Wonderful Orchards - West Valley
SW L2 18 26 19 PV, Blackwells Corner, CA 93249Plant Summary Information
Wonderful Orchards - West Valley is ranked #366 out of 885 solar farms in California in terms of total annual net electricity generation.
Wonderful Orchards - West Valley generated 1.2 GWh during the 3-month period between September 2025 to December 2025.
| Plant Name | Wonderful Orchards - West Valley |
|---|---|
| Utility Name | Wonderful Renewable Energy, LLC. |
| Location | Kern County, CA |
| Initial Operation Date | October 2020 |
| Last Update | Dec 2025 |
| Annual Generation | 8.0 GWh |
| Annual Consumption | 28.4 k MMBtu |
| Ranked #6,960 out of 13,081 Power Plants Nationwide | |
| Ranked #2,537 out of 7,015 Solar Power Plants Nationwide | |
| Ranked #913 out of 1,606 California Power Plants | |
| Ranked #366 out of 885 California Solar Power Plants | |
| Fuel Types | Solar |
Map of Wonderful Orchards - West Valley
Full Screen MapRegister Now for Comprehensive Access
Subscribe now to access all power plant data, utility information, FERC EQR data, and more for Wonderful Orchards - West Valley.
Monthly Net Generation for Wonderful Orchards - West Valley
Monthly Plant Fuel Consumption for Wonderful Orchards - West Valley
Wonderful Orchards - West Valley Details
| Summary Information | |
|---|---|
| Plant Name | Wonderful Orchards - West Valley (67913) |
| Plant Address | SW L2 18 26 19 PV, Blackwells Corner, CA 93249 |
| Utility | Wonderful Renewable Energy, LLC. (63689) |
| Latitude, Longitude | 35.6582, -119.97295 |
| Generation Dates on File | Sep 2024 to Dec 2025 |
| Initial Operation Date | October 2020 |
| Annual Generation | 8.0 GWh |
| Fuel Types | Solar |
| Federal Energy Regulatory Commission (FERC) Information | |
| FERC Cogeneration Status | No |
| FERC Small Power Producer Status | No |
| FERC Exempt Wholesale Generator Status | No |
| Regulatory Information | |
|---|---|
| Regulatory Status | Non-Regulated |
| NERC Region | WECC |
| Balancing Authority | California Independent System Operator (CISO) |
| NAICS Code | Crop Production (111) |
| Sector | Industrial Non-CHP (6) |
| Water Source | |
| Ash Impoundment | No |
| Transmission / Distribution Owner | Pacific Gas & Electric Co. (14328) CA |
| Grid Voltage | 69.00 kV |
| Energy Storage | No |
Generator WOWV Details Operating October 2020
| Technology | Solar Photovoltaic |
|---|---|
| Prime Mover | Photovoltaic |
| Ownership | Wholly Owned by Other Entity |
| Nameplate Capacity | 3 MW |
| Summer Capacity | 3 MW |
| Winter Capacity | 3 MW |
| Minimum Load | 0.1 MW |
| Uprate/Derate Completed | No |
|---|---|
| Status | Operating |
| First Operation Date | October 2020 |
| Combined Heat & Power | No |
| Sector Name | Industrial Non-CHP (6) |
| Energy Source | Solar |
| Solar Details | |
| Single Axis Tracking | Yes |
|---|---|
| Azimuth Angle | 35 |
| Tilt Angle | 26 |
| DC Net Capacity | 3.6 MW |
| Crystalline Silicon | Yes |
| Net Metering Agreement | Yes |
| Net Metering DC Capacity | 3.3 MW |
| Virtual Net Metering Agreement | No |
Wonderful Orchards - West Valley Plant Owners
| Owner Name | Address | Ownership |
|---|---|---|
| Wonderful Orchards LLC | 6801 E Lerdo Hwy, Shafter, CA 93263 | 100.00% |
Power Plants with Similar Net Generation
Power plants with a similar annual net generation from Solar.
