
|---|---|
| Utility Name | Bollinger Canyon Road BR 1-X Solar Project 2020 |
| Location | Contra Costa County, CA |
| Initial Operation Date | March 2022 |
| Last Update | Dec 2025 |
| Annual Generation | 1.5 GWh |
| Annual Consumption | 5.4 k MMBtu |
| Ranked #11,747 out of 13,301 Power Plants Nationwide | |
| Ranked #6,514 out of 7,209 Solar Power Plants Nationwide | |
| Ranked #1,493 out of 1,641 California Power Plants | |
| Ranked #799 out of 917 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Bishop Ranch BR 1-X
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Bishop Ranch BR 1-X.
Monthly Net Generation for Bishop Ranch BR 1-X
Monthly Plant Fuel Consumption for Bishop Ranch BR 1-X
Bishop Ranch BR 1-X Details
| Summary Information | |
|---|---|
| Plant Name | Bishop Ranch BR 1-X (67743) |
| Plant Address | 6101 Bollinger Canyon Rd, San Ramon, CA 94583 |
| Utility | Bollinger Canyon Road BR 1-X Solar Project 2020 (66355) |
| Latitude, Longitude | 37.75976, -121.95596 |
| Generation Dates on File | Jan 2024 to Dec 2025 |
| Initial Operation Date | March 2022 |
| Annual Generation | 1.5 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | Yes |
| FERC Small Power Producer Docket Number | 21-1056-000; 21-1056-001; 21-1056-002 |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Utilities (22) |
| Sector | IPP Non-CHP (2) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 0.48 kV |
| Energy Storage | Yes |
Generator 4057B Details Operating March 2022
| Technology | Batteries |
|---|---|
| Prime Mover | Battery |
| Ownership | Single Owner |
| Nameplate Capacity | 0.5 MW |
| Summer Capacity | 0.5 MW |
| Winter Capacity | 0.5 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Electricity used for energy storage |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Time From Cold Shutdown To Full Load | 10M |
| Multiple Fuels | No |
| Energy Storage Details | |
| Nameplate Energy Capacity MWH | 1.1 |
|---|---|
| Maximum Charge Rate | 0.5 MW |
| Maximum Discharge Rate | 0.5 MW |
| Storage Technology | LIB |
| Nameplate Reactive Power Rating | 1 |
| Storage Enclosure Type | CS |
| System Peak Shaving | Yes |
| Load Management | P |
| Excess Wind And Solar Generation | Yes |
| Ac Coupled | Yes |
| Direct Support Of Another Unit | Yes |
| Direct Support Plant Id | 67743 / 67743 |
| Direct Support Gen Id | 4057C / 4057R |
| Support T D Asset | No |
Generator 4057C Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.6 MW |
| Summer Capacity | 0.6 MW |
| Winter Capacity | 0.6 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 153 |
| Tilt Angle | 5 |
| DC Net Capacity | 0.8 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.8 MW |
| Virtual Net Metering Agreement | No |
Generator 4057R Details Operating March 2022
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Single Owner |
| Nameplate Capacity | 0.3 MW |
| Summer Capacity | 0.3 MW |
| Winter Capacity | 0.3 MW |
| Uprate/Derate Completed | No |
| Status | Operating |
| First Operation Date | March 2022 |
|---|---|
| Combined Heat & Power | No |
| Sector Name | IPP Non-CHP (2) |
| Energy Source | Solar |
| Solid Fuel Gasification | No |
| Carbon Capture Technology | No |
| Multiple Fuels | No |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 243 |
| Tilt Angle | 10 |
| DC Net Capacity | 0.3 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 0.3 MW |
| Virtual Net Metering Agreement | No |
Bishop Ranch BR 1-X Plant Owners
| Owner Name | Address | Generator | Ownership | We couldn't locate any owners for this plant |
|---|
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #6504 | Cherry Valley Solar, LLC CSG | Leicester, MA | 1.5 GWh |
| #6505 | Oswego County - Fulton Solar | Fulton, NY | 1.5 GWh |
| #6506 | Methuen Landfill | Methuen, MA | 1.5 GWh |
| #6507 | US GSA - Sacramento | Sacramento, CA | 1.5 GWh |
| #6508 | Mayberry Solar LLC | Mt. Airy, NC | 1.5 GWh |
| #6509 | MNCPPC Germantown Solar | Boyds, MD | 1.5 GWh |
| #6510 | Silver Lake Garden | Waseca, MN | 1.5 GWh |
| #6511 | The Source at White Plains (UBS) | White Plains, NY | 1.5 GWh |
| #6512 | McAllister Landfill | Portsmouth, RI | 1.5 GWh |
| #6513 | Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh |
| #6515 | St. Clair Solar 5 | Lebanon, IL | 1.5 GWh |
| #6516 | JH Solar, LLC CSG | North Brookfield, MA | 1.5 GWh |
| #6517 | CSUF State College | Fullerton, CA | 1.5 GWh |
| #6518 | RC Energy AA LLC Solar Facility | Albuquerque, NM | 1.5 GWh |
| #6519 | Owens Corning Headquarters | Toledo, OH | 1.5 GWh |
| #6520 | Stage Gulch Solar | Petaluma, CA | 1.5 GWh |
| #6521 | Western Michigan Solar Gardens | Kalamazoo, MI | 1.5 GWh |
| #6522 | Hot Springs 2020 | Hot Springs, AR | 1.5 GWh |
| #6523 | Jackson Co. Solar RES | Columbus, IN | 1.5 GWh |
| #6524 | Erving CSG | Erving, MA | 1.5 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Bishop Ranch BR 1-X.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Ameresco Vasco Road | Livermore, CA | 32.7 GWh | 12.4 mi |
| AT&T - Hayward | Hayward, CA | 7.6 GWh | 10.3 mi |
| Bishop Ranch - BR 1-Y | San Ramon, CA | 1.7 GWh | 0.2 mi |
| Bishop Ranch - BR 15-AA | San Ramon, CA | 766.0 MWh | 1.1 mi |
| Bishop Ranch - BR 15-CC | San Ramon, CA | 950.0 MWh | 1 mi |
| Bishop Ranch - BR 15-DD | San Ramon, CA | 62.0 MWh | 0.9 mi |
| Bishop Ranch - BR 2600 | San Ramon, CA | 764.0 MWh | 0.6 mi |
| Bishop Ranch - BR 8-O | San Ramon, CA | 1.4 GWh | 0.9 mi |
| Bishop Ranch - BR 8-P | San Ramon, CA | 1.3 GWh | 0.8 mi |
| Bishop Ranch - BR 8-Q | San Ramon, CA | 871.0 MWh | 0.9 mi |
| Kaiser Owens Dr. Fuel Cell | Pleasanton, CA | 7.9 GWh | 5.4 mi |
| KSR028 Merced Fuel Cell | San Leandro, CA | 16.4 GWh | 12 mi |
| Las Positas College | Livermore, CA | 1.7 GWh | 9.2 mi |
| Life Technologies - Pleasanton | Pleasanton, CA | 8.3 GWh | 8.9 mi |
| Preferred Freezer San Leandro | San Leandro, CA | 3.0 GWh | 11.1 mi |
| Russell City Energy Center | Hayward, CA | 1.8 TWh | 13 mi |
| Santa Rita Jail Fuel Cell | Dublin, CA | 8.1 GWh | 4.7 mi |
| Santa Rita Jail Hybrid | Dublin, CA | 10.4 GWh | 4.7 mi |
| Thermo Fisher Pleasanton | Pleasanton, CA | 1.5 GWh | 8.8 mi |
| Vasco Winds | Livermore, CA | 233.7 GWh | 13.2 mi |