| Rank | Plant Name | Plant Location | Annual Generation |
|---|---|---|---|
| #2527 | Castleton | Castleton on Hudson, NY | 8.1 GWh |
| #2528 | Loring | Limestone, ME | 8.1 GWh |
| #2529 | Wellons Farm | Smithfield, NC | 8.1 GWh |
| #2530 | Fort Fairfield | Fort Fairfield, ME | 8.1 GWh |
| #2531 | Washington Millfield Solar, LLC | Bath, NC | 8.0 GWh |
| #2532 | B.R. Sauk Rapids CSG | Sauk Rapids, MN | 8.0 GWh |
| #2533 | Mohave Electric at Fort Mohave | Fort Mohave, AZ | 8.0 GWh |
| #2534 | CalCity Solar 1 | California City, CA | 8.0 GWh |
| #2535 | Bellisario Solar 3 | Lapeer, NY | 8.0 GWh |
| #2536 | Wildflower Way Solar | Bath, NY | 8.0 GWh |
| #2538 | Walcott Solar CSG | Faribault, MN | 8.0 GWh |
| #2539 | North Bridgton | Oakland, ME | 8.0 GWh |
| #2540 | UC Merced Solar Hybrid | Merced, CA | 8.0 GWh |
| #2541 | Farmingdale FA01 | Farmingdale, ME | 8.0 GWh |
| #2542 | South Winston Farm, LLC | Winston-Salem, NC | 8.0 GWh |
| #2543 | Pinesage | West End, NC | 8.0 GWh |
| #2544 | Ursa Community Solar | Farmington, MN | 8.0 GWh |
| #2545 | Gopher CSG | Taylor Falls, MN | 8.0 GWh |
| #2546 | Lenoir Farm 2 | Kinston, NC | 8.0 GWh |
| #2547 | Chadbourn Farm | Whiteville, NC | 8.0 GWh |
Nearby Power Plants
Below are closest 20 power plants surrounding Wonderful Orchards - West Valley.
| Plant Name | Plant Location | Annual Generation | Distance |
|---|---|---|---|
| Berrenda Mesa Water District | Lost Hills, CA | 14.8 GWh | 6.7 mi |
| Blackwell Solar Park | Lost Hills, CA | 39.0 GWh | 7.9 mi |
| Chevron - Lost Hills Hybrid | Lost Hills, CA | 64.4 GWh | 16.1 mi |
| Community Solar Utica 1, LLC | Kettleman, CA | 2.3 GWh | 20.1 mi |
| Coronal Lost Hills | Lost Hills, CA | 35.4 GWh | 6 mi |
| Elk Hills Cogen | Tupman, CA | 88.5 GWh | 18.1 mi |
| Lost Hills Cogeneration Plant | Lost Hills, CA | 7.5 GWh | 11.6 mi |
| Lost Hills Oilfield | Lost Hills, CA | 4.3 GWh | 6.9 mi |
| Lost Hills/Blackwell | Lost Hills, CA | 58.9 GWh | 7.4 mi |
| Morelos del Sol | Lost Hills, CA | 31.2 GWh | 10 mi |
| Nickel 1 Solar Facility | Lost Hills, CA | 2.1 GWh | 14.4 mi |
| SF Azalea, LLC | Lost Hills, CA | 68.4 GWh | 8.7 mi |
| South Belridge Cogeneration Facility | McKittrick, CA | 473.9 GWh | 21.3 mi |
| Topaz Solar Farm | Santa Margarita, CA | 967.4 GWh | 18.3 mi |
| Wildwood Solar I, LLC | Wasco, CA | 48.3 GWh | 22.4 mi |
| Wonderful Huller & Shelling | Lost Hills, CA | 3.7 GWh | 11.8 mi |
| Wonderful Kings | Lost Hills, CA | 7.6 GWh | 9.6 mi |
| Wonderful Lost Hills | Lost Hills, CA | 41.4 GWh | 5.5 mi |
| Wonderful Orchards - Belridge | Lost Hills, CA | 12.4 GWh | 16.6 mi |
| Wonderful Orchards - Westside | Lost Hills, CA | 13.2 GWh | 13.8 mi |